Construction of NH-56, 4-lane bypass connecting NH-56 at Km 17+400 and terminating near Behta Village Road (bypass Chainage

from Km 0.000 to Km
Project :
32.000/31.489 Average length 31.745 Km) in the State of Uttar Pradesh (Lucknow) under NHDP Phase -VII “on EPC Mode.
Client : National Highway Authority of India (Ministry of Road Transport & Highways Government of India)
Authority Engineer : Theme Engineering Service Pvt. Ltd
EPC Contractor : PNC Infratech Limited
Total Length of Project : 31.745 Kms.
Contract Price (INR) : 1062,00,00,000.00
PERIOD : 23 March.-2021 To 25 April-2021
STAGE PAYMENT STATEMENT NO. - 7
Quantities as per Scope Quantities as per Certified Work Amount as per Certified Work Done
Certified
Sl No. Item Description Unit BOQ Amount Certified Certified Certified Upto Remarks
Quantity Rate Upto This bill This bill
(In Rs.) Upto date Upto date Previous
Previous
1. Road works including Culverts, widening and repair of
B.1 - New 4 - Lane bypass (Flexible pavement)
B-1/1 Earthwork upto top of the sub-grade KM 33.111 1,24,62,878 41,26,58,366 5.680 3.650 2.030 7,07,89,149 4,54,89,506 2,52,99,643
B-1/2 Sub-Base Course KM 61.267 95,77,953 58,68,12,454 3.940 2.410 1.530 3,77,37,135 2,30,82,867 1,46,54,268
B-1/3 Non Bituminous Base KM 60.945 1,11,28,568 67,82,30,582 0.820 - 0.820 91,25,426 - 91,25,426
B-1/4 Bituminous Base Course KM 60.945 1,53,18,541 93,35,88,482 - - - - - -
B-1/5 Wearing Coat KM 61.901 69,05,690 42,74,69,125 - - - - - -

C.1 - New Service Road (Flexible pavement)


C-1/1 Earthwork up to top of the sub-grade KM 60.437 64,47,642 38,96,76,155 26.740 20.310 6.430 17,24,09,954 13,09,51,614 4,14,58,340
C-1/2 Sub-Base Course KM 60.437 89,82,757 54,28,90,895 21.580 15.460 6.120 19,38,47,900 13,88,73,426 5,49,74,474
C-1/3 Non Bituminous Base KM 60.437 84,16,582 50,86,72,937 10.450 6.420 4.030 8,79,53,277 5,40,34,453 3,39,18,823
C-1/4 Bituminous Base Course KM 60.437 55,77,253 33,70,72,428 10.385 4.655 5.730 5,79,19,770 2,59,62,112 3,19,57,659
C-1/5 Wearing Coat KM 60.784 39,49,007 24,00,36,426 - - - -

D. New Culverts on Bypasses:


1 Culverts (length < 6 m) Nos. 34 14,72,063 5,00,50,148 31.00 29.00 2.00 4,56,33,959 4,26,89,832 29,44,126
2. Minor Bridges / Underpasses/ Overpasses
A2 - New Minor bridges (Length > 6 and < 60m)
Foundation + Sub-Structure : On completion of the foundation
A2/1 work including foundations for wing and return walls,
abutments, piers upto the abutment/pier cap.
MNB 3x10 - 01 Nos - BHS Nos. 10 38,66,125 3,86,61,251 10.00 7.00 3.00 3,86,61,251 2,70,62,876 1,15,98,375
MNB 2x7.5 - 03 Nos - BHS Nos. 20 28,99,594 5,79,91,877 20.00 18.00 2.00 5,79,91,877 5,21,92,690 57,99,188
MNB 1x20 - 02 Nos - BHS Nos. 12 42,95,695 5,15,48,335 6.00 6.00 - 2,57,74,168 2,57,74,168 -
MNB 2x10 - 01 Nos - BHS Nos. 8 32,21,771 2,57,74,168 8.00 5.00 3.00 2,57,74,168 1,61,08,855 96,65,313
MNB 1x12 - 01 Nos - BHS Nos. 8 19,33,063 1,54,64,501 4.00 4.00 - 77,32,250 77,32,250 -
MNB 1x10 - 02 Nos - BHS Nos. 12 21,47,847 2,57,74,168 2.00 2.00 - 42,95,695 42,95,695 -
Construction of NH-56, 4-lane bypass connecting NH-56 at Km 17+400 and terminating near Behta Village Road (bypass Chainage from Km 0.000 to Km
Project :
32.000/31.489 Average length 31.745 Km) in the State of Uttar Pradesh (Lucknow) under NHDP Phase -VII “on EPC Mode.
