Project Management Office


—Celia Desmond
Vice President Membership MANY companies have a work and optimization of staff
utilization, on-time completion,
department, called a Project within budget completion, even
Management Office, which works satisfaction of customers and
with the project managers in of team members. Because of
various ways. What is this Project this focus on key improvements,
IEEE DOI 10.1109/EMR.2015.2393512
Management Office, or PMO, and the use of the office has now
what do they do? expanded to almost every type of
industry, and the offices support
In fact, there are various models projects of every type, with
for such an office, all valid, deliverables that are both internal
with each bringing value to the and external to the company.
organization. The PMO is always
a center for project management The offices are not all set up
knowledge within the company, according to the same model.
and it is always used as a resource In fact, there are three or four
to support and assist the project models which are common.
managers. The PMO also acts as a
resource for the executives of the Support—the PMO provides direct
organization, because they are support to the project managers
interested in the benefits that the and project teams, in the form of
PMO provides. More on that later. processes, measures and direct
manpower.
What is the PMO? This office
was initially introduced in Directing—the PMO sets
industries such as aerospace and the standards for project
heavy construction, where the management, defines the
companies ran multiple projects processes and the measures, and
in parallel and the success of assesses the project work and
the projects was very critical. results.
The office was put in place to
ensure knowledge and use of Controlling—the PMO monitors
the best standards for project all project activities, and takes
management across all projects. action to control key parameters
In order to improve overall project related to cost, schedule, scope
success across all projects, the and quality.
offices looked for best practices,
and used these to introduce The PMO determines which
standard company wide-project parameters should be measured,
processes. and the measurement tools,
techniques and data often all
This offices ensured that reside in the PMO. The PMO
all projects used the same also looks at documentation
methodologies, with a focus to be used in managing the
on the different process areas projects, and often develops
such as communication, time, and maintains forms and lists as
cost, and scope management. tools the project managers. The
The offices measured the key PMO measures many parameters
performance indicators which and shares the KPI's with the
are of interest to executives executives and staff. The PMO
in all companies—things like often provides the training for the
time to market, project launch
to completion, efficiency of
16 IEEE ENGINEERING MANAGEMENT REVIEW, VOL. 43, NO. 1, FIRST QUARTER, MARCH 2015

PM's both on the job and in the Because project teams frequently Please send your comments
form of courses. need to use resources from or questions to me at
multiple different company (c.desmond@ieee.org).
Project Management Knowledge departments, the PMO helps
is corporate IP. This knowledge to break down corporate silos,
resides in the PMO. It may also building understanding of the
reside in other departments, goals, functions and personnel of
because sometimes the project other departments.
managers report into the PMO,
while sometimes they remain Overall, the benefits of the PMO
in the functional departments. far outweigh the costs of staffing
In both cases the PMO provides the office, in payback in corporate
the knowledge, training, and efficiency, client satisfaction and
standards which the PM's use. staff effectiveness.