AWI-PGE-LB-SOP-04 Corrective Maintenance Non Rotating Equipment

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

PTADIIKARIWIISESAINDONESIA

Item No :
Item Name :
Client :
End User :
Project Name :

Document Tittle:
STANDARD OPERATING PROCEDURE
CORRECTIVE MAINTENANCE NON ROTATING EQUIPMENT
Document Number : AWI-PGE-LB-SOP-04 PAGE OF
1 2
Distribution List :

1 Spv. Maintenance Non Rotating Equipment


2 Leader Non Rotating Equipment
3 Technician
4.Admin
5. HSSE
Rev Date Description Prepared Checked Approved
by by by
0 06/04/2021 Issue for Approval AD ANF DIR

Copyright of PT Adikari Wisesa Indonesia


DOCUMENT TITLE
STANDARD OPERATING PROCEDURE
CORRECTIVE MAINTENANCE NON ROTATING EQUIPMENT
Document No. Revision No. Revision Date
AWI-PGE-LB-SOP-04 0

A. Equipment
1. Kendaraan 4WD (Double Cabin)
2. Hand Tool
3. Thermogun
4. Grease Gun
5. Thickness
6. Vibration
7. Spare Part Equipment
8. Chcklist Sheet Corrective Maintenance Non Rotating Equipment

B. Preparation (setiap pukul 07.00 WIB)


1. Pastikan kendaraan bermotor yang digunakan masih dalam kondisi baik dan terkalibrasi.
2. Pastikan handtool yang dibawa sesuai yang akan digunakan.
3. Pastikan spare part yang di bawa sudah sesuai sehingga tidak perlu bolak balik ke logistik
4. Pastikan alat pelindung diri (safety shoes, helmet) dalam kondisi baik dan siap untuk digunakan.

C. Melakukan pekerjaan preventive maintenance rotating equipment


1. Test Run Equipment Non rotating (Jika diperlukan)
2. Pengecekan visual kebocoran equipment non rotating
3. Pengecekan equipment non rotating yang rusak
4. Jika Equipment running ukur temparature kerja non rotating
5. Jika Equipment running ukur vibrasi kerja non rotating
6. Cek Level Pelumas (oli/grease)
7. Catat semua parameter yang bisa diukur
8. Jika level kurang maka isi pelumas tersebut
9. Lakukan penggantian spare part yang rusak
10. Penggantian filter untuk equipment penggerak diesel
11. Test run setelah spare part di ganti

D. Peeformance Test Equipment Rotating (Sampai pukul 16.00)


1. Setelah dilakukan perbaikan atau pengecekan lakukan run test (jika rotating stanby)
2. Cek parameter yang bisa di ukur temperatur, pressure, vibrasi dll
3. Validasi hasil perbaikan dengan dibuktikan ceklist harian, mingguan, dan bulanan di ttd oleh user