Commissioning Report

Marine Genset &


Auxiliary Engines
D5 - D16 series

Engine type: ............................................................

Engine serial no.: ....................................................

Yard name: ...............................................................

Yard no.: ...................................................................

Genset no. (e.g. 1 of 3): .......................................

IMO no.: ...................................................................

Flagstate: .................................................................

Classification: .........................................................

Other certificate: ....................................................


Date of Commissioning:
........... ............ ..........
Year Month Day
Commissioning Report

Contents
A. General information ................................................................................. 3
B. Engine installation information ................................................................ 5
C. Installation Check-Up ............................................................................... 6
D. Before Starting Checklist .......................................................................... 8
E. Test record ............................................................................................... 9

2
2013-7
Commissioning Report

A. General information

Shipyard / Installer
Name: Yard no.:

Address: Representative:

Zip code: Telephone no.:

City: Fax no.:

State / E-mail address:


Province:
Country:

Volvo Penta Dealer / Importer


Name: Contact person:

Address: Mobile phone no.:

Zip code: Telephone no.:

City: Fax no.:

State / E-mail address:


Province:
Country:

End user / Owner


Name: Ship’s name:

Address: Owner’s repre-


sentative:
Zip code: Mobile phone no.:

City: Telephone no.:

State / Fax no.:


Province:
Country: E-mail address:

3
2013-7
Commissioning Report

Diesel engine
Make: Volvo Penta
Type:
Serial no.:
□ Normal genset □ Emergency genset □ Combined genset
□ Other, please describe:

Flexible coupling (if different than standard)


Make:
Type:
Rubber hardness:
Supplied by:

Generator / Other Consumer


Make:
Serial no.:
Apparant power (kVa):
□ Single bearing □ Double bearing
□ Other, please describe:

Other, please describe:

4
2013-7
Commissioning Report

B. Engine installation information

Engine location
• Engine installed on tank top □ Yes □ No
• Installed on floor over main engine in engine room □ Yes □ No
• Installed outside engine room □ Yes □ No
• Extra strength plates / longitudinal under the frame □ Yes □ No

Accessibility
• Possibility to change filter □ Yes □ No
• Service access to crank case cover □ Yes □ No
• Possibility to change oil in the pan □ Yes □ No
• Service access sideways □ Yes □ No
• Service access up / down □ Yes □ No
• Service access front / rear □ Yes □ No
• Service area according to GA-drawings □ Yes □ No

Engine support
• Steel plate (welding plate) under the flexible □ Yes □ No
engine mountings

• Flexible mountings fitted □ Yes □ No


• Volvo Penta standard flexible mountings □ Yes □ No
If not, type: ....................................................................................

Flexible mounting height, between frame (A) and floor (B)


1 2
Start

Generator
Engine

End of loop
1 5 Unit:
2 6 mm inch
3 7
P0010625 4 8

2013-7 5
Commissioning Report

C. Installation Check-Up

Air ventilation system


• Sufficient ventilation around the installation □ Yes □ No
• Non-blocked air inlets / -outlets on installation □ Yes □ No
• Any risk of re-circulated cooling air □ Yes □ No
• Correct air supply for combustion on engine □ Yes □ No
• Ambient temperature (outside) ....................................................................................

Air ventilation system for radiator cooling


• Correct dimensions on air ducts to / from the radiator, □ Yes □ No
please refer to Commissioning Guidelines &
Report page 12.

If no, specify dimensions: Inlet ........................ Outlet ........................


• Any flow restrictions due to filter grids or water protec- □ Yes □ No
tions

Exhaust system
• Exhaust system has been calculated regarding back- □ Yes □ No
pressure

If yes, by whom? ....................................................................................


• Exhaust pipe outlet has rain protection □ Yes □ No
• Exhaust compensator is fitted □ Yes □ No
• Exhaust compensator is correctly aligned □ Yes □ No

Fuel system
• Fuel system according to recommendations □ Yes □ No
• Fuel pre-filters are fitted □ Yes □ No
• Flexible fuel hoses are fitted □ Yes □ No
• Pipe dimensions: Supply Ø ............ mm / in Return Ø ............ mm / in
• Type of fuel. Quality: ....................................................................................

Fresh water cooling system


• System has the correct amount and mixture of cooling □ Yes □ No
liquid additives.
NOTICE! Volvo Penta Coolant VCS (yellow) is recom-
mended. If the customer uses a different brand it will be
on the customer’s responsibility, due to warranty cover-
age.

• Coolant type □ VP Coolant VCS □ Other


If other, what type? ....................................................................................
• Flexible hoses are fitted □ Yes □ No
• Sea water temperature during test: ....................................................................................

