Download as pdf or txt
Download as pdf or txt
You are on page 1of 210

SULTANATE OF OMAN

PUBLIC AUTHORITY FOR WATER

REINFORCEMENT OF AD DAKHILIYAH
WATER TRANSMISSION SYSTEM
PHASE II

FINAL TENDER DOCUMENTS


TENDER No.______/2019

VOLUME 4 OF 4

TENDER DRAWINGS
PART 1

APRIL 2019
SULTANATE OF OMAN Table of Contents
PUBLIC AUTHORITY FOR WATER Page 1 of 3

REINFORCEMENT OF THE EXISTING AD DAKHILIYAH


WATER TRANSMISSION SYSTEM
PHASE II

FINAL TENDER DOCUMENTS


TENDER No.______/2019

VOLUME 4 OF 4

TENDER DRAWINGS

1. Ad Dakhliyah Water Transmission System-Overall Scheme (Sht.1) 0600-DAKH-EE-TPST-F001


2. Ad Dakhliyah Water Transmission System -Water Supply Scheme (Sht.2) 0600-DAKH-EE-TPST-F002
3. Ad Dakhliyah Water Transmission System - Block Flow Diagram (Sht.2) 0600-DAKH-EE-TPST-F003
4. Ad Dakhliyah Water Transmission System-Overall Layout (Shts.5) 0600-DAKH-EE-TPLT-F001
5. Ad Dakhliyah New Water Transmission Pipeline - Section MPS - BPS1 -Key Plan (Sht.1) 0600-DAKH-EE-TPLT-F002
6. Ad Dakhliyah New Water Transmission Pipeline - Section MPS - BPS1 -Layout and Profiles (Sht.33) 0600-DAKH-EE-TPLT-F003
7. Ad Dakhliyah New Water Transmission Pipeline - Section BPS1- BPS2 -Key Plan (Sht.1) 0600-DAKH-EE-TPLT-F004
8. Ad Dakhliyah New Water Transmission Pipeline - Section BPS1- BPS2 -Layout and Profiles (Sht.22) 0600-DAKH-EE-TPLT-F005
9. Ad Dakhliyah New Water Transmission Pipeline - Section BPS2 - BPS3 -Key Plan (Sht.1) 0600-DAKH-EE-TPLT-F006
10. Ad Dakhliyah New Water Transmission Pipeline - Section BPS2 - BPS3 -Layout and Profiles (Sht.21) 0600-DAKH-EE-TPLT-F007
11. Ad Dakhliyah New Water Transmission Pipeline - Section BPS3 - SR -Key Plan (Sht.1) 0600-DAKH-EE-TPLT-F008
12. Ad Dakhliyah New Water Transmission Pipeline - Section BPS3 - SR -Layout and Profiles (Sht.8) 0600-DAKH-EE-TPLT-F009
13. Ad Dakhliyah New Water Transmission Pipeline - Section SR - New BPS4 -Key Plan (Sht.1) 0600-DAKH-EE-TPLT-F0010
14. Ad Dakhliyah New Water Transmission Pipeline - Section SR - New BPS4 -Layout and Profiles (Sht.68) 0600-DAKH-EE-TPLT-F0011
15. Ad Dakhliyah New Water Transmission Pipeline - Section New BPS4 - CP(Al Mamura) -Key Plan (Sht.1) 0600-DAKH-EE-TPLT-F0012
16. Ad Dakhliyah New Water Transmission Pipeline - Section New BPS4 - CP(AL Mamura) -Layout and Profiles (Sht.24) 0600-DAKH-EE-TPLT-F0013
17. Off -Take Pipelines - Layouts and Schemes (Shts.12) 0600-DAKH-EE-TPLT-F0014
18. Interconnection Pipelines - Layouts and Schemes (Sht.2) 0600-DAKH-EE-TPLT-F0015
19. New MPS Site - Location Map (Sht.1) 0600-DAKH-EE-TSGT-F001
20. New MPS Site - General Layout (Sht.1) 0600-DAKH-EE-TSGT-F002
21. New MPS Site- Equipment & Piping Arrangement- Layouts and Sections (Shts.3) 0600-DAKH-EE-TSMT-F001
22. New MPS - Architectural Plan, Elevations, Sections and Details (Shts. 4) 0600-DAKH-EE-TSAT-F001
23. MPS Balancing Reservoir -G.A. Plan, Sections and Details (Shts. 3) 0600-DAKH-EE-TRWT-F001
24. New BPS1 Site - Location Map (Sht.1) 0600-DAKH-EE-TSGT-F003
25. New BPS1 Site - General Layout (Sht.1) 0600-DAKH-EE-TSGT-F004
26. New BPS1 Site- Equipment & Piping Arrangement- Layouts and Sections (Shts. 3) 0600-DAKH-EE-TSMT-F002
27. New BPS1 - Architectural Plan, Elevations, Sections and Details (Shts. 4) 0600-DAKH-EE-TSAT-F002
28. BPS1 Balancing Reservoir -G.A. Plan, Sections and Details (Shts 3) 0600-DAKH-EE-TRWT-F002
29. New BPS2 Site - Location Map (Sht.1) 0600-DAKH-EE-TSGT-F005
30. New BPS2 Site - General Layout (Sht.1) 0600-DAKH-EE-TSGT-F006
31. New BPS2 Site- Equipment & Piping Arrangement- Layouts and Sections (Shts. 3) 0600-DAKH-EE-TSMT-F003
32. New BPS2 - Architectural Plan, Elevations, Sections and Details (Shts.4) 0600-DAKH-EE-TSAT-F003
33. BPS2 Balancing Reservoir -G.A. Plan, Sections and Details (Shts.3 ) 0600-DAKH-EE-TRWT-F003
34. New BPS3 Site - Location Map (Sht.1) 0600-DAKH-EE-TSGT-F007
35. New BPS3 Site - General Layout (Sht.1) 0600-DAKH-EE-TSGT-F008
36. New BPS3 Site- Equipment & Piping Arrangement- Layouts and Sections (Shts. 3) 0600-DAKH-EE-TSMT-F004
37. New BPS3 - Architectural Plan, Elevations, Sections and Details (Shts. 4) 0600-DAKH-EE-TSAT-F004
38. BPS3 Balancing Reservoir -G.A. Plan, Sections and Details (Shts. 3) 0600-DAKH-EE-TRWT-F004
39. New BPS4 Site - Location Map (Sht.1) 0600-DAKH-EE-TSGT-F009
40. New BPS4 Site - General Layout (Sht.1) 0600-DAKH-EE-TSGT-F010
41. New BPS4 Site- Equipment & Piping Arrangement- Layouts and Sections (Shts. 3) 0600-DAKH-EE-TSMT-F005
42. New BPS4 - Architectural Plan, Elevations, Sections and Details (Shts. 4) 0600-DAKH-EE-TSAT-F005
43. BPS4 Balancing Reservoir -G.A. Plan, Sections and Details (Shts.3) 0600-DAKH-EE-TRWT-F005
44. Summit Reservoirs-Location Map (Shts 2) 0600-DAKH-EE-TRGT-F001
45. Summit Reservoirs-General Layout (Shts 2) 0600-DAKH-EE-TRGT-F002
46. Summit Reservoirs-Piping Arrangement - Layout (Shts. 2) 0600-DAKH-EE-TRMT-F001
47. New Surge Feed Tank -Location Map (Shts 1) 0600-DAKH-EE-TRGT-F003
48. New Surge Feed Tank -General Layout (Shts 1) 0600-DAKH-EE-TRGT-F004
49. New Surge Feed Tank- Piping Arrangement Layout and Sections (Sht.1) 0600-DAKH-EE-TRMT-F002
50. New Surge Feed Tank -G.A. Plan, Sections and Details (Sht.1 ) 0600-DAKH-EE-TRWT-F006

