Flagstate: .................................................................
Classification: .........................................................
Contents
A. General information ................................................................................. 3
B. Engine installation information ................................................................ 5
C. Installation Check-Up ............................................................................... 6
D. Before Starting Checklist .......................................................................... 8
E. Test record ............................................................................................... 9
2
2013-7
Commissioning Report
A. General information
Shipyard / Installer
Name: Yard no.:
Address: Representative:
3
2013-7
Commissioning Report
Diesel engine
Make: Volvo Penta
Type:
Serial no.:
□ Normal genset □ Emergency genset □ Combined genset
□ Other, please describe:
4
2013-7
Commissioning Report
Engine location
• Engine installed on tank top □ Yes □ No
• Installed on floor over main engine in engine room □ Yes □ No
• Installed outside engine room □ Yes □ No
• Extra strength plates / longitudinal under the frame □ Yes □ No
Accessibility
• Possibility to change filter □ Yes □ No
• Service access to crank case cover □ Yes □ No
• Possibility to change oil in the pan □ Yes □ No
• Service access sideways □ Yes □ No
• Service access up / down □ Yes □ No
• Service access front / rear □ Yes □ No
• Service area according to GA-drawings □ Yes □ No
Engine support
• Steel plate (welding plate) under the flexible □ Yes □ No
engine mountings
Generator
Engine
End of loop
1 5 Unit:
2 6 mm inch
3 7
P0010625 4 8
2013-7 5
Commissioning Report
C. Installation Check-Up
Exhaust system
• Exhaust system has been calculated regarding back- □ Yes □ No
pressure
Fuel system
• Fuel system according to recommendations □ Yes □ No
• Fuel pre-filters are fitted □ Yes □ No
• Flexible fuel hoses are fitted □ Yes □ No
• Pipe dimensions: Supply Ø ............ mm / in Return Ø ............ mm / in
• Type of fuel. Quality: ....................................................................................
2013-7 6
Commissioning Report
Generator
• Power cables according to generator manufacturer □ Yes □ No
2013-7 7
Commissioning Report
1 If electric starters are used, make sure the polarity of the voltage supply is correct. □
2 Before turning on the power to the engine connector box, make sure the polarity is correct. □
3 Only D5/D7: □
Disconnect all connections except the “six cable” connection on the rpm control.
The following cables must remain connected: rpm, actuator and power supply.
7 Clean the exhaust pipe near the turbo from metallic welding ashes. □
8 Disconnect the air hose near the starter / regulator and blow all welding remains and dirt □
out by using starting air.
CAUTION!
Risk of eye injury. Eye protection required.
NOTICE! The high pressure can cause great reaction forces on the hose. Take actions to
avoid personal injury.
10 Open the top cover of the generator and check the cable connections. Check that there □
are no objects present which can cause a short circuit. The generator must be free from
metallic dust.
11 The phase cables must not be run through the side plates one by one. □
The reason is that the magnetic field in the cables will heat the steel plate. If a non-magnetic
plate is used close to the cable, it is ok to run the cables one by one. Running all phase
cables through a steel plate and through one hole only is ok, because the three fields will
eliminate each other.
12 Ask for a confirmation from the shipyard that the other ends of the cables (main switch- □
board) are connected correctly.
14 If required by classification surveyor, check that all remaining alarms give correct informa- □
tion.
2013-7 8
Commissioning Report
E. Test record
2. load test
50-100%
100%-0
*If the generator is equipped with this item, make a note of this.
2013-7 9
Commissioning Report
Overall comments
.................................................................................................................................................................................
.................................................................................................................................................................................
.................................................................................................................................................................................
.................................................................................................................................................................................
.................................................................................................................................................................................
.................................................................................................................................................................................
.................................................................................................................................................................................
.................................................................................................................................................................................
.................................................................................................................................................................................
.................................................................................................................................................................................
.................................................................................................................................................................................
.................................................................................................................................................................................
.................................................................................................................................................................................
.................................................................................................................................................................................
.................................................................................................................................................................................
.................................................................................................................................................................................
.................................................................................................................................................................................
.................................................................................................................................................................................
.................................................................................................................................................................................
................................................................................................................................................................. □ Done
........................................................................... ...........................................................................
Signature Signature
........................................................................... ...........................................................................
Name Name
........................................................................... ...........................................................................
Place Date