Client : National Highway Authority of India (Ministry of Road Transport & Highways Government of India)
Authority Engineer : Theme Engineering Service Pvt. Ltd
EPC Contractor : PNC Infratech Limited
Total Length of Project : 31.745 Kms.
Contract Price (INR) : 1062,00,00,000.00
PERIOD : 23 March.-2021 To 25 April-2021
STAGE PAYMENT STATEMENT NO. - 7
Quantities as per Scope Quantities as per Certified Work Amount as per Certified Work Done
Certified
Sl No. Item Description Unit BOQ Amount Certified Certified Certified Upto Remarks
Quantity Rate Upto This bill This bill
(In Rs.) Upto date Upto date Previous
Previous
1. Road Super
works- including
Structure: Culverts, widening
On completion and
of the repair of
super-structure in all
respects including wearing coat, bearings, expansion joints,
A2/2
hand rails, crash barriers, road signs & markings, tests on
completion etc. complete in all respects
MNB 3x10 - 01 Nos - BHS Nos. 4 69,03,795 2,76,15,180 1.00 1.00 - 69,03,795 69,03,795 -
MNB 2x7.5 - 03 Nos - BHS Nos. 10 41,42,277 4,14,22,770 6.00 6.00 - 2,48,53,662 2,48,53,662 -
MNB 1x20 - 02 Nos - BHS Nos. 6 61,36,707 3,68,20,240 - - - - - -
MNB 2x10 - 01 Nos - BHS Nos. 4 46,02,530 1,84,10,120 - - - - - -
MNB 1x12 - 01 Nos - BHS Nos. 4 27,61,518 1,10,46,072 - - - - - -
MNB 1x10 - 02 Nos - BHS Nos. 6 30,68,353 1,84,10,120 - - - - - -
Approaches: On completion of approaches including Retaining
A2/3 walls, stone pitching, protection works complete in all respect
and fit for use.
MNB 3x10 - 01 Nos - BHS Nos. 4 27,61,518 1,10,46,072 - - - -
MNB 2x7.5 - 03 Nos - BHS Nos. 6 27,61,518 1,65,69,108 - - - -
MNB 1x20 - 02 Nos - BHS Nos. 2 73,64,048 1,47,28,096 - - - -
MNB 2x10 - 01 Nos - BHS Nos. 2 36,82,024 73,64,048 - - - -
MNB 1x12 - 01 Nos - BHS Nos. 2 22,09,214 44,18,429 - - - -
MNB 1x10 - 02 Nos - BHS Nos. 4 18,41,012 73,64,048 - - - -
Construction of NH-56, 4-lane bypass connecting NH-56 at Km 17+400 and terminating near Behta Village Road (bypass Chainage from Km 0.000 to Km
Project :
32.000/31.489 Average length 31.745 Km) in the State of Uttar Pradesh (Lucknow) under NHDP Phase -VII “on EPC Mode.
Client : National Highway Authority of India (Ministry of Road Transport & Highways Government of India)
Authority Engineer : Theme Engineering Service Pvt. Ltd
EPC Contractor : PNC Infratech Limited
Total Length of Project : 31.745 Kms.
Contract Price (INR) : 1062,00,00,000.00
PERIOD : 23 March.-2021 To 25 April-2021
STAGE PAYMENT STATEMENT NO. - 7
Quantities as per Scope Quantities as per Certified Work Amount as per Certified Work Done
Certified
Sl No. Item Description Unit BOQ Amount Certified Certified Certified Upto Remarks
Quantity Rate Upto This bill This bill
(In Rs.) Upto date Upto date Previous
Previous
1. Road B-2
works
Newincluding Culverts,
Underpasses/ widening and repair of
Overpasses
Foundation + Sub-Structure: On completion of the foundation
B2/1 work including foundations for wing and return walls,
abutments, piers upto the abutment/pier cap.