APRIL 2019
SULTANATE OF OMAN Table of Contents
PUBLIC AUTHORITY FOR WATER Page 2 of 3

REINFORCEMENT OF THE EXISTING AD DAKHILIYAH


WATER TRANSMISSION SYSTEM
PHASE II

FINAL TENDER DOCUMENTS


TENDER No.______/2019

VOLUME 4 OF 4

TENDER DRAWINGS

51. Chlorination Building - Architectural Plan, Elevations, Sections and Details (Shts. 3) 0600-DAKH-EE-TSAT-F006
52. Guard House - Type 1- Architectural Plan, Elevations, Sections and Details (Shts.2) 0600-DAKH-EE-TSAT-F007
53. Guard House - Type 2- Architectural Plan, Elevations, Sections and Details (Shts. 2) 0600-DAKH-EE-TSAT-F008
54. Car Parking - G.A. Plan, Sections and Details (Sht.1) 0600-DAKH-EE-TRWT-F007
55. Boundary Wall and Gates - G.A. Plan, Sections and Details (Sht.1 ) 0600-DAKH-EE-TRWT-F008
56. Foundation Protection Typical Details (Sht.1) 0600-DAKH-EE-TRWT-F009
57. Isolation Valve Chambers (CS Pipeline) - Piping Arrangement - Typical Details (Sht.1) 0600-DAKH-EE-TPPT-F001
58. Air Release Valve Chambers (CS Pipeline) - Piping Arrangement - Typical Details (Sht.1) 0600-DAKH-EE-TPPT-F002
59. Washout /Drain Chambers (CS Pipeline) - Piping Arrangement - Typical Details (Sht.2) 0600-DAKH-EE-TPPT-F003
60. Existing Birkat Al Mouz 1 ESR- Overall Layout (Sht.1) 0600-DAKH-EE-TRGT-F001
61. Existing Manah ESR- Overall Layout (Sht.1) 0600-DAKH-EE-TRGT-F002
62. Existing Booster Pump Station 4 (BPS4) - Overall Layout (Sht.1) 0600-DAKH-EE-TSGT-F011
63. Existing Sypa ESR- Overall Layout (Sht.1) 0600-DAKH-EE-TRGT-F003
64. Existing Jibreen ESR- Overall Layout (Sht.1) 0600-DAKH-EE-TRGT-F004
65. Electrical Works- MPS -11kV SWG Sngle Line Diagram (Sht.1) 0600-DAKH-EE-TPET-F001
66. Electrical Works- BPS1 -11kV SWG Single Line Diagram (Sht.1) 0600-DAKH-EE-TPET-F002
67. Electrical Works- BPS2 -11kV SWG Single Line Diagram (Sht.1) 0600-DAKH-EE-TPET-F003
68. Electrical Works- BPS3 -11kV SWG Single Line Diagram (Sht.1) 0600-DAKH-EE-TPET-F004
69. Electrical Works- BPS4 -11kV SWG Single Line Diagram (Sht.1) 0600-DAKH-EE-TPET-F005
70. Electrical Building (Typical) - Plan & Sections (Sht.1) 0600-DAKH-EE-TPET-F006
71. Electrical Works- MPS -Power Supply -Layout (Sht.1) 0600-DAKH-EE-TPET-F008
72. Electrical Works- BPS1 - Power Supply -Layout (Sht.1) 0600-DAKH-EE-TPET-F009
73. Electrical Works- BPS2 - Power Supply -Layout (Sht.1) 0600-DAKH-EE-TPET-F010
74. Electrical Works- BPS3 - Power Supply -Layout (Sht.1) 0600-DAKH-EE-TPET-F011
75. Electrical Works- BPS4 - Power Supply -Layout (Sht.1) 0600-DAKH-EE-TPET-F012
76. Electrical Works- Summit Reservoir Compound - Power Supply -Layout (Sht.1) 0600-DAKH-EE-TPET-F013
77. SCADA System -Pump Station P&I Diagram - Legend (Sht.1) 0600-DAKH-EE-TSIT-F001
78. SCADA System - MPS Pump Station - P& I Diagram (Sht.1) 0600-DAKH-EE-TSIT-F002
79. SCADA System -MPS Suction Reservoir - P& I Diagram (Sht.1) 0600-DAKH-EE-TRIT-F001
80. SCADA System - BPS 1,2 & 3 Pumping Station - P&I Diagram (Sht.1) 0600-DAKH-EE-TSIT-F003
81. SCADA System - BPS 1,2 & 3 Suction Reservoir - P&I Diagram (Sht.1) 0600-DAKH-EE-TRIT-F002
82. SCADA System - Summit Reservoir - P& I Diagram (Sht.1) 0600-DAKH-EE-TRIT-F003
83. SCADA System - BPS4 Pumping Station - P&I Diagram (Sht.1) 0600-DAKH-EE-TSIT-F004
84. SCADA System - BPS4 Suction Reservoir - P&I Diagram (Sht.1) 0600-DAKH-EE-TRIT-F004
85. Electro Chlorination System - P&I Diagram - Typical (Sht.1) 0600-DAKH-EE-TRIT-F005
86. SCADA System - Flow Control Valves - P&I Diagram - Typical (Sht.1) 0600-DAKH-EE-TPIT-F001
87. SCADA-System Typical PLC Configuration (Sht.1) 0600-DAKH-EE-TPIT-F002
88. SCADA System - Instrumentation Equipment Termination-Typical (Sht.1) 0600-DAKH-EE-TPIT-F003
89. SCADA System - Instrument Termination in Field Junction Box-Typical (Sht.1) 0600-DAKH-EE-TPIT-F004
90. SCADA System - Instrumentation Termination in Panels-Typical (Sht.1) 0600-DAKH-EE-TPIT-F005
91. SCADA System - Instrumentation Earthing Philosophy-Typical (Sht.1) 0600-DAKH-EE-TPIT-F006
92. SCADA System - Analog Wiring Methods and Technique - Typical(Sht.1) 0600-DAKH-EE-TPIT-F007
93. SCADA System - FOC New Network Layout (Sht.1) 0600-DAKH-EE-TPIT-F008
94. SCADA System - Network Switch Typical Connection, Block Layout (Sht.1) 0600-DAKH-EE-TPIT-F009
95. SCADA System - FOC Typical Connection Details (Sht.1) 0600-DAKH-EE-TPIT-F010
96. Electrical Works- Primary Substations -33/11kV For New Pumping stations - Single Line Diagram (Sht.1) 0600-DAKH-EE-TPET-F014

APRIL 2019
SULTANATE OF OMAN Table of Contents
PUBLIC AUTHORITY FOR WATER Page 3 of 3

