General Notes

1. Do not scale drawings. Dimensions govern.


2. All dimensions are in millimetres unless noted otherwise.
3. All levels are in metres unless noted otherwise.
4. All dimensions shall be verified on site before proceeding with the work.
5. Foster + Partners shall be notified in writing of any discrepancies.
6. Any areas indicated on this sheet are approximate and indicative only.

Foster + Partners Architectural drawings and models are coordinated with


the following Engineering models:

Studio I Structural Revit Model


1500101-SIE-367911217-ZZ-23-33213114-000001.rvt dated 30th July 2020
1500101-SIE-367911217-Z1-36-33213114-000001.rvt dated 30th July 2020
Studio I Electrical Revit Model
1500101-SIE-367911217-ZZ-23-33213121-000001.rvt dated 21st July 2020
1500101-SIE-367911217-Z1-36-33213121-000001.rvt dated 16th July 2020
Studio I Mechanical Revit Model
1500101-SIE-367911217-ZZ-23-33213117-000001.rvt dated 21st July 2020
1500101-SIE-367911217-ZZ-36-33213117-000001.rvt dated 09th July 2020

1 2 3 4 5 6 7
16800 16800 16800 16800 16800 16800

+94.270 +94.150 +94.150 +94.270


Top of Roof Level
+93.255 +93.255
94.270
+92.150
5470

9400
8450 8400
AT-Roof Level
88.800

5380

5330
3000
3000
12700 MEP 23500 MEP
3600

Board 11800
Board Room
FFL +85.200 Room 3950 4400 3950 1800 FFL +85.200 1850 FFL +85.200
AT-Level 01 Mezzanine
85.200

8490
8415

8400

8400
12800 13250 4800

7030
5400

Control
Access
UHNWI Central

5000

5000
4620

4600

4600

4600

4600
4405

4405

4400
Wellness
VIP Drop off / Landside Courtyard

2715

2715
Arts Lounge F&B F&B Lounge
FFL +79.600 Pick up FFL +79.700 FFL +79.750 FFL +79.800Concourse FFL +79.800 FFL +79.800 Oasis FFL +79.800 FFL +79.800 750
FFL +79.800
AT-Level 00

2025
79.800
6000 4855
5800 5745
4500

Stormwater/

3750
3625
TX Room

3625
Fire Holding Combined LV Room Staff / Service Access
Tank Mechanical FFL +75.300 FFL +75.150 FFL +75.050
AT-Lower Ground Level
Pump Room
75.300

C03 16/02/2021 VE Design Package JB /


ISW
C02 12/08/2020 100% SD Submission JB /

1 Passenger Terminal Building, Section 01 ISW


1 : 200 C01 12/05/2020 100% CD Submission JB /
ISW
Rev. Date Reason For Issue Chk

Key Plan.

Makkah

A B C D E F G
16800 16800 16800 16800 16800 16800

+94.270 +94.150 +94.150 +94.270


Top of Roof Level
+93.255 +93.255
94.270
+92.150
5470

8400
AT-Roof Level
13100
88.800
5380

5380
8800

3000
MEP
3000

MEP 23500
3600

3000

Offices FFL +85.200 16380 1850 FFL +85.200


AT-Level 01 1850 3560 3560
85.200
8400

21850 18560 17000

7100
VHNWI/HNWI Departure Central
VHNWI/HNWI CIP Drop off /
5400

Departure Departure
4600

4600
Pick up

4470
Security Courtyard

3200
Concourse Concourse
2720

Control Oasis
AT-Level 00 Airfield Apron FFL +79.750 (Airside) FFL +79.800 FFL +79.800 FFL +79.800 (Landside) FFL +79.750 FFL +79.700

79.800
4500

LANDSIDE
AIRSIDE

AT-Lower Ground Level


75.300

2 Passenger Terminal Building, Section 02 Riverside, 22 Hester Road


London SW11 4AN
1 : 200 T +44(0)20 7738 0455
F +44(0)20 7738 1107
www.fosterandpartners.com © Foster + Partners 2019

Client

Amaala Company
Project address
Kingdom Center, 58th Floor
Riyadh - Kingdom of Saudi Arabia

Project

Amaala Terminal Building and


Control Tower

Title

Passenger Terminal Building


General Arrangement Sections
Section 01 - 02

Project No Sheet First Issue Date Scale at ISO A0

2954 12/05/2020 1 : 200


Sheet Number Revision
1500101-FOP-36-71911219-ZZ-ZZ-33211100 -005001
C03
General Notes
1. Do not scale drawings. Dimensions govern.
2. All dimensions are in millimetres unless noted otherwise.
3. All levels are in metres unless noted otherwise.
4. All dimensions shall be verified on site before proceeding with the work.
5. Foster + Partners shall be notified in writing of any discrepancies.
6. Any areas indicated on this sheet are approximate and indicative only.

Foster + Partners Architectural drawings and models are coordinated with


the following Engineering models:

Studio I Structural Revit Model


1500101-SIE-367911217-ZZ-23-33213114-000001.rvt dated 30th July 2020
1500101-SIE-367911217-Z1-36-33213114-000001.rvt dated 30th July 2020
Studio I Electrical Revit Model
1500101-SIE-367911217-ZZ-23-33213121-000001.rvt dated 21st July 2020
1500101-SIE-367911217-Z1-36-33213121-000001.rvt dated 16th July 2020
Studio I Mechanical Revit Model
1500101-SIE-367911217-ZZ-23-33213117-000001.rvt dated 21st July 2020
1500101-SIE-367911217-ZZ-36-33213117-000001.rvt dated 09th July 2020

1 16800
2 16800
3 16800
4 16800
5 16800
6 16800
7

+94.270 +94.150 +94.150 +94.270


Top of Roof Level
+93.255 +93.255
94.270
+92.190 +92.150 +92.190
5470

+89.180
AT-Roof Level
88.800
3600

AT-Level 01
85.200
4800 12150 4800

7300
6750

6750
5400

5400

5400
CIP Landside Concourse CIP Landside Concourse

5000

5000
(Departures) (Arrivals)

2720

2720
FFL +79.750 FFL +79.800 FFL +79.800 FFL +79.800 FFL +79.750
AT-Level 00
79.800
4500

AT-Lower Ground Level


75.300

C03 16/02/2021 VE Design Package JB /

1 Passenger Terminal Building Section, Landside Concourse ISW


1 : 200 C02 12/08/2020 100% SD Submission JB /
ISW
C01 12/05/2020 100% CD Submission JB /
ISW
Rev. Date Reason For Issue Chk

Key Plan.

