TO,
MIT- WPU
S No. 124, Paud Road, Kothrud
Pune 411038
Sub: - Quotation for waterproofing treatment to Basement, Superstructure & Terrace at MIT College, Kothrud,Pune.
Dear sir
Thanking you very much for inviting us to quote for above said job. We now take pleasure in submitting
the quotation for the same.
providing and injection non shrink cementitious grout by mixing The above work done
– 1 pouch (200 gms.) of “SIKA INTRAPLAST N200” of M/s. SIKA shall be guaranteed
and 50 kgs of cement and sufficient water for flow ability, No 750 410 307500 for good performance
Grouting the same under pressure (140 PSI PRESSURE PUMP) in for a period of 05
pre-drilled holes by grouting pump etc. complete. years.
1 Surface preparation throughout, open the crack " v " shape &
use the polymer pest in crack & fill the polymer mortar in crack,
pond test on slab 48 hours, if any leakage found, socket fixing
& grouting the same 140 PSI as our requirement, Provinding &
Applying 2 coats of SikaTop Seal 107 hi or Equivalent, Sika top The above work done
seal 107 hi is a liquid applied, crack bridging 2 pack acrylic shall be guaranteed
polymer modified cementitious waterproofing coating system, Sqm 1150.00 485.00 557750.00 for good performance
conforms to: IS 101, IS 2645, ASTM D 2370, EN 1348, Mixing for a period of 05
ratio of Sika Top Seal 1:5 by weight, consumption 3 kg/ M2. years.
Etc complete,
Modes of Measurements:
Modes of Measurements in all cases shall be as per the actual area treated, measured & paid for the same.
1) Our rates are inclusive of the cost of material Waterproofing chemicals , labour, tools &
2) plants.
Water and . electricity required for the work as well as for our workmen shall be supplied to
3) us free for
Space at site.
storage of materials and built-in premises for our tools, plants etc. shall be
4) provided
Space fortostayus, of
free
ouratworkers
site. shall be provided to main contractor ( It is in your scope ) us
5) free at site. required for the work shall be provided by you, free of cost to us at site.
Scaffolding
6) Hoist for lifting the material required for our work shall be provided to us free at site.
7) GST 18% shall be charge extra on total value.
8) 10% of the value of the contract shall be paid to us as mobilisation advance alongwith the
9) work Bills
R.A. orderwill
andbethe same shall
submitted be recovered
periodically at same
and the the same
shallpercentage
be paid to from our 2andperiod
us within R.A. of 7
10) Bills. of
days
Final submission ofshall
measurements our bill.
be taken jointly within 15 days of each item of completion and the
final bill shall be paid to us within 15 days of submission of our bill.
11) 50% of the item rates shall be paid to us as secured advance against delivery of
waterproofing chemicals at site and on submission of our invoice etc. at site within 7 days.
12) Thistrust
We amountyou shall
shall be
findadjusted
our offerfrom our R.A.and
reasonable Bill,award
as perthe
consumption.
work to us. We assure you
timely completion and satisfactory performance all throughout.
Yours faithfully,