REINFORCEMENT OF THE EXISTING AD DAKHILIYAH


WATER TRANSMISSION SYSTEM
PHASE II

FINAL TENDER DOCUMENTS


TENDER No.______/2019

VOLUME 4 OF 4

TENDER DRAWINGS

PAEW STANDARD DRAWINGS

Index Title Version Note

1. TET/SD/5004 Gate Valve Chamber for DN 300 and Less V1.0


2. TET/SD/5005 Air Release Valve Chamber V1.0
3. TET/SD/5006-A Drain/Washout Chamber for DI Pipe V1.1
4. TET/SD/5006-B Drain/Washout Chamber for HDPE pipe V1.1
5. TET/SD/5007 Butterfly Valve Chamber V1.0
6. TET/SD/5009 Bulk Meter Installation DN 200 and Less V1.0
7. TET/SD/5010 Bulk Meter Installation DN 250 to DN 500 Without Reducer V1.0
8. TET/SD/5011 Bulk Meter Installation DN 250 to DN 500 With Reducer V1.0
9. TET/SD/5012 Pressure Monitoring Point V1.0
10. TET/SD/5013 Wadi Crossing V1.0
11. TET/SD/5014 Road Crossing V1.1
12. TET/SD/5015 Pipeline Marker Post V1.1
13. TET/SD/5016 Water Quality Sampling Point for Network V1.2
14. TET/SD/5017 Water Quality Sampling Point for Vertical or Horizontal Pipes V1.2
15. TET/SD/5018 Thrust Blocks V1.0
16. TET/SD/5019 Typical Pipe Lining V1.1
17. TET/SD/5020 Connection to Existing Pipe Lines V1.0
18. TET/SD/5022 Aluminium Ladder, Retractable Safety Handhold Bar, Safety Cage V1.0
19. TET/SD/5023 Fiber Optic Cable Chamber Details V1.0
20. TET/SD/5024 Pressure Reducing Valve Chamber V1.0
21. TET/SD/5026 Typical RCC Slab Protection Details for Existing Water Supply Pipes V1.1
22. TET/SD/5027 Typical Thrust Block Details at Tie - in Point for Relocation of Existing Pipes V1.0
23. TET/SD/5028 Typical Duct Detail for Future Pipe V1.0

APRIL 2019
520000 E

530000 E

540000 E

550000 E

560000 E

570000 E

580000 E

590000 E

600000 E

610000 E

620000 E

630000 E
EXISTING PIPELINE

NEW PIPELINE
FUTURE PIPELINE (BY OTHERS)

EXISTING RESERVOIR
BARKA
NEW RESERVOIR

AS SEEB FUTURE RESERVOIR (BY OTHERS)

EXISTING PUMPING STATION

NEW PUMP STATION

EXISTING TANKER FILLING


STATION (TFS)

EXISTING ELEVATED TANK (BPT)

BAWSHER

BID BID

AL HAMRA SAMAIL

NIZWA

BAHLA

IZKI
BAHLA

MANAH
MUDAYBI
520000 E

530000 E

540000 E

550000 E

560000 E

570000 E

580000 E

590000 E

600000 E

610000 E

620000 E

630000 E
xx PIPE DIAMETER (ID)
xxx m
EXISTING
PIPE LENGTH
BPS-1 - TFS SAMAIL PRISON
RUSAYL ESR BID-BID ESR BID-BID ESR Reservoir EXISTING TANKER FILLING
EL.128.50 m FANJA ESR (NEW) (OLD) EL.450 m STATION (TFS)
EL.250 m EL.280 m EL.280 m
SAYH AHMER ESR
EL.260 m EXISTING ELEVATED TANK

LIZUQ
EL.321 m EXISTING RESERVOIR

613 m

350 m

645 m
EXISTING PUMP
3,305m

BARKA NEW RESERVOIR

126 m
1,740 m
(Treatment Works)

300 m
MPS Reservoir BPS-1 Reservoir
EL.46 m EL.197.34 m

4,600 m
NEW PUMP

1,160 m
xx PIPE DIAMETER ( DN)

652 m
3,200 m xxx m NEW
PIPE LENGTH
FUTURE (BY OTHERS)

8,051 m 10,608 m 11,664 m 5,191 m 2m FUTURE (BY OTHERS)

NORMALLY CLOSED

NORMALLY OPENED

BARKA BPS BOOSTER PUMP STATION


(Treatment Works) SEEB
Reservoir DI DUCTILE IRON

DN 800 (MS)

DN 400 (DI)

DN 600 (DI)
EL GROUND ELEVATION
SEEB WILAYAT BID-BID WILAYAT

1,200 m

DN 1000

64 m
76 m
MPS Reservoir BPS-1 Reservoir MS MILD STEEL

19 m
EL.47 m EL.201 m
WILAYAT BOUNDARY

DN 1700 DN 1600 DN 1600 DN 1600 DN 1500


9,890 m 22,460 m 510 m 5,150 m 12 m

2,408m
SEEB
Reservoir

WADI MAHRAM ESR TFS-2 TAWI NISF ESR SAMAIL ESR FALJAT- TFS FANFARAH ESR
EL.654 m EL.595.67 m EL.517 m EL.450 m EL.324.56 m EL.300 m
FUTURE
SAMAIL ESR

DN 1500
2,685 m
BREAK PRESSURE
TANK
BPS-3 Reservoir BPS-2 Reservoir
EL.662 m EL.491.50 m EL.387.50 m
3,247 m

1,377 m
TWL.692 m
360 m

364 m

342 m
650 m

15 m 5,295 m 1,835m 6,963 m 5,731 m 9,827 m 3,918 m 8,530 m 5,861 m


IZKI WILAYAT

TFS-1
EL.596.40 m
SAMAIL WILAYAT
SUMMIT ESR 125 m
DN 400 (DI)

DN 200 (DI)
DN 300 (DI)

DN 500 (DI)

EL. 700 m BPS-3 Reservoir BPS-2 Reservoir


14 m

36 m
TWL.712 m EL.538 m EL.391 m
32 m

68 m

DN 1400 DN 1400 DN 1400 DN 1400 DN 1400 DN 1500 DN 1500


5,929 m 10,239 m 10,113 m 9,959 m 3,949 m 14,018 m
MANAH FUTURE ADAM WILAYAT xx PIPE DIAMETER (ID)
EXISTING
WILAYAT MANAH xxx m PIPE LENGTH
EL.XXX.00m ADAM
ESR EXISTING TANKER FILLING
MANAH EL.352.00m STATION (TFS)
ESR JEBAL
EL.479.00m AKHDAR-PS
EXISTING ELEVATED TANK
EL.572.60m
FUTURE FUTURE FUTURE FUTURE
FIRQ FIRQ (ADAM) HAY AL WASIT BIRKAT BIRKAT IZKI ESR
PS BPT TURATH ESR ESR AL MOUZ-2 ESR AL MOUZ-1 ESR EL.645.00m EXISTING RESERVOIR
FIRQ ESR
EL.468.00m EL.560.00m EL.485.00m EL.530.00m EL.580.00m EL.590m EL.620.00m

DN 300/200 (DI)
EXISTING PUMP

12.494 m
TFS-5 TFS-4 TFS-3 AL AFIAH TFS
EL.560.03 m EL.569.38 m EL.618.95 m EL.671.81 m
NEW RESERVOIR
DN 200 (DI)
BREAK PRESSURE
184m TANK NEW PUMP
EL.662 m
IZKI MOD TWL.692 m xx PIPE DIAMETER ( DN)
xxx m NEW

DN 400 (DI)
TAPPING PIPE LENGTH

DN 300 (DI)

DN 600 (DI)
DN 300 (DI)

DN 200 (DI)
DN 400 (DI)

DN 300 (DI)

DN 400 (DI)

DN 300 (DI)
1000 m

EL.575.75 m

1423 m
875.0 m
2387 m
2268 m

438 m

DN 100 (DI)
701 m
FUTURE (BY OTHERS)

424 m

160 m

DN 200 (DI)

DN 200 (DI)

DN 200 (DI)

200 (DI)
213 m
56 m
762 m

777 m

100 m
FUTURE (BY OTHERS)
894
793 793 793 793 (MS)
691 (MS) 691 (MS) 691 (MS) (MS) 793 (MS) 793 (MS) (MS) (MS) (MS) 793 (MS) 793 (MS) 894 (MS) 894 (MS) 894 (MS) 894 (MS) 894 (MS) NORMALLY CLOSED
793 (MS)
11,486 m 950 m 125 m 4,827 m 5,289 m 3,582 m 1,886 m 1,798 m 369 m 6,829 m 1,898 m 1,084 m 922 m 9,134 m 5,686 m 2,514 m
95 m NORMALLY OPENED