Makkah

7 6 5 4 3 2 1
16800 16800 16800 16800 16800 16800

+94.270 +94.150 +94.150 +94.270


Top of Roof Level
+93.255 +93.255
94.270
+92.190 +92.150 +92.190
5470

+89.180
AT-Roof Level
88.800
3600

AT-Level 01 72850
85.200
4600 12150 4600
7110
6890

6890
6200

6200
5400

5000

5000

5000
CIP Arrival Gate CIP Airside Concourse
CIP Airside Concourse
VIP Airside Concourse VIP Arrival Gate
(Arrivals)
2940

2940
(Departures)
FFL +79.750 FFL +79.800 FFL +79.800 FFL +79.750
AT-Level 00
79.800
4500

AT-Lower Ground Level


75.300

LANDSIDE
LANDSIDE

AIRSIDE
AIRSIDE

Riverside, 22 Hester Road


London SW11 4AN

2 Passenger Terminal Building Section, Airside Concourse


1 : 200
T +44(0)20 7738 0455
F +44(0)20 7738 1107
www.fosterandpartners.com © Foster + Partners 2019

Client

Amaala Company
Project address
Kingdom Center, 58th Floor
Riyadh - Kingdom of Saudi Arabia

Project

Amaala Terminal Building and


Control Tower

Title

Passenger Terminal Building


General Arrangement Sections
Section 03 - 04

Project No Sheet First Issue Date Scale at ISO A0

2954 12/05/2020 1 : 200


Sheet Number Revision
1500101-FOP-36-71911219-ZZ-ZZ-33211100 -005002
C03
General Notes
1. Do not scale drawings. Dimensions govern.
2. All dimensions are in millimetres unless noted otherwise.
3. All levels are in metres unless noted otherwise.
4. All dimensions shall be verified on site before proceeding with the work.
5. Foster + Partners shall be notified in writing of any discrepancies.
6. Any areas indicated on this sheet are approximate and indicative only.

Foster + Partners Architectural drawings and models are coordinated with


the following Engineering models:

Studio I Structural Revit Model


1500101-SIE-367911217-ZZ-23-33213114-000001.rvt dated 30th July 2020
1500101-SIE-367911217-Z1-36-33213114-000001.rvt dated 30th July 2020
Studio I Electrical Revit Model
1500101-SIE-367911217-ZZ-23-33213121-000001.rvt dated 21st July 2020
1500101-SIE-367911217-Z1-36-33213121-000001.rvt dated 16th July 2020
Studio I Mechanical Revit Model
1500101-SIE-367911217-ZZ-23-33213117-000001.rvt dated 21st July 2020
1500101-SIE-367911217-ZZ-36-33213117-000001.rvt dated 09th July 2020

A 16800 B 16800 C 16800 D 16800 E 16800 F 16800 G

+94.270 +94.150 +94.150 +94.270


Top of Roof Level
+93.255 +93.255
94.270
+92.150
5470

AT-Roof Level
8960
88.800 8935
8744 12061 3760 3760
12060 11761
3600

BOH

3000

3000

3000
Offices +85.200 BOH BOH +85.200
AT-Level 01

600
85.200

8415

8415

8415
10350Departure 5160 5650

7130
7030
Security VHNWI/HNWI CIP Drop off /
5400

Airport Apron UHNWI UHNWI UHNWI Cultural

4600

4600

4600

4600
Airside Check VIP Lounge Facilities Arts Lounge Facilities Lounge Departure Pick up

3502
2715
Concourse Concourse
+79.750 +79.800 +79.800 +79.800 +79.750
AT-Level 00 (Landside)
79.800
4500

LANDSIDE
AIRSIDE
AT-Lower Ground Level
75.300

1 Passenger Terminal Building Section, VIP Courtyards


1 : 200

C01 16/02/2021 VE Design Package JB /


ISW
Rev. Date Reason For Issue Chk

Key Plan.

Makkah

G 16800
F 16800
E 16800
D 16800
C 16800
B 16800
A

+94.270 +94.150 +94.150 +94.270


Top of Roof Level
+93.255 +93.255
94.270
+92.150 +91.735
+91.735
5470

AT-Roof Level
88.800
3900 3760 3760
12060 11160 12060 Staff 8744
3600

BOH
3000

3000

3000
MEP BOH Facilities
AT-Level 01
85.200

8490
8415

8415
5500 5610 10350
7130

7030
CIP Drop off / VHNWI/HNWI VHNWI/HNWI
5400

Departure Sports Wellness Arrival Airport Apron


4600

4600

4600
Pick up Concourse Lounge Lounge
Arrival Concourse
2715

(Landside) CIP Lounge FFL +79.800 Security (Landside) FFL +79.800


FFL +79.750 FFL +79.800 FFL +79.800 FFL +79.750
AT-Level 00 Check
79.800
4500

LANDSIDE
AIRSIDE
AT-Lower Ground Level
75.300

2 Passenger Terminal Building Section, CIP Courtyards


1 : 200
Riverside, 22 Hester Road
London SW11 4AN
T +44(0)20 7738 0455
F +44(0)20 7738 1107
www.fosterandpartners.com © Foster + Partners 2019

Client

Amaala Company
Project address
Kingdom Center, 58th Floor
Riyadh - Kingdom of Saudi Arabia

Project

Amaala Terminal Building and


Control Tower

Title

Passenger Terminal Building


General Arrangement Sections
Section 05-06

Project No Sheet First Issue Date Scale at ISO A0

2954 12/08/20 1 : 200


Sheet Number Revision
1500101-FOP-36-71911219-ZZ-ZZ-33211100 -005003
C01
General Notes
1. Do not scale drawings. Dimensions govern.
2. All dimensions are in millimetres unless noted otherwise.
3. All levels are in metres unless noted otherwise.
4. All dimensions shall be verified on site before proceeding with the work.
5. Foster + Partners shall be notified in writing of any discrepancies.
6. Any areas indicated on this sheet are approximate and indicative only.