PUP - 1 x 12 - 1 Nos - BHS Nos. 4 19,76,458 79,05,831 4.00 4.00 - 79,05,831 79,05,831 -
VUP - 1 x 12 - 4 Nos - BHS Nos. 16 19,76,458 3,16,23,326 12.00 8.00 4.00 2,37,17,494 1,58,11,663 79,05,831
VUP - 1 x 20 - 4 Nos - BHS Nos. 20 26,35,277 5,27,05,543 14.00 13.00 1.00 3,68,93,880 3,42,58,603 26,35,277
Super - Structure: On completion of the Super-Structure in all
respects including wearing coat, bearings, expansion joints,
B2/2 hand rails, crash barriers, road signs & markings, tests on
completion etc. complete in all respect (90% Payment on
completion of Deck Slab).
PUP - 1 x 12 - 1 Nos - BHS Nos. 2 26,35,277 52,70,554 2.00 1.00 1.00 52,70,554 26,35,277 26,35,277
VUP - 1 x 12 - 4 Nos - BHS Nos. 8 26,35,277 2,10,82,217 3.00 3.00 - 79,05,831 79,05,831 -
VUP - 1 x 20 - 4 Nos - BHS Nos. 8 43,92,129 3,51,37,029 2.00 1.00 1.00 87,84,257 43,92,129 43,92,129
Approaches: On completion of approaches including Retaining
walls / Reinforced Earth walls, stone pitching, protection works
B2/3
complete in all respect on either end of the structure and fit for
use.
PUP - 1 x 12 - 1 Nos - BHS Nos. 4 6,58,819 26,35,277 - - - - - -
VUP - 1 x 12 - 4 Nos - BHS Nos. 10 10,54,111 1,05,41,109 - - - - - -
VUP - 1 x 20 - 4 Nos - BHS Nos. 10 17,56,851 1,75,68,514 - - - - - -
Construction of NH-56, 4-lane bypass connecting NH-56 at Km 17+400 and terminating near Behta Village Road (bypass Chainage from Km 0.000 to Km
Project :
32.000/31.489 Average length 31.745 Km) in the State of Uttar Pradesh (Lucknow) under NHDP Phase -VII “on EPC Mode.
Client : National Highway Authority of India (Ministry of Road Transport & Highways Government of India)
Authority Engineer : Theme Engineering Service Pvt. Ltd
EPC Contractor : PNC Infratech Limited
Total Length of Project : 31.745 Kms.
Contract Price (INR) : 1062,00,00,000.00
PERIOD : 23 March.-2021 To 25 April-2021
STAGE PAYMENT STATEMENT NO. - 7
Quantities as per Scope Quantities as per Certified Work Amount as per Certified Work Done
Certified
Sl No. Item Description Unit BOQ Amount Certified Certified Certified Upto Remarks
Quantity Rate Upto This bill This bill
(In Rs.) Upto date Upto date Previous
Previous
1. Major
3. Road works
Bridgeincluding
(length >Culverts, widening
60 m) works and repair
and ROB/ of
RUB/elevated sections/ flyovers including viaduct
A.2 – New Major Bridges
A2/1 Foundations
MJB (2x40+2x45) - LHS Nos. 4 79,06,590 3,16,26,360 2.00 1.00 1.00 1,58,13,180 79,06,590 79,06,590
A2/2 Sub-structure - - - -
MJB (2x40+2x45) - LHS Nos. 4 79,06,590 3,16,26,360 1.00 - 1.00 79,06,590 - 79,06,590
A2/3 Super-structure (including bearings) - - - -
MJB (2x40+2x45) - LHS Nos. 3 1,05,42,120 3,16,26,360 - - - - - -
A2/4 Wearing Coat including expansion joints - - - -
MJB (2x40+2x45) - LHS RM 170 93,019 1,58,13,180 - - - - - -
Miscellaneous items like hand rails, crash barriers, road
A2/5 - - - -
markings etc.