DN 150 (DI)
BPS BOOSTER PUMP STATION

115 m
DI DUCTILE IRON

NIZWA WILAYAT IZKI WILAYAT MS MILD STEEL


EL GROUND ELEVATION
DN 900 (MS)
TWL. TOP WATER LEVEL
DN 700 (MS)

10 m
DN 300 (DI)

DN 400 (DI)

DN 300 (DI)

DN 600 (DI)
DN 600 (DI)

DN 400 (DI)

DN 300 (DI)

DN 400 (DI)

DN 300 (DI)

DN 200 (DI)

26 m
60 m

157 m
10 m

9m
20 m

22 m
9m
12751 m

20 m

438 m
SUMMIT ESR BWL. BOTTOM WATER LEVEL
TFS- EL. 700 m
EL.588.00 m TWL.712 m
WILAYAT BOUNDARY
DN 600 (DI)

12 m
1,553 m

DN 800 (MS) DN 900 (MS) DN 900 (MS) DN 1200 (MS) DN 1200 (MS) DN 1200 (MS) DN 1200 (MS) DN 1200 (MS) DN 1200 (MS) DN 1400 (MS) DN 1400 (MS)
158,0 m 1,731 m 136 m 126m 3,911 m 5,208 m 4,553 m 1,770 m 1,870 m 9,343 m 18,266 m 5,285 m

DN 1200

ASH SHARQIYAH WTS


CONNECTION TO
(HAY AL SAAD)
SYPA ESR WADI SAMIT ESR TANUF ESR MAMURA ESR
EL.590.00 m EL.630.00 m EL.672.75 m EL.651.00 m
DN 800 (MS)
10,771 m

BAHLA WILAYAT

BPS-4
EL.539.50 m
DN 300 (DI)

DN 200 (DI)

DN 400 (DI)

DN 300 (DI)
1,467 m

1,074 m
1,883m

JIBREEN ESR

837 m
DN 400 (DI) EL.620.00 m
2,131 m

DN 600 (DI) DN 600 (DI) DN 600 (DI) DN 600 (DI) DN 500 (DI) DN 500 (DI) DN 400 (DI) DN 300 (DI) DN 300 (DI)
303 m 5,085 m 13,970 m 7,539 m 3,798 m 6,676 m 2,870 m 910 m

DN 600 (DI)
NEW BPS-4 765 m
EL.553.00 m FUTURE
NEW BAHLA ESR
DN 500 (DI)

EL.610 m
BPS-5
769 m

DN 500 (DI)
EL.598.00m
2,577 m
DN 700 (MS)
3,649 m
HAMRA ESR
EL.749 m
DN 300 (DI)

DN 500 (DI) DN 400 (DI)


144m

7,350 m 2,384 m

NIZWA WILAYAT

DN 700 (MS)
20,740 m
FUTURE
TAYMSA ESR AL HAMRA WILAYAT
EL.536.00 m
KEY:

TRANSMISSION MAIN
FANJA BID-BID BID-BID SAMAIL
ESR 3 ESR ESR
(OLD) PRISON 0FF TAKE
(OLD)

SAYH AHMER
ESR PUMPING STATION & RESERVOIR
(NEW)
TFS
5 NEW PROPOSED
(BPS-1)

EXISTING
RUSAYL LIZUQ FALJAT SAMAIL TAWI WADI
ESR TFS ESR NISF TFS-2 MAHRAM
ESR
NETWORK ESR FUTURE

SAMAIL EXISTING
ESR

2 7 8 10 12 13 16 17

NEW PROPOSED
GRAVITY MAIN

MPS 1 BPS-1 BPS-2 BPS-3 BREAK


6 11 15 18 FUTURE
TANK

NORMALLY OPEN
9 14
NORMALLY CLOSED
MOD
4
(BPS-1)
FANFARAH TFS-1
ESR

2 7 8 9 12 13 17

SAMMIT
MPS 1 BPS-1 6 BPS-2 11 BPS-3 15 18
ESR

No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

WADI MAHRAM
RUSAYL- ESR
MPS-OUTPUT

BREAK TANK
MOD (BPS-1)

BID-BID-ESR

SAMAIL-ESR
FALJAT TFS
TFS (BPS-1)
FANJA-ESR

FANFARAH
LIZUQ-ESR

NETWORK
TAWI NISF

DEMAND
DEMAND

DEMAND

DEMAND

DEMAND

DEMAND

DEMAND

DEMAND

DEMAND

DEMAND
OUTPUT

OUTPUT

OUTPUT
DESCRIPTION
BPS-1

INPUT
BPS-2

FLOW

BPS-3
TFS-1

TFS-2

ESR
ESR

l/sec 1242.0 69.4 130.0 13.3 3.9 1025.0 90.6 0.0 4.2 3.9 926.9 125.0 0.0 5.3 796.7 5.3 0.0 791.4
EXISTING
4472.0 250.0 468.0 48.0 14.0 3692.0 326.0 0.0 15.0 14.0 3337.0 450.0 0.0 19.0 2868.0 19.0 0.0 2749.0

l/sec 3447.8 724.2 0.0 0.0 0.0 2723.6 0.0 366.9 0.0 0.0 2356.7 194.4 86.1 0.0 2076.1 0.0 120.3 1955.8
NEW PIPELINE
12412.0 2607.0 0.0 0.0 0.0 9805.0 0.0 1321.0 0.0 0.0 8484.0 700.0 310.0 0.0 7474.0 0.0 433.0 7041.0
KEY:

FUTURE TRANSMISSION MAIN


MANAH
ADAM ESR
ESR 0FF TAKE

MANAH
ESR PUMPING STATION & RESERVOIR

AL AFIAH
BIRKAT JEBAL FIRQ (ADAM) FIRQ SYPA WADI SAMIT (HAY AL SAAD) MAMURA NEW PROPOSED
TFS-3 TFS-4 TFS-5 AL MOUZ-1 TANUF
TFS AKHDAR-PS BPT ESR 16 ESR ESR ESR
ESR ESR
EXISTING

FUTURE FUTURE BIRKAT FUTURE FUTURE 17 FIRQ


FUTURE
AL MOUZ-2 WASIT HAY AL PS
IZKI ESR ESR TURATH ESR
ESR
IZKI MOD
EXISTING
2 3 4 5 7

19 20 21 39
NEW PROPOSED
6 9 10 11 12 13 14 15
BREAK JIBREEN
1 BPS-4 18 38
TANK ESR
FUTURE
8
NORMALLY OPENED

NORMALLY CLOSED
TFS

FUTURE AL HAMRA
TAYMSA BPS-5 22 23
ESR
ESR

FUTURE
BAHLA
ESR
25 26 27 28 29 30 31 32 33 34 33
37

SUMMIT ESR 24 BPS-4 36

No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
JEBEL AKHDAR PS

WADI SAMIT ESR


FIRQ (ADAM) BPT
HAY AL TURATH

TANUF (HAY AL
AL AFIAH TFS

HAMRA ESR
MOUZ 1 ESR

MOUZ 2 ESR

SAAD) ESR
WASIT ESR
BIRKAT AL

BIRKAT AL

SYPA ESR
DEMAND

DEMAND

DEMAND

DEMAND
IZKI MOD
DEMAND

DEMAND

DEMAND

DEMAND

DEMAND

DEMAND

DEMAND

DEMAND

DEMAND

DEMAND

DEMAND

DEMAND

DEMAND

DEMAND

DEMAND
DEMAND

OUTPUT
OUTPUT

OUTPUT
FIRQ ESR

MANAH

FIRQ PS

BPS-5
TFS-3

TFS-5

BPS-4
TFS-4

IZKI
BPT

ESR

TFS

ESR

ESR
DESCRIPTION

l/sec 791.40 5.29 5.29 9.88 5.29 0.00 5.29 5.29 0.00 0.00 58.07 98.61 0.00 0.00 108.58 41.67 68.40 379.74 34.19 35.69 111.14 198.72 198.72
EXISTING
PIPELINE
2849.05 19.05 19.05 35.57 19.05 0.00 19.05 19.05 0.00 0.00 209.05 355.00 0.00 0.00 390.90 150.00 246.24 1367.05 123.10 128.48 400.10 715.38 715.38