Foster + Partners Architectural drawings and models are coordinated with


the following Engineering models:

Studio I Structural Revit Model


1500101-SIE-367911217-ZZ-23-33213114-000001.rvt dated 30th July 2020
1500101-SIE-367911217-Z1-36-33213114-000001.rvt dated 30th July 2020
Studio I Electrical Revit Model
1500101-SIE-367911217-ZZ-23-33213121-000001.rvt dated 21st July 2020
1500101-SIE-367911217-Z1-36-33213121-000001.rvt dated 16th July 2020
Studio I Mechanical Revit Model
1500101-SIE-367911217-ZZ-23-33213117-000001.rvt dated 21st July 2020
1500101-SIE-367911217-ZZ-36-33213117-000001.rvt dated 09th July 2020

7 6 5 4 3 2 1
16800 16800 16800 16800 16800 16800
+94.270 +94.150 +94.150 +94.270
Top of Roof Level
+93.255 +93.255
94.270
+92.150
5470

AT-Roof Level
88.800
3600

AT-Level 01
85.200
5400

FFL +79.750 FFL +79.750


AT-Level 00
79.800 14394 4813 14378 14394 4828 14378 14394 4813 14394
4500

CIP Arrival Gate CIP Departure Gate VIP Departure Gate

AT-Lower Ground Level


75.300

C03 16/02/2021 VE Design Package JB /

1 Passenger Terminal Building, North Elevation


ISW
1 : 200
C02 12/08/2020 100% SD Submission JB /
ISW
C01 12/05/2020 100% CD Submission JB /
ISW
Rev. Date Reason For Issue Chk

Key Plan.

Makkah

1 2 3 4 5 6 7
16800 16800 16800 16800 16800 16800

+94.270 +94.150 +94.159 +94.270


Top of Roof Level
+93.255 +93.255
94.270
+92.150
5470

AT-Roof Level
88.800
3600

AT-Level 01
85.200
5400

AT-Level 00
FFL +79.750 FFL +79.750

79.800 14394 4813 14394 14378 4828 14394 14378 4813 14394
4500

CIP Passengers Check-in Entrance CIP Drop-off Entrance CIP Arrivals Pick-up

AT-Lower Ground Level


75.300

2 Passenger Terminal Building, South Elevation


1 : 200
Riverside, 22 Hester Road
London SW11 4AN
T +44(0)20 7738 0455
F +44(0)20 7738 1107
www.fosterandpartners.com © Foster + Partners 2019

Client

Amaala Company
Project address
Kingdom Center, 58th Floor
Riyadh - Kingdom of Saudi Arabia

Project

Amaala Terminal Building and


Control Tower

Title

Passenger Terminal Building


General Arrangement Elevations
North and South Elevaion

Project No Sheet First Issue Date Scale at ISO A0

2954 12/05/2020 1 : 200


Sheet Number Revision
1500101-FOP-36-71911219-ZZ-ZZ-33211100 -006001
C03
General Notes
1. Do not scale drawings. Dimensions govern.
2. All dimensions are in millimetres unless noted otherwise.
3. All levels are in metres unless noted otherwise.
4. All dimensions shall be verified on site before proceeding with the work.
5. Foster + Partners shall be notified in writing of any discrepancies.
6. Any areas indicated on this sheet are approximate and indicative only.

Foster + Partners Architectural drawings and models are coordinated with


the following Engineering models:

Studio I Structural Revit Model


1500101-SIE-367911217-ZZ-23-33213114-000001.rvt dated 30th July 2020
1500101-SIE-367911217-Z1-36-33213114-000001.rvt dated 30th July 2020
Studio I Electrical Revit Model
1500101-SIE-367911217-ZZ-23-33213121-000001.rvt dated 21st July 2020
1500101-SIE-367911217-Z1-36-33213121-000001.rvt dated 16th July 2020
Studio I Mechanical Revit Model
1500101-SIE-367911217-ZZ-23-33213117-000001.rvt dated 21st July 2020
1500101-SIE-367911217-ZZ-36-33213117-000001.rvt dated 09th July 2020

G F E D C B A
16800 16800 16800 16800 16800 16800
+94.270 +94.150 +94.150 +94.270
Top of Roof Level
+93.255 +93.255
94.270
+92.150
5470

AT-Roof Level
88.800
3600

AT-Level 01
85.200
5400

CIP Drop off / Pick up Airfield Apron


AT-Level 00
FFL +79.750 FFL +79.750 FFL +79.750
14394 4813 28787 4813 28787 4828 14378
79.800
CIP Arrivals Gate
4500

CIP Concourse Emergency Exit

AT-Lower Ground Level FFL +75.150 FFL +75.100


Staff & Maintenance Access Road
75.300

LANDSIDE
AIRSIDE
C03 16/02/2021 VE Design Package JB /
ISW

1 Passenger Terminal Building, East Elevation


1 : 200
C02 12/08/2020 100% SD Submission

C01 12/05/2020 100% CD Submission


JB /
ISW
JB /
ISW
Rev. Date Reason For Issue Chk

Key Plan.

Makkah

A B C D E F G
16800 16800 16800 16800 16800 16800
+94.270 +94.147 +94.150 +94.270
Top of Roof Level
+93.255 +93.255
94.270
+92.150
5470

AT-Roof Level
88.800
3600

AT-Level 01
85.200
5400

Airfield Apron CIP Drop off / Pick up


AT-Level 00
FFL +79.750 FFL +79.750 FFL +79.750
14378 4828 28787 4813 28787 4813 14394
79.800
VIP Arrivals Gate CIP Concourse Emergency Exit
4500

VIP Drop off / Pick up


AT-Lower Ground Level
75.300
LANDSIDE
AIRSIDE

2 Passenger Terminal Building, West Elevation


1 : 200
Riverside, 22 Hester Road
London SW11 4AN
T +44(0)20 7738 0455
F +44(0)20 7738 1107
www.fosterandpartners.com © Foster + Partners 2019

Client

Amaala Company
Project address
Kingdom Center, 58th Floor
Riyadh - Kingdom of Saudi Arabia

Project

Amaala Terminal Building and


Control Tower

Title

Passenger Terminal Building


General Arrangement Elevations
East and West Elevation

Project No Sheet First Issue Date Scale at ISO A0

2954 12/05/2020 1 : 200


Sheet Number Revision
1500101-FOP-36-71911219-ZZ-ZZ-33211100 -006002
C03
General Notes
1. Do not scale drawings. Dimensions govern.
2. All dimensions are in millimetres unless noted otherwise.
3. All levels are in metres unless noted otherwise.
4. All dimensions shall be verified on site before proceeding with the work.
5. Foster + Partners shall be notified in writing of any discrepancies.
6. Any areas indicated on this sheet are approximate and indicative only.

