Professional Documents
Culture Documents
Access Positions and Parking Fire Station Building Materials
Access Positions and Parking Fire Station Building Materials
Access Positions and Parking Fire Station Building Materials
Parking Space
Interior wall
finish
Access from The fire station has 3 fold doors and casement
Merseburger Chaussee window types with hipped roof
Interior has upper concrete finish with smooth brick
Access from Leipzig wall cladding
West Highway
There are access points that provide access from Leipzig West Highway and Merseburger
Chaussee road ad also parking spaces at each department. The garage area has large parking
space to accomodate more vehicles and towed vehicles
GARAGE BUILDING MATERIALS HOSPITAL BUILDING MATERIALS
REVISION
NOTES
JOB DESCRIPTION
SCALE DATE
CHRIS ONYANGO
B12/5561/2017
Window
Door