No. 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39
FIRQ (ADAM)

TAYMSA ESR
TURATH ESR
MOUZ 1 ESR

MOUZ 2 ESR

MANAH ESR
AKHDAR PS
RESERVOIR

BAHLA ESR
WASIT ESR
BIRKAT AL

BIRKAT AL

MAMURA
DEMAND

DEMAND

DEMAND

DEMAND

DEMAND

DEMAND

DEMAND

DEMAND

DEMAND

DEMAND

DEMAND

DEMAND

DEMAND

DEMAND
FIRQ ESR
SUMMIT

OUTPUT

OUTPUT

JIBREEN
IZKI ESR

FIRQ PS
HAY AL

BPS-4
JEBEL

NEW

NEW
BPT

ESR

ESR
DESCRIPTION

l/sec 1955.79 343.76 25.00 126.64 0.00 0.00 172.61 428.27 0.00 124.47 68.40 83.12 583.61 337.46 147.94 98.21
NEW
PIPELINE
7040.86 1237.52 90.00 455.90 0.00 0.00 621.38 1541.76 0.00 448.10 246.24 299.24 2101.00 1214.86 532.57 353.57
21 NE

21 SW
11 SE

DN
DN

17
10

00
94M
G+4 - RC

DN
109
4M
A.F HOSPITAL
M.O.D

S
DN
170
0
DN 2
50 D
I
ENTR
Y /EXIT
TO EXIST
ING
NIZWA
ROAD
(700M
28m R .O.W
LENGT
H)

0
DN 8

160

32m R .O.W
00

DN
28m R .O.W

28m R .O.W

AREA INSULATION
MOUNTAINOUS

DN 1094 MS
2

DN 1600
BUS STATION

00
A=30575.
L
NNE
TRA
A=31340.00

HA
DI C
5

WA
GOVERNMENT
MOUNTAINOUS AREA
INSULATION
A=436915.00
4 3
LAB
A=5 OR MAIN WATER TANK
648 CAM
1.00 PS A=151729.00

TRACK STATION

94 MS

00 MS
1
4-06-133-01-
JA
BA

DN 10
L

4-06-092-01-

DN 16
6
TER LINE
4-06-071-01-
MAIN WA

S
92 M
13

DN 9
4-06-123-01-

60 0
DN 1
4-06-122-01-

4-06-129-02-

2013/7396

DN 992 MS
4-06-079-01-
2014/5376

15
+
4-06-055-01-
4-06-047-01- 4-06-129-01-
4-06-061-01-

S
4-06-051-01-

DN 1600 M
D

4-06-079-01-
N
30

C
4-06-080-01-
0
D
I

2-
4-06-090-02-

BPS-1
DN 992 MS
DN1600

4-06-039-01-

002
2
4-06-083-02-

BID BID DN 1
500
WILAYAT
4-06-101-01-

DN 9 3
4-06-104-03-

92 M
S
DN 400/300/150/100DI

S
BIDBID
2M
99 00
TO L

DN 15
DN 6

D N
IZUQ
00/30

2014/7963
ESR
0DI

SUMAIL
GRID STATION
SUMAIL
GRID STATION SUMAIL
4-38-183-01-

GRID STATION

00
15 S
DN 2M
99
DN

BPS-2

0
150
DN MS
992
DN

5
7

2
4-38-137-01

2 MS

0
3 FARM
4-38-147-03-

DN 140
DN 99
*

2
4-38-063-01-037

5
4 3
SUMAIL

2015/2385
DN
30
0
DI
2
S
2M

00
99
14
DN
DN

87
002

/41
15
01-

20
51-
8-1

04
4-3

-01-0
-151
4-38

151-01-011

BPS-3

WILAYAT SAMAIL
S

2
4-38-146-02-
4M
89

00
14
DN

DN

4-38-008-02-000
165442
S
4M
89
DN

400
DN 1
DN 793 MS
DN 793 MS
S M

0
793

140
DN

DN
S
94 M
SAMAIL SUMMIT RESERVOIR

00
14
DN 1400

0
8

140
DN

DN

DN
1
WADI

344
2/4
201

2
4-14-098-02-000
1
4-14-079-01-
LINE
PIPE
MS
OL
PATR

J
L A
F A
894

0
140
DN

2
DN

3
4-14-066-03-000

5
J A B
A L

4 3

AJ
FAL

2012/6842

3
J

2015/193
2014/8448
2014/2677
A
B
A
L
4-14-009-01-
WILAYAT IZKI
3
4 MS

2013/6740

2017/259 2015/14/2677
400
9
DN 1
DN 8
WILAYAT NIZWA
WILAYAT IZKI

MS
894
47

0
3/47
201

120
DN

DN
DN 600 DI

DN
600
DI

DI
200
DN
WILAYAT NIZWA

DN
60
0D
I
DN 600 DI
DI
600
1

DN

WILAYAT NIZWA
WILAYAT IZKI
2

DN
I

30
DN 793 MS 0D

0
40 5

DI
NIZWA HOTEL

DN 1200 DN DN 4 3
MINISTRY OF
HERITAGE & CULTURE

DN 793
793 DN MS
DN MS 120
120 0
0
0
120
DN
-:

MS
NIZWA 793
1 MS

DN

DN
40
9

0D
DN 6

340
I

0
120
DN
MS
793
DN

S
M
0
90
DN

4
DN
DN

7 00
900

DN
80
0

DN 800

DN
300
/ 200
D I WILAYAT
MANAH
DN 400 DI
WILAYAT
DN
500
AL HAMRA
DI

DN 600 DI

DN 600 DI

I
0D
50
DN
1

DN 500 DI
2

5
5
4 3
DN 300
DI 4-03-139-06

DN 300 DI DN 400 DI
-000

00

DN 400
1-0
3-0
13
0 DI
DN 60

00

DN
500
DN 6

DN D
300 I
DI
DI
400
DN

WILAYAT NIZWA
DI

DN 70
400

0
DN

IR
VO
0 DI SER 25-01-
000 DN 70
0
4-03-2
20 RE
DN AT
URIY
Q DN
DI 700
WA
TO
area = 485860 SQ.M

area = 3633975 SQ.M

area = 213450 SQ.M


TO BIS

WILAYAT
DN 400
YA RES

BAHLA
DI
ERVOIR
21 NE

21 SW
11 SE

G+4 - RC

A.F HOSPITAL
M.O.D

550
WS-1 551
552
553
554
WS-4 555 556 557
579 558 559
560 561
562 563
578 564
WS-2
577
576
575

CB-2
574
573 572
WS-3 571 570
580 581 569 568 567
582 566 565
584 585
582 583 583 586 587
588 589
A A 590

P.S.1

131/C

ENTR
Y / EXIT
TO EXIS
TING
NIZW 28m R.O.W
A ROA
D (700M
131/C LENG
TH) 542
541

396 397 398 399 400 401 402 403 404

32m R .O.W
TRUCK /CAR PARKING
429 430 431 432 433 434 435

456 457 458 459 460 461 462 463 464 465
466
533

534

535
482 483 484 485 486 487 488 489 490 491 492 493
536
28m R .O.W
537 504 505 506 507 508 509 510 511 512 513 514 515 516