Y 1 2 3 4 5 6 7 Z

Foster + Partners Architectural drawings and models are coordinated with


the following Engineering models:

Studio I Structural Revit Model


1500101-SIE-367911217-ZZ-23-33213114-000001.rvt dated 30th July 2020
16800 16800 16800 16800 16800 16800 1500101-SIE-367911217-Z1-36-33213114-000001.rvt dated 30th July 2020
Studio I Electrical Revit Model
1500101-SIE-367911217-ZZ-23-33213121-000001.rvt dated 21st July 2020
1500101-SIE-367911217-Z1-36-33213121-000001.rvt dated 16th July 2020
Studio I Mechanical Revit Model
1500101-SIE-367911217-ZZ-23-33213117-000001.rvt dated 21st July 2020
1500101-SIE-367911217-ZZ-36-33213117-000001.rvt dated 09th July 2020

Projection of Ha-Ha for Airside-


Landside Fence Design

16800

Projection of Ha-Ha for Airside-


Landside Fence Design

B
16800

Ha-ha for Airside-


24400 Lanside Fence

9500 Ha-ha

2000 2600 2100


5800
Waste Above
C C03 16/02/2021 VE Design Package JB /

4300
Disposal
17295 ISW

4600
8000
C02 12/08/2020 100% SD Submission JB /
FFL +75.300 FFL +75.150

2355
ISW

3400
6000 C01 12/05/2020 100% CD Submission JB /
Gen Room
ISW

3900
3495
19750
8045

9050
Rev. Date Reason For Issue Chk
16800

5845

3150
+74.700
4900

15100
Key Plan.

2000 1400 2000 1400 2000


23800

3400
33200

13950
1 Stormwater/ Combined LV Room TX Room
D

43900
________________
Fire Holding Mechanical Open to Sky

3400
42000
ZZ-ZZ-33211100
-005001 Tank Pump Room FFL +75.050

3150
5150
32100
3630 2095 6370

6050
4855

3400

2000 1750 2000


RMU
16800

3750
17250 Makkah

22250
FFL +75.300

3500
Corridor
N

4350
6350
+75.150

3100
+74.700 ? Chilled Security

6400
Water Pump

2000
Room

3000

4500
5800

3400
Corridor

24400
16800

F
16800

Riverside, 22 Hester Road


London SW11 4AN
T +44(0)20 7738 0455
F +44(0)20 7738 1107
www.fosterandpartners.com © Foster + Partners 2019

Client

Amaala Company
Project address
Kingdom Center, 58th Floor
Riyadh - Kingdom of Saudi Arabia

Project

Amaala Terminal Building and


Control Tower

Title

Passenger Terminal Building


Makkah General Arrangment Plans
Lower Ground Level

N Project No Sheet First Issue Date Scale at ISO A0

2954 12/05/2020 1 : 250


Sheet Number Revision
1500101-FOP-36-71911219-ZZ-B1-33211100 -003001
C03
General Notes
1. Do not scale drawings. Dimensions govern.
2. All dimensions are in millimetres unless noted otherwise.
3. All levels are in metres unless noted otherwise.
4. All dimensions shall be verified on site before proceeding with the work.
5. Foster + Partners shall be notified in writing of any discrepancies.
6. Any areas indicated on this sheet are approximate and indicative only.

Y 1 2 3 4 5 6 7 Z

Foster + Partners Architectural drawings and models are coordinated with


the following Engineering models:

16800 16800 16800 16800 16800 16800 Studio I Structural Revit Model
1500101-SIE-367911217-ZZ-23-33213114-000001.rvt dated 30th July 2020
1500101-SIE-367911217-Z1-36-33213114-000001.rvt dated 30th July 2020
Studio I Electrical Revit Model
1500101-SIE-367911217-ZZ-23-33213121-000001.rvt dated 21st July 2020
2 1500101-SIE-367911217-Z1-36-33213121-000001.rvt dated 16th July 2020
________________ Studio I Mechanical Revit Model
ZZ-ZZ-33211100
-006001 1500101-SIE-367911217-ZZ-23-33213117-000001.rvt dated 21st July 2020
1500101-SIE-367911217-ZZ-36-33213117-000001.rvt dated 09th July 2020

2
________________
ZZ-ZZ-33211100
+79.750
+79.800 -005001

100800

A UHNWI Departures VHNWI/HNWI Departures VHNWI/HNWI International Arrival

1
ZZ-GF-33211100
AIRSIDE
-009121
+79.800

Domestic Departures International Departures 1


16800

Seating Area VHNWI/HNWI VHNWI/HNWI Seating Area


Planter Seating Area Planter Seating Area ZZ-GF-33211100
UHNWI Departure Arrival -009051
Airside Concourse Concourse
2 Concourse (Airside) (Landside)
________________
ZZ-ZZ-33211100

Access

Access
Control

Control
-005002
72845 +79.800 +79.750
+79.800
E-Visa Kiosks
Emigration Desk
B UHNWI Arrivals
Immigration
Desk Search Search Immigration Police
Immigration
Desk
VHNWI/HNWI Domestic Arrival
Booth Booth WC (M) WC (F) Support Booth 1
WC (F) WC (M)
ZZ-GF-33211100
1 Departure -009041

9828

9828
ZZ-GF-33211100
E-Visa Kiosks Security Security Arrival Arrival E-Visa Kiosks
-009046
Check Check WC (F) WC (M)
Customs Customs
Check Check 1
16800

ZZ-GF-33211100
-008021
Security Security

0
LANDSIDE

19950

19900
Security Staff Prayer ELE Room Checkpoint Checkpoint 12700
Security
Checkpoint Room Checkpoint
1 Ablutions
ZZ-GF-33211100 6920 1
-009111 ZZ-GF-33211100
Prep -009041

12060
C VIP Lounge
Staff WC 9510 9510
Kitchen CIP Lounge C03 16/02/2021 VE Design Package JB /
ISW
Divestment 3620
Divestment 1 C02 12/08/2020 100% SD Submission JB /
Unaccompanied Booth Booth IT Room ZZ-GF-33211100
-009061 ISW
Minors'
ELE Room C01 12/05/2020 100% CD Submission JB /

2450
Room

26254
WC 11750 11750 4965
ISW
1 WC (M) 23500 WC (F)

30185
Rev. Date Reason For Issue Chk
16800

ZZ-GF-33211100
11450 11500
-009021
WC (M) WC (F)

11750
+79.750
+79.700 +79.800
12700 11750 1
ZZ-GF-33211100 Key Plan.
VIP Drop Off / -009071

2 1 Pick up UHNWI Arts Lounge Central


Wellness
1
100800

100800
Lounge

Access
Control
D
12060

18560

23500

18560

11140
________________ ________________ F&B F&B ________________
Landside Courtyard
ZZ-ZZ-33211100 ZZ-ZZ-33211100 ZZ-ZZ-33211100
-006002 -005001 Concourse Oasis -006002