MJB (2x40+2x45) - LHS RM 170 93,019 1,58,13,180 - - - - - -
Approaches (including Retaining walls, stone pitching and
A2/6 - - - -
protection works)
MJB (2x40+2x45) - LHS Nos. 2 1,58,13,180 3,16,26,360 - - - - - -
B.2 – New ROB -
B2/1 Foundation :- -
ROB (1x37.28+1x64.01+1x37.28) - 01 Nos - BHS Nos. 8 1,47,63,727 11,81,09,816 4.00 4.00 - 5,90,54,908 5,90,54,908 -
ROB (1X37.28+1X37.28+1X 37.28) - 01 Nos - BHS Nos. 8 1,19,15,820 9,53,26,563 4.00 4.00 - 4,76,63,281 4,76,63,281 -
ROB (1X31.28+1x31.28+1x58.08) - 01 Nos - BHS Nos. 8 1,28,53,403 10,28,27,222 2.00 - 2.00 2,57,06,805 - 2,57,06,805
B2/2 Sub-Structure : - -
ROB (1x37.28+1x64.01+1x37.28) - 01 Nos - BHS Nos. 8 73,81,863 5,90,54,908 4.00 4.00 - 2,95,27,454 2,95,27,454 -
ROB (1X37.28+1X37.28+1X 37.28) - 01 Nos - BHS Nos. 8 59,57,910 4,76,63,281 4.00 4.00 - 2,38,31,641 2,38,31,641 -
ROB (1X31.28+1x31.28+1x58.08) - 01 Nos - BHS Nos. 8 64,26,701 5,14,13,611 - - - - - -
B2/3 Super-structure : - -
ROB (1x37.28+1x64.01+1x37.28) - 01 Nos - BHS Nos. 6 1,96,84,969 11,81,09,816 - - - - - -
ROB (1X37.28+1X37.28+1X 37.28) - 01 Nos - BHS Nos. 6 1,58,87,760 9,53,26,563 - - - - - -
ROB (1X31.28+1x31.28+1x58.08) - 01 Nos - BHS Nos. 6 1,71,37,870 10,28,27,222 - - - - - -
B2/4 Wearing Coat : - -
ROB (1x37.28+1x64.01+1x37.28) - 01 Nos - BHS RM 277.14 1,70,470 4,72,43,926 - - - -
ROB (1X37.28+1X37.28+1X 37.28) - 01 Nos - BHS RM 223.68 1,70,470 3,81,30,625 - - - -
ROB (1X31.28+1x31.28+1x58.08) - 01 Nos - BHS RM 241.28 1,70,470 4,11,30,889 - - - -
Construction of NH-56, 4-lane bypass connecting NH-56 at Km 17+400 and terminating near Behta Village Road (bypass Chainage from Km 0.000 to Km
Project :
32.000/31.489 Average length 31.745 Km) in the State of Uttar Pradesh (Lucknow) under NHDP Phase -VII “on EPC Mode.
Client : National Highway Authority of India (Ministry of Road Transport & Highways Government of India)
Authority Engineer : Theme Engineering Service Pvt. Ltd
EPC Contractor : PNC Infratech Limited
Total Length of Project : 31.745 Kms.
Contract Price (INR) : 1062,00,00,000.00
PERIOD : 23 March.-2021 To 25 April-2021
STAGE PAYMENT STATEMENT NO. - 7
Quantities as per Scope Quantities as per Certified Work Amount as per Certified Work Done
Certified
Sl No. Item Description Unit BOQ Amount Certified Certified Certified Upto Remarks
Quantity Rate Upto This bill This bill
(In Rs.) Upto date Upto date Previous
Previous
1.B2/5
Road Miscellaneous
works including Culverts,
items :- widening and repair of -
ROB (1x37.28+1x64.01+1x37.28) - 01 Nos - BHS RM 277.14 42,617 1,18,10,982 - - - -
ROB (1X37.28+1X37.28+1X 37.28) - 01 Nos - BHS RM 223.68 42,617 95,32,656 - - - -
