Glendale Task Record
Glendale Task Record
Condominium Association
March 2021
Tasks Completed
1. Replace/repair/cleaned all internal/external building lights fixtures and bulbs where needed
(Evan &Carl)
1
2. Replace smoke detectors and extinguishers where needed
4. Scheduled tree removal service for fallen tree in parking lot (Carl)
2
5. Replaced attic exhaust fan cover on roof (Bobby)
7. Cleaned/polished/painted all brass fixtures, door numbers, and door signs at front
entrance
4
8. Bleached and Oxyclean scrubbed front entrance awning twice (each summer)
5
6
7
10. Pressure washed wood spindle fences on left and right sides of front of building
8
11. Pressure washed driveway from street down to dumpster
13. Pressure Washed outside of wood fences on left and right of back of building
9
14. Pressure Washed back stairwell
10
11
15. Cleaned/repotted/painted (black) concrete platers at front entrance (formally covered in
mold and growing out weeds
16. Trimmed all trees, shrubs and bushes around property and maintained throughout all
seasons
17. Mowed, raked, edged all front and side lawns and grass areas for all season (18 months)
up until second half of summer 2020
12
18. Placed boulder rocks as corner of property next to neighboring drive to prevent vehicle
erosion
21. Installed gutter/drain directors to front and rear of building near entry doors
13
22. Built up make shift rain runoff trench on side of parking lot (needs further attention)
14
23. Reclaimed several feet of drive and parking lot due to years of leaf and foliage build up
preventing drainage of water in parking lot
15
16
24. Spot spray painted back exterior stairwell where paint had rubbed off or rust was forming
17
25. Raked and blew front entryway, driveway and parking lot all seasons
26. Cut back and removed vines and overgrowth along back and side perimeters and two of
the four large overhanging trees
18
27. Cleared and cut back overgrowth along building and around A/C units and water meters
28. Hung new plants at either side of entryway. would replace with new ones after they would
die in cold seasons or when someone stole them
19
20
29. Installed welcome sign at front entrance
30. Custom ordered and hung directions sign at front entrance for visitors and deliveries
21
Items for Discussion
1. Remove trees in the back behind property which my be deemed hazardous to the building. Remove
ivy from trees in the meantime
22
2. Add directional drainage piping for A/C units that purge water into the driveway
23
6. Pour proper concrete drainage trench on side of parking lot from neighboring parking lot
9. Install opaque window film on lower fall of front entry door glass (limit visibility of package from the
street)
24
10. Regular full-service groundskeeping in all* seasons- mowing, weeding, edging, raking, blowing,
trimming
11. Recycling
25
12. Grass treatment- grass is patchy, full of lava rocks, hard soil, full of weeds
26
14. Sun bay windows replacement assessment
27
28
15. Condition of cars in the parking lot
29
16. Seasonally scheduled gutter cleaning and repair
30
31