1
ZZ-GF-33211100
-009101

11750
1
ZZ-GF-33211100
WC (F) WC (F) WC (M) -008031
16800

1
23500
ZZ-GF-33211100
-009031 VIP Lift and WC (M) Makkah
6081 11337 6082 Staff / Service Lift
Feature Stair
1
to Board Room Shoe Shoe ZZ-GF-33211100
Removal & Removal & -009081 N
1 Finishing Lockers Minors' Soft
ZZ-GF-33211100 Kitchen Lockers
Play Area
-009091
Cultural WC (F) WC (M)
E
11760

12000
Lounge Ablutions Ablutions Sports
Lounge 01
ZZ-GF-33211100
1

17000
-008011
ZZ-GF-33211100 Shower 16680
-008101
Luggage
Facilities (F) 12400 12650 Reclaim
Access UP Prayer Prayer Store

8550
Control Room (F) Room (M) 5
48
12
16800

Ele Room 2
48

1 BOH Medical 1
5

ZZ-GF-33211100 Shower Room


-008201 Facilities (M) Storage Tel Room Storage

77443

VHNWI/HNWI
Departure
Sculpture Display Sculpture Display
Concourse
F +79.800
Sculpture Display
(Landside)
Sculpture Display
+79.800 +79.750
+79.800
+79.750
+79.800
1
________________
ZZ-ZZ-33211100
-005002

+79.800
Check-in Seating Area Seating Area 1
16800

ZZ-GF-33211100
(Virtual Queue) -009011
Sculpture Display Sculpture Display

G
Entrance for Passengers Pre-Checked In CIP Arrivals Pick-up
Requiring Check-in Passenger Entrance
100800
+79.740

Riverside, 22 Hester Road


London SW11 4AN
CIP Drop-off / Pick-up T +44(0)20 7738 0455
F +44(0)20 7738 1107
www.fosterandpartners.com © Foster + Partners 2019

Client

Amaala Company
Project address
Kingdom Center, 58th Floor
Riyadh - Kingdom of Saudi Arabia
1
________________
ZZ-ZZ-33211100
-006001

Project

Amaala Terminal Building and


Control Tower

Title

Passenger Terminal Building


Makkah General Arrangment Plans
Ground Level

N Project No Sheet First Issue Date Scale at ISO A0

2954 12/05/2020 1 : 250


Sheet Number Revision
1500101-FOP-36-71911219-ZZ-GF-33211100 -003002
C03
General Notes
1. Do not scale drawings. Dimensions govern.
2. All dimensions are in millimetres unless noted otherwise.
3. All levels are in metres unless noted otherwise.
4. All dimensions shall be verified on site before proceeding with the work.
5. Foster + Partners shall be notified in writing of any discrepancies.
6. Any areas indicated on this sheet are approximate and indicative only.

Y 1 2 3 4 5 6 7 Z

Foster + Partners Architectural drawings and models are coordinated with


the following Engineering models:
16800 16800 16800 16800 16800 16800
Projection of Roof Tier 1 Projection of Roof Tier 1 Studio I Structural Revit Model
1500101-SIE-367911217-ZZ-23-33213114-000001.rvt dated 30th July 2020
1500101-SIE-367911217-Z1-36-33213114-000001.rvt dated 30th July 2020
Studio I Electrical Revit Model
1500101-SIE-367911217-ZZ-23-33213121-000001.rvt dated 21st July 2020
2 1500101-SIE-367911217-Z1-36-33213121-000001.rvt dated 16th July 2020
________________ Studio I Mechanical Revit Model
ZZ-ZZ-33211100
-006001 1500101-SIE-367911217-ZZ-23-33213117-000001.rvt dated 21st July 2020
1500101-SIE-367911217-ZZ-36-33213117-000001.rvt dated 09th July 2020

2
________________
ZZ-ZZ-33211100
-005001

A
100800
16800

Airside Concourse Below

2
________________ Tier 1 Roof Access via Tier 1 Roof Access via
ZZ-ZZ-33211100 Suspended Gantry in Suspended Gantry in
-005002
Ceiling Void Roof Skylights Above Roof Skylights Above Roof Skylights Above Ceiling Void
72845
B

33600
Staff WC (M)
50000
BOH
Staff

9828
Airport Operator Customs General Directorate Lobby

8744

8744
+85.200 Offices Facilities
Duty Manager Office Management Office of Passports
VIP Concourse Below Office
Server Rack 9650RSAF PTB GDP Special Office for +85.200 BOH
Storage Staff WC (F) 7937

3148
Storage

3061
Operations Room Operations Tourist Visa
16800

3543 & Storage


8990 Room 16402

13200 33650 1800

MEP

8400
1800 +85.200

12310
12560
Courtyard Below Courtyard Below

12910
C VIP WC
Main
Kitchen
C03 16/02/2021 VE Design Package JB /
ISW
GSM Elec C02 12/08/2020 100% SD Submission JB /
1 ISW
ZZ-01-33211100
Room Room 8400 13200
-009131
25600 C01 12/05/2020 100% CD Submission JB /
13

ISW
51

12800 CIP Concourse Below


3

Tier 2 Roof Access Ladder

30185
+85.200 Rev. Date Reason For Issue Chk

3760
16800

BOH

12800
8450
13200
Key Plan.
8400
Board Room 11946
Mezzanine Board
2 1 1

100800
13492

D
33600

12560

15680

25600

13260

12560
________________ ________________ Room Courtyard Below MEP Central Courtyard Below MEP Courtyard Below ________________
ZZ-ZZ-33211100 ZZ-ZZ-33211100 ZZ-ZZ-33211100
-006002 -005001 Feature Ceiling -006002

+83.700

1800 13200
Tier 3 Roof
Access Ladder
+85.200
16800

3760

3760
+85.200 +85.200
16786 BOH

1844

6520
Makkah
Board Room
13200 IT 6400
Lobby 5450
F&B BOH N
Storage 8400

E 11925
12560

12560
Courtyard Below Courtyard Below
1575 Stairs

17610
9200
BOH

13100
3975 MEP MEP 14800
23275
2
15

19
94

15
5

13900
16800

+85.200 +85.200
Elec Room
3900

BOH
18300

77443

Tier 1 Roof Access via Tier 1 Roof Access via


Suspended Gantry in Suspended Gantry in
Ceiling Void Ceiling Void
F
33600

1
________________
ZZ-ZZ-33211100
-005002

Landside Concourse Below


16800

100800

Riverside, 22 Hester Road


London SW11 4AN
T +44(0)20 7738 0455
F +44(0)20 7738 1107
www.fosterandpartners.com © Foster + Partners 2019

