IBC Project Materials Monitoring

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 17

Project Name:

Location:
Project I.D.:

Activity Center Qty Unit

Embankment 9418.97 cu m

Aggregate Sub-base Course 4201.17 cu m


Aggregate base Course 1448.37 cu m

PCCP 8547.50 sq m

Structural Concrete Class "A" 19.14 bags


cu m
cu m

RCPC Collar

RCPC 610mm dia 14.00 pcs


RCPC 1070mm dia 16.00 pcs

Stone Masonry 2490.80 cu m


Sidewalk 220.00 lm

Concrete Curb and Gutter 220.00 lm

Metal Guardrail including Post 1469.12 lm

Metal Beam End Piece 20.00 each

Reflectorized Thermoplastic Pavement Markings 490.25 sq m

Chevron signs
Construction of Concrete Road, Roxas City Circumferential Road Section 2
Capiz
18GD0033

Materials Description Budget Qty Qty Requested Variance Unit

Common Fill 9418.97 cu m


Special Fill

Aggregate Sub-base Course 4201.17 cu m


Aggregate base Course 1448.37 cu m

Cement 3819.00 T-bags


Sand 5128.50 cu m
Gravel 8547.50 cu m
Curing Compund 213.69 drum
Asphalt Sealant 8.55 kgs
RSB 32mm Plain Round Bar 45.00 pcs
RSB 16mm x 6m 212.50
RSB 16mm x 6m (Spikes) 9.30
Trapal(Tarpaulin)Blue 2.00 pcs
Trapal(Sackoline)Blue 2.00 pcs

Formworks

Cement 229.68 bags


Sand 11.48 cu m
Gravel 19.14 cu m
Formworks

Cement
Sand

RCPC 610mm dia 14.00 pcs


RCPC 1070mm dia 16.00 pcs

Cement 9963.20 bags


Washed Sand 996.32 cu m
Boulders 2490.80 cu m
PVC Pipe 3"
Cement 2200.00 bags
Washed Sand 110.00 cu m
Gravel 220.00 cu m

Cement 2200.00 bags


Washed Sand 110.00 cu m
Gravel 220.00 cu m

Cement 264.60 bags


Washed Sand 17.64 cu m
Gravel 29.40 cu m
Metal Guardrail 489.71 pcs
Bolt 5/8" x 6" Bolt w/ nut and washer 490.00 pcs
Bolt 5/8" x 1" Bolt w/ nut and washer 1960.00 pcs
RSB 10mm x 6m 490.00 pcs
RSB 12mm x 6m 327.00 pcs
Plywood 3/8 x 4 x 8 48.00 pcs
Coco Lumber 2 x 2 x 8 21.00 pcs
Coco Lumber 2 x 2 x 10 55.00 pcs
CWN 3" 80.00 kgs
CWN 2" 108.00 kgs
G.I Tie Wire No 16 109.32 kgs
Used Oil 100.00 lit
Paint Brush 3" 4.00 pcs

Metal Beam End Piece 20.00 each

Thermoplastic Powder White 245.13 bags


Glass Beads (White) 490.25 bags
Adform Primer(16lit/can) 4.90 cans
LPG 50kgs refill 98.05 tanks
LPG 11kgs refill 98.05 tanks

Chevron
Project Name: Construction of Concrete Road, Roxas City Circumferential Road Section 2
Location: Capiz
Project I.D.: 18GD0033
Metal Guardrail including post
a. Concrete
Length Width height Qty Set Volume Unit
0.2 0.2 1.5 1 490 29.4 cu m

29.4 cu m

b. Rebars
Mark Bar Dia Unit Wt Cut Length Qty Set Tota Qty

Vertical bars 12mm dia 0.888 1.4 4 490 1960


Ties 10mm dia 0.616 0.5 8 490 3920

Cuttinglist:
Bar dia. Length Qty
Length/Cut Length
12mm dia x 6 4.29
@ 4 pcs 1.40
1 pcs 0.40

10mm dia x 6 12.00


@ 12 pcs 0.50
1 pcs 0.00

Summary order:
490 pcs 12mm dia x 6 0.888
327.00 pcs 10mm dia x 6 0.616

Total Wt=

c. Forms (Precast)
1 Plywood
Mark Length Width Qty Set Area Unit
Bottom 2.4 3 1 1 7.2 sq m
End Forms 0.6 2.4 1 1 1.44 sq m
8.64 sq m

Area of 3 Plywood
1.2 2.4 3 1 8.64 sq m

Mark Length Width Qty Set Area Unit


Side Forms 1.5 0.2 12 2 0.6 sq m

Area of 1 Plywood
1.2 2.4 1 1 2.88 sq m

2 Coco lumber 2 x 2
End Forms
Mark Length Qty Set Total Qty
Horizontal 2.4 2 2 4 pcs
Vertical 0.1 5 2 10 pcs

Side Forms
Mark Length Qty Set Total Qty
Horizontal 1.5 2 24 48 pcs
Vertical 0.1 3 24 72 pcs

Brace
Mark Length Qty Set Total Qty
Top brace 2.4 3 1 3 pcs
Spike brace 0.6 20 1 20 pcs

Summary:
2" x 2" x 8' - 21 pcs
2" x 2" x 10' - 55 pcs

RCPC Collar
Length Width Thickness Qty Set
2.26 0.1 0.05
Wt Unit

2436.67 kgs
1207.36 kgs

3644.03 kgs

Order Waste
Total Qty/Cut length Qty Length(m) Wt(kgs) Remarks
490.00
m @ 490.00 196.00 69.62 waste on cutting
m 0.00 0.00 0.00 waste upon purchase
69.62 Total

326.67 Length(m) Wt(kgs)


m @ 326.00 0.00 0.00 waste on cutting
m 0.67 4.00 1.64 waste upon purchase
1.64 Total

2610.72 kgs
1208.592 kgs

3819.312 kgs 4.59% wastage


order 2" x 2" x 8ft
order 2" x 2" x 8ft

order 2" x 2" x 10ft


order 2" x 2" x 8ft

order 2" x 2" x 10ft


order 2" x 2" x 10ft
Project Name: Construction of Concrete Road, Roxas City Circum
Location: Capiz
Project I.D.: 18GD0033
Subject: Schedule for fabrication of Concrete Post

Item Description Day 1st 2nd 3rd


I. Fab. Of Concrete Post Qty 36 30 36

Plywood 12
Coco Lumber 2 x 2 x 8 21
Coco Lumber 2 x 2 x 10 55
CWN 3" 20
CWN 2" 27
Used Oil
Paint Brush

24
rete Road, Roxas City Circumferential Road Section 2

tion of Concrete Post

4th 5th 6th 7th 8th 9th 10th 11th 12th 13th
30 36 30 36 30 36 30 36 30 36

12 12 12
21 21 21
55 55 55
20 20 20
27 27 27
14th 15th Total
30 28 490 pcs

48 sht
84 pcs 224.00 bd ft
220 pcs 733.33 bd ft
80 kgs 957.33 bd ft
108 kgs 47.87 kgs