DESIGN OF ABUTMENT

(WITH WATER IN TROUGH)

DATA :
ABUTMENT LENGTH : 8.900 m 744 756
TROUGH BED LEVEL : 264.801 m
BOX DEPTH (INTERNAL) : 2.400 m
BOX WIDTH (INTERNAL) : 3.100 m
BOX TOP MEMBER THICKNESS : 0.000 m
BOX BOTTOM MEMBER THICKNESS : 0.300 m
BOX sealing coat THICKNESS : 0.075 m
PEDESTAL+BEARING THICKNESS : 0.150 m
W12 R2 R1
SLAB BOTTOM LEVEL : 264.726 m
BED BLOCK BOTTOM LEVEL : 263.976 m W7 W8 +264.276
+263.976
TOP OF FOUDATION : 261.100 m W1
FOUNDATION (1st step) DEPTH : 0.000 m
FOUNDATION (2nd step) DEPTH : 0.600 m
BOT. OF FOUNDATION(1st step) : 261.100 m
BOT. OF FOUNDATION(2nd step) : 260.500 m W6
BED BLOCK THICKNESS : 0.300 m 3.626
TOP WIDTH : 0.756 m W11A W11 W4 W3
DWARF WALL WIDTH : 0.744 m W5 W2
REAR BATTER : 0.600 m 0 600 600 0 +261.100
FRONT BATTER : 0.600 m 0.000 A W13
BOTTOM WIDTH : 2.700 m 600 1st step +261.100
LIVE LOAD SURCHARGE : 3.340 m
0.600 W14 2nd step +260.500
2700
B
1st OFFSET ON EITHER SIDE : 0.000 m 3900
2nd OFFSET ON EITHER SIDE : 0.600 m

R1= At base of pier:(from pier design calculations)


( 0.000 + ( 288.00 / 2 ) )/ 8.900 ) = 16.18 t

R2= (trough rests on soil)


At base of pier:(from pier design calculations)
232.33 x( 0.600 + 0.756 ) = 3.54 t 0
10.00 x 8.90

R1= At base of Footing:(from pier design calculations)


( 0.000 + ( 288.00 / 2 ) )/ 8.900 ) = 16.18 t

R2= (trough rests on soil)


At base of Footing:(from pier design calculations)
288.00 x( 0.600 + 0.600 + 0.756 ) = 6.33 t 0
10.00 x 8.90

UNIT WT. OF CONC. : 2.400


UNIT WT. OF SOIL : 2.100
UNIT WT. OF WATER : 1.000

HOR. COEFFT. OF SOIL : 0.1584 ( considering O value as 28o )


VER. COEFFT. OF SOIL : 0.0395
STRESS IN CONCRETE : Taking Moments of all forces about 'A'

FORCE PARTICULARS MAG. L.A. MOMENT


TONS. MTS TON.MT.

R1 AS CALCULATED ABOVE 16.18 1.722 27.862

R2 AS CALCULATED ABOVE 0.00 0.678 0.000

W1 0.756 * 0.300 * 2.500 0.567 1.722 0.976

W2 0.500 * 0.600 * 2.876 * 2.400 2.071 2.300 4.763

W3 0.756 * 2.876 * 2.400 5.218 1.722 8.986

W4 0.744 * 3.176 * 2.400 5.671 0.972 5.512

W5 0.500 * 0.600 * 2.876 * 2.400 2.071 0.400 0.828

W6 0.500 * 0.600 * 2.876 * 2.100 1.812 0.200 0.362

W7 0.600 * 0.750 * 2.100 0.945 0.300 0.284

W12 0.600 * 3.340 * 1.000 2.004 0.300 0.601

PV 0.0395 * 3.626 * 3.626 * 2.100 1.091 - -

37.629

PH 0.1584 * 3.626 * 3.626 * 2.100 4.374 1.450 6.343

Braking Force 20/100 * 43.200 0.971 3.176 3.083


8.900

5.344 59.601

LEVER ARM = 1.584 mts.


ECCENTRICITY = 0.234 mts.
ALLOWABLE LIMIT = 0.450 mts. NO TENSION

MAX. STRESS = 21.181 t/sq.mt.


MIN. STRESS = 6.693 t/sq.mt.
STRESS ON SOIL : Taking Moments of all forces about 'B'

FORCE PARTICULARS MAG. L.A. MOMENT


TONS. MTS TON.MT.

R1 AS CALCULATED ABOVE 16.18 2.322 37.569

R2 AS CALCULATED ABOVE 0.00 1.278 0.000

W1 As already calculated 0.567 2.322 1.317

W2 As already calculated 2.071 2.900 6.005

W3 As already calculated 5.218 2.322 12.117

W4 As already calculated 5.671 1.572 8.915

W5 As already calculated 2.071 1.000 2.071

W6 As already calculated 1.812 0.800 1.450

W7 As already calculated 0.945 0.900 0.851

W11A 0.600 * 3.626 * 2.100 4.569 0.300 1.371

W12 1.344 * 3.340 * 1.000 4.489 0.672 3.017

W14 3.900 * 0.600 * 2.400 5.616 1.950 10.951

PV 0.0395 * 4.226 * 4.226 * 2.100 1.481 - -

50.690 85.632

PH 0.1584 * 4.226 * 4.226 * 2.100 5.941 1.690 10.042

Braking Force 20/100 * 43.200 0.971 3.776 3.666


8.900
6.911 99.340

LEVER ARM = 1.960 mts.


ECCENTRICITY = 0.010 mts.
ALLOWABLE LIMIT = 0.650 mts. NO TENSION

MAX. STRESS = 13.193 t/sq.mt.


MIN. STRESS = 12.802 t/sq.mt.

FACTOR OF SAFETY
OVER_T 6.247 > 2
SLIDING 3.667 > 1.5