01 02 03 04 05 06 07

PROJECT NAME

G-102-01 ( 790DBBC)
PROJECT LOCATION

AL-SHAHANIYA
NORTH
A A

B B

DN UP

C DN UP C

NOTES:
- DRAINAGE & CONDENSATE DRAIN INSTALLATION SHALL BE
1154.58 IN ACCORDANCE WITH QCS, IPC, ASHGHAL AND ASHRAE
DN DN STANDARDS.

D D - ALL EXTERNAL DRAINAGE PIPE SHALL BE ESVC OR GRP PIPES.


- DRAINAGE INSTALLATIONSHALL BE ACCORDANCE WITH
QCS,IPC and ASHGHAL Standard.
DN DN
- FINAL APPROVAL OF EXTERNAL LAYOUT SHALL BE DONE
DN DN AFTER SUBMISSION SITE PLAN .
- ALL CONDENSATE DRAIN PIPE SHALL PROVIDE PIPE
INSULATION.
- THE CONTRACTOR IS RESPONSIBLE FOR COORDINATE WITH
OTHER DISCIPLINES PRIOR TO SITE EXECUTION.
E E

F F

FIRST FLOOR PLAN - DRAINAGE SYSTEM


01 SCALE 1:100

01 02 03 04 05 06 07

REV-01 APRIL 2020 MAW AN M.I.

Rev-00 FEB 2020 MAW AN M.I.

ISSUE DESCRIPTION DATE DRAWN CHECKED QA/QC

OWNER
A A
QATAR ARMED FORCES
QATAR EMIRI CORPS OF ENGINEERS

B B MAIN CONTRACTOR

93.33 DN

DN PM/CM

C DN C
LEAD CONSULTANT

PROJECT DESCRIPTION
D D

ALUMINUM PERGOLA DRAWING TITLE

FIRST & ROOF FLOOR PLAN


DRAINAGE SYSTEM
DRAWING. NO: PART:

E E
DR-OC-102-00 00

DRAWN BY: CHECKED BY: STAGE: REVISION:

MAW HF DD
F F VERIFIED BY: APPROVED BY: PLOT DATE: 01
ME AN
SCALE: PROJECT. NO:
ROOF FLOOR PLAN - DRAINAGE SYSTEM 1:100 @ A1
02 SCALE 1:100 FILE NAME: 357
DR-OC-102-00