PROJECT NAME

G-102-01 ( 790DBBC)
PROJECT LOCATION

AL-SHAHANIYA
NORTH

NOTES:
- DRAINAGE & CONDENSATE DRAIN INSTALLATION SHALL BE
IN ACCORDANCE WITH QCS, IPC, ASHGHAL AND ASHRAE
08 09 STANDARDS.
01 02 03 04 05 06 07 - ALL EXTERNAL DRAINAGE PIPE SHALL BE ESVC OR GRP PIPES.
- DRAINAGE INSTALLATIONSHALL BE ACCORDANCE WITH
QCS,IPC and ASHGHAL Standard.
- FINAL APPROVAL OF EXTERNAL LAYOUT SHALL BE DONE
AFTER SUBMISSION SITE PLAN .
- ALL CONDENSATE DRAIN PIPE SHALL PROVIDE PIPE
INSULATION.
A A - THE CONTRACTOR IS RESPONSIBLE FOR COORDINATE WITH
OTHER DISCIPLINES PRIOR TO SITE EXECUTION.

CORECO CORECO CORECO

1494 x 400

B B

1494 x 400

UP

DN
DN

C UP C

REV-01 APRIL 2020 MAW AN M.I.

REV-00 FEB 2020 MAW AN M.I.

DN ISSUE DESCRIPTION DATE DRAWN CHECKED QA/QC


UP UP
DN
UP 1154.58 UP

OWNER
D D
QATAR ARMED FORCES
QATAR EMIRI CORPS OF ENGINEERS

UP UP

MAIN CONTRACTOR

E E

PM/CM

F F

DN DN
LEAD CONSULTANT
DN

PROJECT DESCRIPTION

01 02 03 04 05 06 07 08 09 DRAWING TITLE

GROUND FLOOR PLAN


DRAINAGE SYSTEM
DRAWING. NO: PART:

DR-OC-101-00 00

DRAWN BY: CHECKED BY: STAGE: REVISION:

MAW HF DD
VERIFIED BY: APPROVED BY: PLOT DATE: 01
ME AN
SCALE: PROJECT. NO:
GROUND FLOOR PLAN - DRAINAGE SYSTEM 1:100 @ A1
01 SCALE 1:100 FILE NAME: 357
DR-OC-101-00