2013-7 6
Commissioning Report

Crankcase ventilation system


• Installation is according to the information in Commis- □ Yes □ No
sioning Guidelines & Report page 8.

If no, closed crankcase ventilation? □ Yes □ No

Torsional vibration calculation (TVC)


• Any non standard Volvo Penta deliver of PTO or similar □ Yes □ No
equipment connected to engine or generator?
• If not standard genset, has TVC been performed? □ Yes □ No
If yes, by whom? ....................................................................................
(A copy is to be attached)
Remarks: ....................................................................................
....................................................................................
• TVC OK according to engine data? □ Yes □ No

Generator
• Power cables according to generator manufacturer □ Yes □ No

2013-7 7
Commissioning Report

D. Before Starting Checklist

1 If electric starters are used, make sure the polarity of the voltage supply is correct. □

2 Before turning on the power to the engine connector box, make sure the polarity is correct. □

3 Only D5/D7: □
Disconnect all connections except the “six cable” connection on the rpm control.
The following cables must remain connected: rpm, actuator and power supply.

4 Check the oil level in the sump. □

5 Check the water level in the engine. □

6 Check the fuel delivery to the engine. □

7 Clean the exhaust pipe near the turbo from metallic welding ashes. □

8 Disconnect the air hose near the starter / regulator and blow all welding remains and dirt □
out by using starting air.

CAUTION!
Risk of eye injury. Eye protection required.
NOTICE! The high pressure can cause great reaction forces on the hose. Take actions to
avoid personal injury.

9 Check that there is no dirt or welding remains in the air inlets. □

10 Open the top cover of the generator and check the cable connections. Check that there □
are no objects present which can cause a short circuit. The generator must be free from
metallic dust.

11 The phase cables must not be run through the side plates one by one. □
The reason is that the magnetic field in the cables will heat the steel plate. If a non-magnetic
plate is used close to the cable, it is ok to run the cables one by one. Running all phase
cables through a steel plate and through one hole only is ok, because the three fields will
eliminate each other.

12 Ask for a confirmation from the shipyard that the other ends of the cables (main switch- □
board) are connected correctly.

Yard / responsible signature: ............................................................................................

13 Verify all safety shutdowns and emergency steps. □

14 If required by classification surveyor, check that all remaining alarms give correct informa- □
tion.

2013-7 8
Commissioning Report

E. Test record

1. Alarm and shutdown protection test record

Setting Test Setting Test


Item Test name Item Test name
value value value value
Low oil pressure Over speed
1 5
alarm shutdown
Low oil pressure Fuel leakage
2 6
shutdown alarm
High coolant Cold
3 7
temp. alarm insulation
High coolant Hot insulation
4 8
temp. shutdown

2. load test

Item Parameter 0% 25% 50% 75% 100% 110%


1 Oil pressure
2 Coolant temp.
3 Exhaust temp.
4 Exhaust back pressure
5 Oil temp.
6 Voltage U
7 Current I
8 Frequency Hz
9 Active power P
10 Power factor
Generator drive
*11 bearing
temp. support
1
Generator
*12 winding 2
temp.
3

3. Genset applying of load performance (carried out on request, not mandatory)

Transient Transient Steady


Steady Voltage Frequency
Applying voltage frequency state
state recovery recovery
of load dip/over dip/oversh frequency
voltage V time S time S
shoot % oot % Hz
0-50%

50-100%

100%-0

*If the generator is equipped with this item, make a note of this.

2013-7 9
Commissioning Report

Overall comments

.................................................................................................................................................................................
.................................................................................................................................................................................
.................................................................................................................................................................................
.................................................................................................................................................................................
.................................................................................................................................................................................

Volvo Penta representative remarks about installation

.................................................................................................................................................................................
.................................................................................................................................................................................
.................................................................................................................................................................................
.................................................................................................................................................................................

Classification surveyor remarks about installation

.................................................................................................................................................................................
.................................................................................................................................................................................
.................................................................................................................................................................................
.................................................................................................................................................................................
.................................................................................................................................................................................

Modifications to be carried out before handing over the vessel

.................................................................................................................................................................................
.................................................................................................................................................................................
.................................................................................................................................................................................
.................................................................................................................................................................................
.................................................................................................................................................................................
................................................................................................................................................................. □ Done

Warranty card filled in? □ Yes □ No


Date of warranty start: ...........................................

Complete report discussed with responsible rep- VOLVO PENTA


resentative Commissioning engineer

........................................................................... ...........................................................................
Signature Signature

........................................................................... ...........................................................................
Name Name

........................................................................... ...........................................................................
Place Date

2013-7 10