538

539

540 525 526 527 528 529 530 531 532

28m R .O.W

J A B A
L
C.WALL

N
INSULATIO
NOUS AREA
MOUNTAI
2014/6575

622500 E

WADI CHANNE
L
BUS STATION

.00
A=30575

WADI CHANNE
L
NNE

TRA

L
A=31340.00
A
I CH
WAD

GOVERNMENT
MOUNTAINOUS AREA
INSULATION
A=436915.00

LA
A= BOR
564 CA MAIN WATER TANK
81. MP A=151729.00
00 S
0072
A=2

TRACK STATION

L
B A
J A
J A
B
A
L

1
4-06-133-01-
JA
BA
L 4-06-037-01-39

4-06-092-01-

6
TE R LINE
4-06-071-01-
MAIN WA

13
4-06-140-01-

4-06-123-01-

2015/4592

4-06-052-01-
4-06-122-01-
64058
3
4-06-128-03-000

4-06-129-02-

02
8-L0 DI
2

2013/7396 Z0
4-06

300
DN
-128

4-06-079-01-
-02-

2014/5376
000

15
+
4-06-055-01-
4-06-047-01- 4-06-129-01-
4-06-061-01-

4-06-051-01-

4
4-06-128-04-000

4-06-079-01-

C
4-06-080-01-

BPS-1
2-
4-06-090-02-
2016/266
NEW BPS-1

4-06-039-02-000

4-06-155-01-000

2
4-06-144-02-000
E
0E
E
N N N

00
00
0 0 0

00
60 40 20

82
78

8
2 2 2
61 61 61

61
61
61
2 2 2

E
0
NEW MPS

40 8
61
EL. 47.0m

E 0
20
0E

8
61
00 8
61
N N

0E
N

E
00 00 0

00

80
24 22 00

76
12

7
1 1
26 26

61
61
26
E

E
00

00
84

82
61

61
26
11
80
0N

26
12
00
0N

22
83

H
SHARJA

BL
DG R O A D (15 m WIDE)

22 22
26
7 221
0E

82 22
2 711 62
0
R O A D (18 m WIDE)

80
0
84

N
61

22 22 22
R O A D (15 m WIDE)

22 70
81 73 63
R O A D (18 m WIDE)

L A N E 7m WIDE) L A N E 7m WIDE)
22 22
69 64
1-3 1-3
5-0 5-0
51- 51-
03 03
-53 -53
22
3
22
4 80 74
L A N E (5 m WIDE)

1/2
R O A D (18 m WIDE)

22
R O A D (15 m WIDE)

1/3
22 84
91 R O A D (15 m WIDE)
22 22 22 22
79 75 68 65

PARKING

R O A D (15 m WIDE) 22 22 22
PARKING 78 77 76 22 22
67 66

PARKING

R O A D (15 m WIDE)

1-3
5-0
51- PARKING
03
-53
5 R O A D (18 m WIDE)

PARKING
R O A D (15 m WIDE)
22
1/4
86
22 22
36 26 26 38
35 34
L A N E 5m WIDE)

R O A D (18 m WIDE)

EXTN.=213 sqm. EXTN.=112 sqm. EXTN.=101 sqm. EXTN.=138sqm.

SHARJAH
22
85
MA
S
R O A D (18 m WIDE)

JE
D
R O A D (18 m WIDE)

22
87
1-3
5-0
51-
03
-53
6

R O A D (15 m WIDE)
1/5

PARKING

PARKING

R O A D (15 m WIDE)

PARKING

PARKING

R O A D (15 m WIDE) O
P
E
N
PARKING
O E.P
P WOG
E IR -9
N E W O
E

FE E P
NCLL E
E N

O
P
E
N
R O A D (18 m WIDE)
E

E.
P
E

22
35
EL. 46.0m

EXTN
R O A D (18 m WIDE)

=566 EX
1 SQ
. M. T.
E

=1
70
MPS- existing

85
sq
.m
.
E
E
E

22 MAIN
34 PU
M
ST PIN
AT G
IO
N
CO
M
PL
EX
E

E.
P
ELEC

WATER LINE

E
EX
T.=
78
47
Sq
M O
O P
P E
E E N
N
W OG E.
P
IR -8
E W
FE E
NCLL
E
O
P
E
E
N
E
E E E
E E
E E
E E
GAS PIPELINE
GAS PIPELINE
WATERLINE

WATE
R PIP
E LIN
E - U/
G

272
2
29
63
242
1
GAS PIPELINE

28
GAS PIPELINE

51
ROAD

242
28 2

50
233 233
1
2
28 29
52 62
242
28 3

49
233 233
28 4 3
29
L A N E (5 m WIDE)
R O A D (15 m WIDE)

53 61

233
6 233
5
28 29
54 60

233
8

233
28
7
274
55 29
0
28 59
48
R R O A D (15 m WIDE)

L A N E (5 m WIDE)
O
A
D
(15

233
9
m

29
W

58
ID
E)

E)
L A N E (5 m WIDE)

ID
W
m
(5
272 E
4
28 N
A 234
L 0
47 29
L A N E (5 m WIDE) 57
L
A
N
E
(5

242
4
m

28
ROAD
W

46 29
ID

56
E)
L
A
N

242
5
E

28
(5

45
m
W
ID
E)

242
242 0
28
28 6 57
44

241
9
242
7
28 28
43 58
ROAD

241
8
242
8
28 28
42 59

241
6
241
28 28
L A N E (5 m WIDE) 5
241
61 62
7
28
60
242
28 9

41
ROAD
ROAD

ROAD ROAD PARKING

243
28 0

40

241
241 0
241 2
4 28 28 28
28 65 64 63
ROAD

66
243
28 1

39

243
2
241 240
3 241 9
28
1
38 28 28 28
67 68 69
ROAD

243
28 3

37
ROAD ROAD
ROAD

243
28 4

239
ROAD

7
36 28
239
9
75 28 28
74 73
L A N E (5 m WIDE)

239
6
243
5
28 28
ROAD

35 76

239
28 8 28
78 79
239
5
243
6
28 28
34 77
ROAD

243
28 7

33

243
8
238
239
28 9
239 1
3
32 28 28 28
90 89 88
ROAD

243
28 9

31

239 239
4 239 0
28 2 28
28 92 93
91
244
ROAD

0
28
30

ROAD

272
5
28
29
175
1
174
174 4
175 6
26
174
26
0
42 26 26 8
26 46
43 44 45

175
2

26
41

174
174 5
9
174
26 26
7
26 26
175
51 52
3 49 50
26
40

177
7
175 177
4 8
25 25
73 74 26
39

177
175 6
5
25 25
72 75

180
26 2
175 177
6 5
25 25 15
71 76

177
4
175
25 7
25
70 77

180
5
25
175 177
8 3
25 91
25 78
69

177
2
175
9
25
180
25
6
68 79 25
90

177
1 180
176 7
25
0
25 80 25
67 89

177 180
0 8
176
25 1
25 25
66 81 88

180
9

25
176
87
2 176
25 9
25 82
65

25
86
176
176 8
3
25 25
64 83

25
85

25
63 25
84

183
6
183
183 7
5
25 25 25
183
4
25 61 60 59
62
GAS PIPELINE
GAS PIPELINE

GAS PIPELINE
Asph
alt Ro
ad

PARK
ING

Asph
alt Ro
ad

PARK
IN G

PARK
ING
G
IN
K
R
A
P D
A
AD O
RO R
T
AL
PH
AS

OPE
D

SL
A
O
R
G
IN
K
R
A
P

3071
E)
ID
W
m
(5
E
3070

N
E)
D G

A
ID
A
O IN

L
W
R K

m
R
A

(5
P

E
N
3069

A
L
NS
TIO
VA
ER
P.L ES
.R
50m

P.L

P.L

P.L

P.L
R

P
O

A
A

R
D

K
IN
G
P
A
OPE

R
SL

O
K

A
E)