Client

Amaala Company
Project address
Kingdom Center, 58th Floor
Riyadh - Kingdom of Saudi Arabia
1
________________
ZZ-ZZ-33211100
-006001

Project
Projection of Roof Tier 1 Projection of Roof Tier 1
Amaala Terminal Building and
Control Tower

Title

Passenger Terminal Building


Makkah General Arrangment Plans
Level 01

N Project No Sheet First Issue Date Scale at ISO A0

2954 12/05/2020 1 : 250


Sheet Number Revision
1500101-FOP-36-71911219-ZZ-01-33211100 -003003
C03
General Notes
1. Do not scale drawings. Dimensions govern.
2. All dimensions are in millimetres unless noted otherwise.
3. All levels are in metres unless noted otherwise.
4. All dimensions shall be verified on site before proceeding with the work.
02 5. Foster + Partners shall be notified in writing of any discrepancies.
6. Any areas indicated on this sheet are approximate and indicative only.

01 03

EWS-451 EWS-451 Foster + Partners Architectural drawings and models are coordinated with the
following Engineering models:

2 Studio I Structural Revit Model


Z1-ZZ-33211100-005501 1500101-SIE-3671911217-ZZ-23-33213114-000001.rvt dated 30th July 2020
1500101-SIE-3671911217-Z1-36-33213114-000001.rvt dated 30th July 2020

40

16
19
Studio I Electrical Revit Model

50
1500101-SIE-3671911217-ZZ-23-33213121-000001.rvt dated 21st July 2020
1500101-SIE-3671911217-Z1-36-33213121-000001.rvt dated 16th July 2020
Studio I Mechanical Revit Model
1500101-SIE-3671911217-ZZ-23-33213117-000001.rvt dated 21st July 2020
1500101-SIE-3671911217-Z1-36-33213117-000001.rvt dated 9th July 2020

16
50
60
28
PLS-151

EWS-451 IWS-251
PT-153 EWS-451

Lift

08 IWS-151
04

IWS-151

PLS-151
EWS-451 EWS-451

19

40
90

19
IWS-151 Connection to Admin Building
IWS-251

21
90

60
28
EWS-751

C03 16/02/2021 VE Design Package JB /


ISW
C02 12/08/2020 100% SD Submission JB /
ISW
Admin Building at Base
C01 12/05/2020 100% CD Submission JB /
07 06 05 ISW
1 Rev. Date Reason For Issue Chk
Z1-ZZ-33211100-005501

Key Plan.

1 Control Tower, Level B1


1 : 50

02
01 03

EWS-451 EWS-451
2
Z1-ZZ-33211100-005501
40

16
19

50
20

15
16

16
00

50
60
28

1 IWS-151
Z1-ZZ-33211100-008410
9
025

15
14

00
IWS-251
06

EWS-451 EWS-451
12

PLS-151
4

11
84

57

Lift
PT-153

08 IWS-151
04
1
IWS-151 Z1-ZZ-33211100-009300
PLS-151

5
80
EWS-451 EWS-451

IWS-151
DRS-208
DRS-251
75
0

Riverside, 22 Hester Road


London SW11 4AN
19

40
65
90

19

T +44(0)20 7738 0455


0
14

IWS-251
F +44(0)20 7738 1107
0

DRS-251
AM-501 www.fosterandpartners.com © Foster + Partners 2019

Client

Amaala Company
21

Project address
90

AM-501
60

Kingdom Center, 58th Floor


28

EWS-451 Riyadh - Kingdom of Saudi Arabia

Project

Amaala Terminal Building and


Control Tower

Title
07 06 05
1
Control Tower
Z1-ZZ-33211100-005501
GA Plan
Lower Ground Level - Ground Level

N 2 Control Tower, Level 00


1 : 50 Project No

2954
Sheet First Issue Date

12/05/2020
Scale at ISO A0

1 : 50
Sheet Number Revision
1500101-FOP-36-71911219-Z1-ZZ-33211100-003501
C03
General Notes
1. Do not scale drawings. Dimensions govern.
2. All dimensions are in millimetres unless noted otherwise.
3. All levels are in metres unless noted otherwise.
4. All dimensions shall be verified on site before proceeding with the work.
5. Foster + Partners shall be notified in writing of any discrepancies.
6. Any areas indicated on this sheet are approximate and indicative only.

02 02 02
01 03 01 03 01 03

Foster + Partners Architectural drawings and models are coordinated with the
following Engineering models:

Studio I Structural Revit Model


1500101-SIE-3671911217-ZZ-23-33213114-000001.rvt dated 30th July 2020
1500101-SIE-3671911217-Z1-36-33213114-000001.rvt dated 30th July 2020
Studio I Electrical Revit Model
EWS-451
2 2 2 1500101-SIE-3671911217-ZZ-23-33213121-000001.rvt dated 21st July 2020
Z1-ZZ-33211100-005501 Z1-ZZ-33211100-005501 Z1-ZZ-33211100-005501 1500101-SIE-3671911217-Z1-36-33213121-000001.rvt dated 16th July 2020
EWS-451 EWS-451 Studio I Mechanical Revit Model
40

