Safe Operating Procedure

HS-SOP-013
Gantry Crane PFS
DO NOT use this machine unless you have been instructed
in its safe use and operation and have been given permission
PERSONAL PROTECTIVE EQUIPMENT

 Manual Handling.
 Moving or rotating parts. OPERATIONAL SAFETY CHECKS
 Falling Objects
 Lifting operations.  Ensure attaching lifting sling, chain, or load levelling
device to the hook of the crane is to be performed by a
 Suspended Loads. Rigger or Dogger or by appropriately trained person.

PRE-OPERATIONAL SAFETY CHECKS


 Position the gantry hook centred directly above the load
to be lifted.

 Ensure operator has required training and current  ALWAYS make sure the load is properly seated in the
Verification of Competency to use the gantry crane and/or hook and the safety latch of the hook is engaged.
attach lifting gear to the load.  Take up any slack of the lifting equipment and raise
 Ensure the three month crane test and maintenance slightly. Check the balance of the load.
certificates and records are current.  Ensure the slings are secure and load is free.
 Ensure control pendant, emergency stops, path of travel,  Check the travel path is clear.
guide ropes and hooks are in serviceable condition.

 Conduct Pre-operational checklist for Gantry Crane and  Ensure the load hangs vertically below the hook at all
times.
record in Log Book. Isolate and Tag out of service if faults
are found and report to your supervisor.  Ensure the load is only lifted sufficiently to clear any
 Ensure gantry crane has a nominated SWL/WLL clearly obstructions.
visible on the cross beam.  Ensure Tag lines are connected to load.
 Ensure load to be lifted is within the SWL/WLL of the  In the event that the load swings move the gantry crane
crane and the available lifting gear (i.e. 2t load using 2t in the direction of the swing if possible.
chains) and attached to a gantry of 2t rated lifting
capacity.  Ensure the landing area is free of obstruction.
 Ensure all lifting gear has been tested and tagged and is  Ensure the load will not catch on anything during the
in current test certification (chains, shackles, slings, and lowering of the load.
hooks).  Ensure the load is positioned correctly on the ground
 Ensure lifting gear is inspected and showing no signs of without the potential to shift.
damage – rips, tears wear marks or sharp edges and that
the SWL/WLL is legible. If damaged, tag out of service ENDING OPERATIONS AND CLEANING
and report to your supervisor.
UP
 Clear area of unauthorised personnel.
 Ensure the lifting path is clear of obstructions that will  Unhook lifting devices from load, lift hook assembly into
gantry beam and position the gantry in a safe position.
hinder the raising and lowering of the object.

 Ensure all lifting points for the load are inspected by a  Inspect lifting gear to ensure no damage has occurred.
Rigger or Dogger or by appropriately trained person  Store lifting gear in a dry and clean area free from
chemical influences and vapours.

 Isolate the energy source to the Gantry Crane.

DM#12144732
Template – HS-FRM-004 – DM#10698397
Safe Operating Procedure
HS-SOP-013
DON’T
 NEVER leave the load suspended or unattended.

 NEVER allow swinging of the load,

 Do not direct the equipment towards other people.

 Do not allow anyone to work or enter under a


suspended load.

 Do not operate the gantry crane unless you are fully


trained and authorised to do so.

 Never overload the SWL of the Gantry Crane

 Never lift/lower more than the marked SWL of the lifting


gear.

This SOP does not necessarily cover all possible


hazards associated with this equipment and should be
used in conjunction with other references. It is
designed as a guide to be used to compliment training
and as a reminder to users prior to equipment use