P
IN
ID

A
W

R
G
m

K
(5
E

IN
N

G
A
L
330
2

EX
TN
=12
4
E)
ID

SQ
W
m

.M
.
(5
E
N
A
L
3072
OPEN

EX
E)

T.
ID
W

A
m

P
(5

A
E

R
N

IN
A

K
L

IN
G

L
3073
PE

A
XT
O

.=

N
BLDG
SL

E
61
7

(3
m
SQ
.M

W
E

ID
BL

E)
CA

D
R

A
O
O

S/S R PE
A

O
D

SL
P
A
R
K
P

IN

3074
A

G
R

E E)
K

ID

P.L
OPEN W
R

OP
IN

SL m
O
P

.5
G

(3
A

E
D
R

PE N
K

LO A
S/S S L
IN

3075
30
G

S
S/96
R

E)
P

ID
O

W
A
A

m
R

0
D

P.L
(1
K

E
N
IN

A
G

3102 L
3076
P

OPEN
A

E)
ID
R

W
R
K

E) m
O

ID (5
IN

W E
m
G

N
(5 A
E L
P.L

N 3077
LA
R

OPEN
O

3101 E)
ID
P
A

OPEN W
A
D

E) m
R

ID (5
K

W E
m N
IN

(5 A
P

OP L
E
G

A
P

EN N
R
A

3078
LA
K
R

P
K

OPEN
E)
P.L
A

IN

3100
ID
R
IN

W
R
K

m
G

E)
O

ID (5
IN

W E
A

m N
G

(5 A
SL

E L
R

N
OP
O

A 3079
P

L
A
A

E)
R

3099
ID
K

W
L

E) m
R

31
IN

ID
A

39
P

(5
O

P.L
G

W E
A

OPEN
A

m N E
E
R
D

OP (5 A OP
K

L
(5

E
P

SL

EN SL
N
m
A

IN

A
OP

3080
L
R

W
E
G
K

ID

G 3098
E)

IN
IN

K
R

OPEN
G

R E) E
O

A D ID
A W
A

P
3095 OP D
O m A
D

R (5 SL
O
E R
N E
A OP
L
3097 SL
3094
P.L

E
OP E)
SL ID OP
W EN
m
(5
E
N
A
P

L
A
R

3093
K

3084
RPU
IN

E)
ID OP
G

W EN
P.L

E) m
ID (5
W E
m N
(5 A
E L
N
A 3092
L
P

E)
3145
A

ID OP
R

E) W EN
K
G

m
G

ID
R

W (5
IN

m E
N
A
G

(5 A OP
D

E L EN
N 3088 E 3081
A 3091 E) OP
L ID
OPEN
W SL PETR
3146 E) m OL
ID (5
E) W E
STAT
ID m N ION
W (5 A
m E L
(5 N
E A 3087
N L
P.L
G

A OPEN
G

E)
W

L ID
P

W
A

3147 m
R

3090
(5
K

E
50
OG

E)
R

N
C

P
m

ID
.

IN

A
R

W
O

E) L
G

m
R

PIP

R
R
RE

ID (5
OO

A
EL

W
3086
SE

E
A

m
A

R
IN

N
IN
AD

RV
E

(5 A
D

E L E)
G

E ID
AT

N
IN

A OP W
IO

3148 E 30
D

m
G

L
N

OP SL S/89
S (5
P.L S

L
A

E
G

3160 ES)
G

PE
R

N
W

ID O A
K

E) W SL L
m
IN

ID D
P

W (5 3085
A
G

E
A

m O
R

N
R

(5 A E) R
O

E LE
K

ID
3149
P.L
A

N OP E) W
A ID
D

IN

L SL RPU
W m
G

m (5
3159
(5 E
PE N E
LO E A OP
N L
R

ES)
P

ID A SL FRO
L
O
A

W
M SQ
A
R

m U
G

3150
G

D
K

(5
W

E E
IN
P

OP N E)
A
A

SL ID
P.L

L W OP
R

31 m EN
K

D
3157
S/ 58 S E (5 A
E
IN

OP N O
SL E) R
G

A
3082
ID
P

W L
A

m
R

3151
R

(5
O

E
E)
A

N
R

ID
P

A
IN
D

L W
O
A

m
A
R
G

3156
(5
G

D
K

E
W

OPEN
E) N
IN

A
R

ID
P

L
G

W
O

m P.L
A

30
R

3152
(5 S/ 83
S
D

E
N E)
R

IN

A ID
O

L W
G
A

3155 m
D

(5
E E E
N
P

OP E) A OP
A

SL ID L
P

W SL
R
A

m
K

3153
G

R
G

(5 P.L
P
K

E
W

IN
R

N
A
G
O

A
IN

L
A

E
G

K
D

OP E
A

3154
IN

SL OP
D

SL D
E A P.L
O
OP R
3163 SL

E
OP
G
G

SL
W

.M ROA
D P.L
SQ
5
36
T.=
EX

JABA
L
G
G

L
A
B
A
J
G
G

W
G
G

W
G
G

W
W

EXTN
=106
.135
SQ .M.
W W

R.O.
P

3169
W W
W
W
W
W
W
W
W
W
W

PA
RK
IN
PA G
RK
PE

IN
G
SLO
W
W

EX
PR
ES
S
RO
AD
W

EX
PR
ES
S
RO
AD
W

SE
RV
IC
E
RO
AD
W

1-35-
067-0
1-293

1-35-
067-0
1-294
OPEN
W

OPEN

PA
RK
IN
G
W

PARK
ING
W

1-35-
067-0
2-100
W
W
W
W

1-35-0
67-01-
141
W

1-35-
067-0
2-049

AD
RO
JA
BA
L
AD
RO

ROAD
(60 m WID
E)

CULVERT

ERT
CULV
W

1-35-
067-0
2-048
1-35-
057-0
1-100
ROAD
(60 m WI
W

DE)

OP
W

EN
W

W
W
W
W

W
T

W
ER
LV

W
CU

W
R
O
A
D W
(6
0
E)

m
ID

W
W
W

ID
m

E)
0
(4
D

W
A
O
R

B.L
1-35-
M

067-0
1-223
.= W
.5

1-35- 8
067-0 M
1-036
B.L

W
E RT
LV

W
CU

B.L
M

B.L .=
L 8
.5

A M W E-
M

.5
N M
LI
B.L
NE

E
.5

(4 1-35-
067-0
NE
LI

.4 1-222
B.L

0
E-

m
M

.W W
.5

ID
B.L

E) E-
LI
NE R W
O
B.L A
.5 D
M S.
M

1-35-
067-0
S E- W
1-225
B.L L
.5

.5 IN
M

B.L

M E
.5

1-35-
067-0
B.L
1-221
B.L
W

.=
8
M
W

1-35-
067-0
1-234

B.L
W

.=
8 1-35-
M 067-0
1-219

B.L
OPE
N
M

.5
.5

M
W

L
A
B.L
.5

B.L
1-35-
N
067-0 E
1-031
.5
B.L

(4 M
m
.W B.L
ID .=
E)
M

8
M
.5
W

1-35-
M

067-0
1-028
B.L
.5

1-35-
RO

067-0
1-220
B.L
A

B.L
M
D

.5
M
.5
M

1-35-
057-0
W

B.L

1-35- 1-029
.5

B.L
067-0
1-022 .=
B.L

8
EL M
EC
R T-
LIN L
A
O
W

N
B.L
M

A E E .5
(4
.5

B.L

D .4 M
(4 0
B.L . 5M

0 m
m .W
W ID
E)
ID
E)
D I
W A

W
W

R
O W
A
D
B.L. =8 W
M 8
7-02-03
1-35-06

9
7-02-03
1-35-06

B.L
.=
W

8M

B.L. 5M
B.L. 5M
W
LANE
(4.40 m.
WIDE)