40

40
1500101-SIE-3671911217-ZZ-23-33213117-000001.rvt dated 21st July 2020

16

16

16
19

19

19
50

50

50
EWS-451 EWS-451
1500101-SIE-3671911217-Z1-36-33213117-000001.rvt dated 9th July 2020
EWS-152 EWS-152
EWS-152 EWS-152

16

16

16
15

50

50

50
00
EWS-152 EWS-152

10

10
DRS-251 Electrical Shaft
60

60

60
00

00
28

28

28
IWS-151 IWS-151

0
14
PLS-151 Electrical Shaft

22
EWS-152 Lift Emergency Access EWS-152

14

65

65
Electrical Shaft
IWS-151 AM-351 IWS-151

0
15
PT-153
25

00
PLS-151
13

45

45
IWS-151 Pressurisation Pressurisation

0
Lift Emergency Access
EWS-451 PLS-151 EWS-451 PLS-151

10

10
EWS-451 EWS-451

00

00
PLS-151
IWS-151
65

PLS-151 EWS-451 EWS-451


15

Electrical Shaft IWS-151 IWS-151


Lift 54 Lift Electrical Shaft 54
0 0
0
65

0
14

DRS-251
DRS-251 Lift MEP Pressurisation
00

Pressurisation
Maitenance
01

08 04 08 04 08 04
MEP
41

Maitenance Deck
11
57

PLS-151
CHW & FP CHW & FP
PT-153 Pipes Pipes
EWS-451 EWS-451
CHW & FP
Pipes

IWS-151 40 EWS-451 EWS-451


EWS-451 0 IWS-151
EWS-451
IWS-151 IWS-151

0
30

30
Void
0

Pressurisation Drainage Pressurisation Drainage Pressurisation Drainage


30

75

75
75

00

00
0

0
EWS-152 EWS-152
0

11

11
00
11

75

75
IWS-151
19

19

19
75

40

40

40
EWS-152 EWS-152
5

0
IWS-151 IWS-151 IWS-151
80
90

90

90
0

19

19

19
IWS-151
PLS-151 PLS-151 PLS-151

EWS-152 EWS-152
EWS-152 EWS-152
EWS-451 EWS-451
21

21

21
EWS-451 EWS-451
90

90

90
60

60

60
28

28

28
EWS-451

1 1 1
C03 16/02/2021 VE Design Package JB /
Z1-ZZ-33211100-005501 Z1-ZZ-33211100-005501 Z1-ZZ-33211100-005501 ISW
C02 12/08/2020 100% SD Submission JB /
ISW
C01 12/05/2020 100% CD Submission JB /
ISW
Rev. Date Reason For Issue Chk

07 1 Control Tower, Level 01


1 : 50 06 05 07 2 Control Tower, Level 02
1 : 50 06 05 07 3 Control Tower, Level 03
1 : 50 06 05
Key Plan.

02 02 02
01 03 01 03 01 03

2 2 2
Z1-ZZ-33211100-005501 Z1-ZZ-33211100-005501 Z1-ZZ-33211100-005501
40

40

40
EWS-152 EWS-152
EWS-152 EWS-152
16

16

16
19

19

19
EWS-152 EWS-152
50

50

50
AM-502
EWS-451 EWS-451
EWS-451 EWS-451
EWS-153 EWS-153
16

16

16
50

50

50
10

10

10
60

60

60
00

00

00
28

28

28
IWS-151 IWS-151 IWS-151
PLS-151 Electrical Shaft Electrical Shaft
Electrical Shaft
65

65

65
IWS-151 IWS-151 IWS-151
0

0
EWS-152 Lift Emergency Access EWS-152
PLS-151 AM-351 PLS-151
EWS-152 EWS-152 EWS-152 EWS-152
45

45

45
Pressurisation Pressurisation Pressurisation
0

0
PLS-151
10

10

10
00

00

00
PLS-151 PLS-151
IWS-151 IWS-151 Electrical Shaft IWS-151
Lift Electrical Shaft 54 Lift Electrical Shaft 54 Lift 54
0 0 0
EWS-451 EWS-451
EWS-451 EWS-451
DRS-251
EWS-153 EWS-153

08 04 08 04 08 AM-502 AM-502
04
EWS-153 EWS-153
EWS-451 EWS-451 EWS-451 EWS-451
PLS-151
CHW & FP CHW & FP CHW & FP
Pipes Pipes Pipes

IWS-151 IWS-151 IWS-151

MEP
0

0
30

30

30
Drainage Void EWS-152 Drainage Maitenance Deck EWS-152 Drainage
Pressurisation Pressurisation EWS-152 Pressurisation EWS-152
EWS-152 EWS-152
75

75

75
00

00

00
0

0
11

11

11
IWS-151
75

75

75
IWS-151
19

19

19
40

40

40
0

0
IWS-151 IWS-151 IWS-151 IWS-151
90

90

90
19

19

19
PLS-151 PLS-151
Riverside, 22 Hester Road
London SW11 4AN
EWS-153 EWS-153
EWS-451 EWS-451
EWS-451 EWS-451 T +44(0)20 7738 0455
AM-502 F +44(0)20 7738 1107
EWS-152 EWS-451
EWS-152 EWS-152 www.fosterandpartners.com © Foster + Partners 2019
21

21

21
EWS-152 EWS-152
90

90

90
60

60

60
Client
28

28

28
Amaala Company
Project address
Kingdom Center, 58th Floor
Riyadh - Kingdom of Saudi Arabia
1 1 1
Z1-ZZ-33211100-005501 Z1-ZZ-33211100-005501 Z1-ZZ-33211100-005501

Project

Amaala Terminal Building and


Control Tower
07 4 Control Tower, Level 04
1 : 50 06 05 07 5 Control Tower, Level 05
1 : 50 06 05 07 6 Control Tower, Level 06
1 : 50 06 05
Title

Control Tower
GA Plan
Landing Level 01 - 06

N Project No Sheet First Issue Date Scale at ISO A0

2954 12/05/2020 1 : 50
Sheet Number Revision
1500101-FOP-36-71911219-Z1-ZZ-33211100-003502
C03
General Notes
1. Do not scale drawings. Dimensions govern.
2. All dimensions are in millimetres unless noted otherwise.
3. All levels are in metres unless noted otherwise.
4. All dimensions shall be verified on site before proceeding with the work.
5. Foster + Partners shall be notified in writing of any discrepancies.
6. Any areas indicated on this sheet are approximate and indicative only.

Foster + Partners Architectural drawings and models are coordinated with the
following Engineering models:

Studio I Structural Revit Model


1500101-SIE-3671911217-ZZ-23-33213114-000001.rvt dated 30th July 2020
1500101-SIE-3671911217-Z1-36-33213114-000001.rvt dated 30th July 2020
Studio I Electrical Revit Model
1500101-SIE-3671911217-ZZ-23-33213121-000001.rvt dated 21st July 2020
1500101-SIE-3671911217-Z1-36-33213121-000001.rvt dated 16th July 2020
Studio I Mechanical Revit Model
1500101-SIE-3671911217-ZZ-23-33213117-000001.rvt dated 21st July 2020
1500101-SIE-3671911217-Z1-36-33213117-000001.rvt dated 9th July 2020

07 05
EL +45.075 EL +45.075

CT Setout Plan 5
123.763

CT Roof CT Roof
121.995 121.995

4700
Visual Control Room Visual Control Room

30.00
°
CT VCR Cab CT VCR Cab
117.295 117.295

2720
2120
6
CT VCR Mid-Landing Z1-ZZ-33211100-008410 CT VCR Mid-Landing
114.575 114.575 Sub- Sub-
Equipment Equipment
Sub- Sub-

2380
Equipment Equipment

CT Sub-Equipment 2 CT Sub-Equipment 2
112.195 112.195
C03 16/02/2021 VE Design Package JB /
Sub- ISW
Equipment
C02 12/08/2020 100% SD Submission JB /
ISW

3675
Sub- CRAC
Equipment Unit Workstation Workstation C01 12/05/2020 100% CD Submission JB /
ISW
CT Sub-Equipment 1 CT Sub-Equipment 1 Rev. Date Reason For Issue Chk
108.520 108.520
Workstation
Key Plan.