ROB (1X31.28+1x31.28+1x58.08) - 01 Nos - BHS RM 241.28 42,617 1,02,82,722 - - - -
B2/6 Approaches : - -
ROB (1x37.28+1x64.01+1x37.28) - 01 Nos - BHS Nos. 4 2,06,69,218 8,26,76,871 - - - -
ROB (1X37.28+1X37.28+1X 37.28) - 01 Nos - BHS Nos. 2 3,33,64,297 6,67,28,594 - - - -
ROB (1X31.28+1x31.28+1x58.08) - 01 Nos - BHS Nos. 2 3,59,89,528 7,19,79,055 - - - -

C.2 – New Elevated Section/ Flyovers/Grade Separators


C2/1 Foundation : -
FLY (6x35+1x40+1x45) - LHS Nos. 9 1,23,81,262 11,14,31,358 5.00 4.00 1.00 6,19,06,310 4,95,25,048 1,23,81,262
FLY (1x32+2x35+1x45) - RHS Nos. 5 1,11,05,362 5,55,26,812 3.00 3.00 - 3,33,16,087 3,33,16,087 -
FLY (3x27.70) - LHS Nos. 4 78,47,412 3,13,89,647 - - - - - -
FLY (4x27.7) - RHS Nos. 5 83,70,573 4,18,52,863 - - - - - -
FLY (1x35) - BHS Nos. 4 66,10,335 2,64,41,339 4.00 4.00 - 2,64,41,339 2,64,41,339 -
FLY (2x50+2x35) - BHS Nos. 10 1,28,42,936 12,84,29,362 10.00 10.00 - 12,84,29,362 12,84,29,362 -
FLY (3x35) - BHS Nos. 8 99,15,502 7,93,24,018 2.00 2.00 - 1,98,31,004 1,98,31,004 -
C2/2 Sub-structure : - -
FLY (6x35+1x40+1x45) - LHS Nos. 9 82,54,175 7,42,87,572 4.00 3.00 1.00 3,30,16,699 2,47,62,524 82,54,175
FLY (1x32+2x35+1x45) - RHS Nos. 5 74,03,575 3,70,17,875 3.00 2.00 1.00 2,22,10,725 1,48,07,150 74,03,575
FLY (3x27.70) - LHS Nos. 4 52,31,608 2,09,26,431 - - - - - -
FLY (4x27.7) - RHS Nos. 5 55,80,382 2,79,01,908 - - - - - -
FLY (1x35) - BHS Nos. 4 44,06,890 1,76,27,560 4.00 4.00 - 1,76,27,560 1,76,27,560 -
FLY (2x50+2x35) - BHS Nos. 10 85,61,957 8,56,19,575 10.00 10.00 - 8,56,19,575 8,56,19,575 -
FLY (3x35) - BHS Nos. 8 66,10,335 5,28,82,679 2.00 2.00 - 1,32,20,670 1,32,20,670 -
C2/3 Super-structure :- -
FLY (6x35+1x40+1x45) - LHS Nos. 8 1,39,28,920 11,14,31,358 - - - - - -
FLY (1x32+2x35+1x45) - RHS Nos. 4 1,38,81,703 5,55,26,812 - - - - -
FLY (3x27.70) - LHS Nos. 3 1,04,63,216 3,13,89,647 - - - - -
FLY (4x27.7) - RHS Nos. 4 1,04,63,216 4,18,52,863 - - - - -
FLY (1x35) - BHS Nos. 2 1,32,20,670 2,64,41,339 - - - - -
FLY (2x50+2x35) - BHS Nos. 8 1,60,53,670 12,84,29,362 - - - - -
FLY (3x35) - BHS Nos. 6 1,32,20,670 7,93,24,018 - - - - -
Construction of NH-56, 4-lane bypass connecting NH-56 at Km 17+400 and terminating near Behta Village Road (bypass Chainage from Km 0.000 to Km
Project :
32.000/31.489 Average length 31.745 Km) in the State of Uttar Pradesh (Lucknow) under NHDP Phase -VII “on EPC Mode.
Client : National Highway Authority of India (Ministry of Road Transport & Highways Government of India)
Authority Engineer : Theme Engineering Service Pvt. Ltd
EPC Contractor : PNC Infratech Limited
Total Length of Project : 31.745 Kms.
