QUOTATION OF SURVEYING WORKS

No. TYPE OF FEE FEE QUANTITY TOTAL


(1) Proposal plan RM350.00 1 RM350.00
(2) Refixation/Replacement of
Boundary Mark RM170.00 12 RM2040.00

(3) The payment per lot by area:

i. First 200 square metres RM350.00 200 square metres RM350.00


ii. Each additional 100 square RM10.00 5300 square metres RM530.00
metres

(4) Continuation and azimuth RM350.00 1 RM350.00


(5) Digital data processing: RM724.00 RM724.00
20% from the total of
(1) + (2) + (3) + (4)

(6) Other payments:

i. Building details RM250.00 6 RM1500.00


ii. QT RM30.00 4 RM120.00
iii. Mobilization RM200.00 RM200.00

(7) Service tax:


5% from the total of
(1) + (2) + (3) + (4) + (5) + (6) RM308.20 RM308.20

TOTAL RM6472.20