Professional Documents
Culture Documents
Assignment AASTU
Assignment AASTU
2.0 8760
4.0 7000
6.0 4380
8.0 2628
10.0 1752
12.0 876
15.0 87
Plot the load duration curve and determine the load factor.
2. A power plant has a peak demand of 15 NIW, load factor is 0.70, plant capacity factor is
0.525 and a plant use factor of 0.85. Determine:
(a) daily energy produced
(b) reserve capacity of the plant.
(c) the maximum energy that could be produced daily if the plant operating schedule is fully
loaded when in operation.
3 A generating station has peak demand of 120 MM and its connected load is 200 MW. The
energy produced annually is 4 x 105 MW-hr. Determine:
(a) load factor (b) demand factor
4. A power plant has to meet the following load demand:
Load A: 100 MW from 8 AM-6PM
Load B: 150 MW from 6 AM- 10 AM
Load C: 50MW from 6 AM- 10 AM
Load D: 20MW from 10 AM - 6 AM
Plot the daily load curve and determine.
(a) diversity factor (b) load factor (c) daily energy produced.
5. From a load duration curve, following data are available:
Maximum demand on the system is 40 MW. The load supplied by the two generating units is
28 MW and 20 MW. Unit no. 1 is the base unit and works for all the time. Unit no. 2 is peak
load unit and works only for 40% of the time. The energy produced annually by unit 1 is
2 x 108 units and that by unit 2 is 15 x 166 units. Find the:
(a) load factor (b) plant capacity factor (c) plant use factor of both the units.
Also (d) determine the load factor of the total plant.