Contract Price (INR) : 1062,00,00,000.00
PERIOD : 23 March.-2021 To 25 April-2021
STAGE PAYMENT STATEMENT NO. - 7
Quantities as per Scope Quantities as per Certified Work Amount as per Certified Work Done
Certified
Sl No. Item Description Unit BOQ Amount Certified Certified Certified Upto Remarks
Quantity Rate Upto This bill This bill
(In Rs.) Upto date Upto date Previous
Previous
1.C2/4
Road Wearing
works including
Coat :- Culverts, widening and repair of -
FLY (6x35+1x40+1x45) - LHS RM 295 1,00,729 2,97,15,029 - - - -
FLY (1x32+2x35+1x45) - RHS RM 147 1,00,729 1,48,07,150 - - - -
FLY (3x27.70) - LHS RM 83.1 1,00,729 83,70,573 - - - -
FLY (4x27.7) - RHS RM 110.8 1,00,729 1,11,60,763 - - - -
FLY (1x35) - BHS RM 70 1,00,729 70,51,024 - - - -
FLY (2x50+2x35) - BHS RM 340 1,00,729 3,42,47,830 - - - -
FLY (3x35) - BHS RM 210 1,00,729 2,11,53,071 - - - -
C2/5 Miscellaneous items :- -
FLY (6x35+1x40+1x45) - LHS RM 295 1,00,729 2,97,15,029 - - - -
FLY (1x32+2x35+1x45) - RHS RM 147 1,00,729 1,48,07,150 - - - -
FLY (3x27.70) - LHS RM 83.1 1,00,729 83,70,573 - - - -
FLY (4x27.7) - RHS RM 110.8 1,00,729 1,11,60,763 - - - -
FLY (1x35) - BHS RM 70 1,00,729 70,51,024 - - - -
FLY (2x50+2x35) - BHS RM 340 1,00,729 3,42,47,830 - - - -
FLY (3x35) - BHS RM 210 1,00,729 2,11,53,071 - - - -
C2/6 Approaches :- -
FLY (6x35+1x40+1x45) - LHS Nos. 1 7,42,87,572 7,42,87,572 - - - -
FLY (1x32+2x35+1x45) - RHS Nos. 1 3,70,17,875 3,70,17,875 - - - -
FLY (3x27.70) - LHS Nos. 1 2,09,26,431 2,09,26,431 - - - -
FLY (4x27.7) - RHS Nos. 1 2,79,01,908 2,79,01,908 - - - -
FLY (1x35) - BHS Nos. 4 44,06,890 1,76,27,560 - - - -
FLY (2x50+2x35) - BHS Nos. 2 4,28,09,787 8,56,19,575 - - - -
FLY (3x35) - BHS Nos. 2 2,64,41,339 5,28,82,679 - - - -
4. Other works
1 Road side drains KM 58.77 1,00,56,932 59,10,45,905 - - - -
2 Road signs, markings, km stones, safety devices KM 63.64 1,30,06,630 82,77,41,916 - - - -
3 Project facilities -
3.1 Bus Bays Nos. 10 89,88,895 8,98,88,954 - - - -
3.2 Truck lay-byes Nos. 1 93,70,663 93,70,663 - - - -
3.3 Others Nos. 1 20,26,83,974 20,26,83,974 - - - -
4 Road side plantation KM 63.64 24,541 15,61,777 - - - -
5 Safety and traffic management during construction Month 36 3,61,523 1,30,14,810 6.00 6.00 - 21,69,135 21,69,135 -
Total Amount (In Rs.) > > > 10,62,00,00,002 1,61,11,73,610 1,28,26,50,463 32,85,23,147
Construction of NH-56, 4-lane bypass connecting NH-56 at Km 17+400 and terminating near Behta Village Road (bypass Chainage from Km 0.000 to Km
Project :
32.000/31.489 Average length 31.745 Km) in the State of Uttar Pradesh (Lucknow) under NHDP Phase -VII “on EPC Mode.
Client : National Highway Authority of India (Ministry of Road Transport & Highways Government of India)
Authority Engineer : Theme Engineering Service Pvt. Ltd
EPC Contractor : PNC Infratech Limited
Total Length of Project : 31.745 Kms.
Contract Price (INR) : 1062,00,00,000.00
PERIOD : 23 March.-2021 To 25 April-2021
STAGE PAYMENT STATEMENT NO. - 7
Quantities as per Scope Quantities as per Certified Work Amount as per Certified Work Done
Certified
Sl No. Item Description Unit BOQ Amount Certified Certified Certified Upto Remarks
Quantity Rate Upto This bill This bill
(In Rs.) Upto date Upto date Previous
Previous
1. Road works including Culverts, widening and repair of
ABSTRACT
1 Earthwork, Granular and Other Work 4,85,42,49,391 57,40,31,976 39,46,01,002 17,94,30,974
2 Bituminous Work 1,93,81,66,461 5,79,19,770 2,59,62,112 3,19,57,659
3 Cement Pavement
4 Culverts, MNB & Other Structure 66,49,48,150 32,80,98,673 28,05,23,157 4,75,75,517
5 Major Bridge and Structures 3,16,26,36,000 65,11,23,190 58,15,64,193 6,95,58,997
Total 10,62,00,00,002 1,61,11,73,610 1,28,26,50,463 32,85,23,147

Submitted by: Checked by: Recommended by Approved by:

Authorized Signatory Quantity Surveyor Resident Engineer Team Leader

M/S PNC Infratech Limited M/s. Theme Engineering Service Pvt. Ltd M/s. Theme Engineering Service Pvt. Ltd M/s. Theme Engineering Service Pvt. Ltd