3675
Toilet

CT Amenity CT Amenity
7
104.845 104.845
Z1-ZZ-33211100-008410

Toilet

3675
CT Shaft Landing 6 CT Shaft Landing 6
101.170 101.170

3675
Lift
Egress
CT Shaft Landing 5 CT Shaft Landing 5
97.495 97.495

3675
CT Shaft Landing 4 CT Shaft Landing 4
93.820 93.820

3675
Lift
Egress
CT Shaft Landing 3 CT Shaft Landing 3
90.145 90.145

3675
Riser

CT Shaft Landing 2 CT Shaft Landing 2


86.470 86.470
Riser

3675
Lift
Riser
Egress
CT Shaft Landing 1 CT Shaft Landing 1
82.795 82.795
Riverside, 22 Hester Road
London SW11 4AN
3675

T +44(0)20 7738 0455


Entrance F +44(0)20 7738 1107
Lobby www.fosterandpartners.com © Foster + Partners 2019

CT Level 00 CT Level 00 Client


79.120 79.120
Amaala Company
Project address
Kingdom Center, 58th Floor
Riyadh - Kingdom of Saudi Arabia
3675

Basement Basement
Project
75.445 75.445
Amaala Terminal Building and
Control Tower

2 Control Tower, Section 02


1 : 100 1 Control Tower, Section 01
1 : 100 Title

Control Tower
Overall Sections, Level All
Section 01 - 02

N Project No Sheet First Issue Date Scale at ISO A0

2954 12/05/2020 1 : 100


Sheet Number Revision
1500101-FOP-36-71911219-Z1-ZZ-33211100-005501
C03
General Notes
1. Do not scale drawings. Dimensions govern.
2. All dimensions are in millimetres unless noted otherwise.
3. All levels are in metres unless noted otherwise.
4. All dimensions shall be verified on site before proceeding with the work.
5. Foster + Partners shall be notified in writing of any discrepancies.
6. Any areas indicated on this sheet are approximate and indicative only.

Foster + Partners Architectural drawings and models are coordinated with the
following Engineering models:

Studio I Structural Revit Model


1500101-SIE-3671911217-ZZ-23-33213114-000001.rvt dated 30th July 2020
1500101-SIE-3671911217-Z1-36-33213114-000001.rvt dated 30th July 2020
Studio I Electrical Revit Model
1500101-SIE-3671911217-ZZ-23-33213121-000001.rvt dated 21st July 2020
1500101-SIE-3671911217-Z1-36-33213121-000001.rvt dated 16th July 2020
Studio I Mechanical Revit Model
1500101-SIE-3671911217-ZZ-23-33213117-000001.rvt dated 21st July 2020
1500101-SIE-3671911217-Z1-36-33213117-000001.rvt dated 9th July 2020

06
02 06
02 08
04 08
04
+128.295 +128.295 +128.295 +128.295

Roof Level +124.875 Roof Level +124.875 Roof Level +124.875 Roof Level +124.875

Roof Level +123.765 Roof Level +123.765 Roof Level +123.765 Roof Level +123.765 Roof Level +123.765 Roof Level +123.765 Roof Level +123.765 Roof Level +123.765

CT Roof CT Roof CT Roof CT Roof


121.995 121.995 121.995 121.995

CT VCR Cab CT VCR Cab CT VCR Cab CT VCR Cab


117.295 117.295 117.295 117.295

CT VCR Mid-Landing CT VCR Mid-Landing CT VCR Mid-Landing CT VCR Mid-Landing


114.575 114.575 114.575 114.575

CT Sub-Equipment 2 CT Sub-Equipment 2 CT Sub-Equipment 2 CT Sub-Equipment 2


112.195 112.195 112.195 112.195

C03 16/02/2021 VE Design Package JB /


ISW
C02 12/08/2020 100% SD Submission JB /
ISW
CT Sub-Equipment 1 CT Sub-Equipment 1 CT Sub-Equipment 1 CT Sub-Equipment 1
C01 12/05/2020 100% CD Submission JB /
108.520 108.520 108.520 108.520 ISW
Rev. Date Reason For Issue Chk

Key Plan.
CT Amenity CT Amenity CT Amenity CT Amenity
104.845 104.845 104.845 104.845

CT Shaft Landing 6 CT Shaft Landing 6 CT Shaft Landing 6 CT Shaft Landing 6


101.170 101.170 101.170 101.170

CT Shaft Landing 5 CT Shaft Landing 5 CT Shaft Landing 5 CT Shaft Landing 5


97.495 97.495 97.495 97.495

CT Shaft Landing 4 CT Shaft Landing 4 CT Shaft Landing 4 CT Shaft Landing 4


93.820 93.820 93.820 93.820

CT Shaft Landing 3 CT Shaft Landing 3 CT Shaft Landing 3 CT Shaft Landing 3


90.145 90.145 90.145 90.145

CT Shaft Landing 2 CT Shaft Landing 2 CT Shaft Landing 2 CT Shaft Landing 2


86.470 86.470 86.470 86.470

CT Runway Threshold CT Runway Threshold CT Runway Threshold CT Runway Threshold


84.600 84.600 84.600 84.600

CT Shaft Landing 1 CT Shaft Landing 1 CT Shaft Landing 1 CT Shaft Landing 1


82.795 82.795 82.795 82.795

Riverside, 22 Hester Road


London SW11 4AN
T +44(0)20 7738 0455
CT Level 00 CT Level 00 CT Level 00 CT Level 00
F +44(0)20 7738 1107
79.120 79.120 79.120 79.120 www.fosterandpartners.com © Foster + Partners 2019

Client

Amaala Company
Project address
Kingdom Center, 58th Floor
Riyadh - Kingdom of Saudi Arabia
Basement Basement Basement
75.445 75.445 75.445

Project

Amaala Terminal Building and


Control Tower
1 Control Tower, South Elevation
1 : 100 2 Control Tower, North Elevation
1 : 100 3 Control Tower, East Elevation
1 : 100 4 Control Tower, West Elevation
1 : 100

Title

Control Tower
Overall Elevation, Level All

N Project No Sheet First Issue Date Scale at ISO A0

2954 12/05/2020 1 : 100


Sheet Number Revision
1500101-FOP-36-71911219-Z1-ZZ-33211100-006501
C03