Kuda-kuda 8/10
Reng 2/3 23
Gording 8/10
23
Tiang Kuda-kuda 8/12
23
Ring Balok 15/20
23
Gording 8/12
2.36
Tupai-tupai 8/12 23
23
23
23
Pas. Batu Bata
23
Pas. Batu Bata Sloof 15/20
23
Sloof 15/20
Pondasi Batu Alam
23
Pondasi Batu Alam
23
0.70 23
TAMPAK DEPAN 3.00 3.00
0.70
3.00 3.00 Skala 1 : 100 0.20 23
Lisplank 2/20
80
6.00
RENCANA KUDA-KUDA
TAMPAK BELAKANG TAMPAK DEPAN
Skala 1 : 30
Skala 1 : 100
Skala 1 : 100 TAMPAK SAMPING
Skala 1 : 100
50
1.00
1000
Pondasi Batu Kali
3.00
Kolom 15/15
6000
6.00
PEREMBESAN
3.00
2.00
SEPTIC TANK
Meteran Air
1000
6.00
6.00 B A 5
20 30 15
3.00
5
3.00
Plafond Triplek 4 mm
4.00
60/120cm
4.00
C
6.00
6.00
C
KP + 3.00 Saklar Tunggal 5 30 5
3.00
3.00
Lampu Pijar
KP + 3.00
40
2.00
KP + 3.00
KP ± 0.00
2.00
B Stop kontak
D D
KP ± 0.05 KP ± 0.05
5
100 96
5
220 225
96 100
220 225
220 225
5 90 5 90
15
94 94
1015 195
75.5
150
940
2015
40
Detail Kusen B 75.5
15 5
82.5
15
Skala 1 : 25 82.5
Detail Kusen D
Detail Kusen A
Detail Kusen C Skala 1 : 25
Skala 1 : 25
Skala 1 : 25