W
B.L. 5M

B.L. 5M
8
7-01-23
1-35-06

W
OPEN

ING

B.L. 5M
W

PARK
W W
W W
W
W
W
W W
W

057
67-02-
1-35-0

OPEN

N
OPE

1
7-02-61
1-35-06

N N
OPE OPE
52
MU38
DE
PR

N
OPE
ES
SIO
N
DE
PR
ES
SIO
N

PARKING

209
67-01-
1-35-0 N
SIO
ES
PR
DE
E

L A N E (5 m WIDE)
ROAD

N
SIO
ES
PR
DE
E

ROAD

ROAD
R O A D (40 m. WIDE)

0
7-01-21
1-35-06
1 2
7-01-21 7-01-00
1-35-06 1-35-06
003
67-01-
1-35-0
4 1
7-01-00 7-01-00
1-35-06 1-35-06

L
J A B A

DMP'S
G
KIN
PAR

G
I N
R K

0
7-01-00
1-35-05
P A

000
57-01-
1-35-0
LINE
PDO PIPE
NE LI
PDO PIPE

POINT
CONNECTION
AD
AD

RO
RO

IN
IN

MA

ENTRY
MA
ICE ROAD
PROP. SERV
ROAD

249
57-01-
1-35-0
PROP. SERVICE

3
7-01-29
1-35-05

FARM

9
7-01-28
1-35-05
MAIN ROAD
MAIN ROAD

5
7-01-29
1-35-05 254
57-01-
1-35-0

GARDEN

0
7-01-00
1-35-05
T

EN
GARD
T

000
57-01-
1-35-0
T
T

D
ROA

ROA
T

MAIN

MAIN
T

N
OPE
T

0
9-01-76
1-35-05

278
57-01-
1-35-0

407
58-01-
1-35-0

FARM
D OA
N R
MAI
OP
EN

TRACK
TRA
CK
OAD
AD

N R
RO

TRA
CK
IN

MA
MA

1-35
-059
-01-3
30
W
W

TRA
CK
W
W

W.P
W
W
W

OP
EN

W.P
W
W

1-35-
059-0
1-743
W

1-35-
059-0
1-652
WADI

OPEN
OP
EN
W

OP
EN
1-35-
059-0
1-762 W.P
1-35
-059
-01-8
1-35- 21
058-0
1-35- 1-465
058-0
1-35- 1-480
058-0
1-293
W

AD
OPE
N WE RO
LL W

W
1-35
-059
1-35- -01-7
W

059-0 04
OP 1-004
EN OP W
EN
W.P

W
W
1-35-
059-0
1-743

W
1-35-
059-0
1-652
WADI

OP
EN OP
EN

W
OP
EN
1-35-
059-0
1-762
W.P
1-35-
059-0
1-821
1-35-
058-0
1-35 1-465
-058
-01-4
1-35 80
-058
-01-2

W
93 OP
EN AD
WE RO
LL W

W
1-35-
059-0
1-35-

W
059-0 1-704
OP 1-004

EN OP W
EN
1-35
-059
-01-7
06
BLDG

W
BLDG
W.P
1-35
NE
-059 LA
OP -01-7
24

W
EN

1-35-
059-0
1-707
MO
W

1-35-
059-0 OP
SQ OP
1-708 EN EN

1-35- 1-35
059-0 -059
1-35 1-761 -01-7
-059 09 W
-01-4
1-35
W

1-35 -058 48
-059 -01-4 DE)
-01-0
00 40 M WI
W (16
AD
1-35- RO
059-0
1-35 1-710
-058 W
-01-1
71
W

OPE
N
1-35
-059
-01-1
98
OPEN
FEN
CE
W

BLDG
M.H

1-35-
059-0
1-646
W

1-35- 1-35-
059-0
OPEN
059-0
G

1-753 1-35- 1-35- 1-718


059-0 057-0
A

1-35- 1-725 1-164


057-0
1-034
S
LI
N

BLDG
W

OPEN
1-35-
059-0
1-555
W

1-35-
059-0
1-523
W.P

OP
EN
1-35-
059-0
1-35 1-521
-058
OPEN
-01-5
23
W
AD

1-35
-058
-01-4
AD

OPEN 23
RO

OPEN
E
RO

W
IN

TRACK
AD

1-35
-058 1-35-
IDG

-01-5 059-0
01 1-756
IN
RO

1-35
-059
BR

-01-2
319
MA

OPEN
1-35-
058-0
1-451
MA

OP
W

EN
1-35-
BLDG
058-0
1-517 W.P
OP
EN
WEL
OP L
EN
D

FARM
A

1-35-
059-0
O

EXT.
W

1-648
1-35-
R

058-0
1-433
BLD
1-35- G
058-0 BLD
1-432 G W.P
1-35-
059-0
OPEN 1-243

BLD
OPEN G
W

1-35-
059-0
1-000 1-35-
059-0
1-000

1-35-
1-35- 059-0
058-0 1-244
OPE 1-375
W

N 1-35-
059-0
1-539

OPEN FARM
W

OP
EN

1-35-
059-0
1-000
W

OP 1-35-
EN 059-0
1-35- 1-224
058-0 4
1-436
F
A
L
W-LINE

A
J
AD

W.P
RO

1-35-
059-0
1-35- 1-425
058-0
1-454

BLDG OP
EN

JA
BA
L
1-35-
059-0
1-35- 1-000
058-0
1-396

C.WA
LL

1-35
-059
-01-3
37

OPEN

1-35-
059-0 EX
1-336 T.
OAD
W
A

E R

1-35-
D

OPEN
059-0
1-360
I

VIC

BLDG
SER

1-35
-059
1-35 -01-6
-058 77
-01-1
02

C.W 1-35-
AL 059-0
BLDG L 1-361
WADI

BLDG
MAJLIS

OP
EN

1-35
-059
1-35- -01-2
058-0 18
1-203

BLDG
AD
RO

1-35-
1-35- 059-01-219 1-35-
058-0 059-0
1-246 1-000
1-35-
059-0
1-000
D

BLDG
D
A

A
D

ROA
D
OA
E RO

N RO

EX
N R

T.
VIC

=
MAI

73
1-35 SQ
-059
-01-2 .M
21
MAI

.
1-35
SER

-059 1-35
-01-2 -059
300 -01-2
22
SERV

EXT
.= 267
C.WA SQ.
M.
MA 1-35-
LL
059-0
1-220
SJID
TELE-LINE

ICE R
ELEC-LINE

BLDG
OAD

SHOP
S
50 m.

BLD
G OP
PARK

EN
ING

WEL
1-35 L
-059
-01-2
12
SHOPS

1-35-
059-0
1-35- 1-223
059-0
1-35- 1-679 S/S
058-0
1-197
1-35-
059-0
PETR 1-000
OL
STAT
ION C.W
AL L
BLDG
BL DG
50 m.
1-35- 1-35
059-0 -058
1-224 -01-4
K

04
AC

1-35
-059
BLDG -01-0
00
TR

C.W
1-35
ALL
-058
-01-4
03

BLDG

GRA
OP VEYA
EN
RD
1-35-
059-0
1-225
COMMER

1-35-
059-0
1-219
7
C

C.W
1-35
AL
-059
-01-7
BLDG L
1-35- 95
058-0
1-370

1-35-
059-0
1-355
WA

EXT.=
DI

1-35-
059-0
1-356
75 SQ

OP
EN
. M.

1-35
-059
-01-2
IAL BLDG

26
MAIN ROAD
MAIN ROAD

GA
SERVICE ROAD

R FA 1-35-
059-0
W.F RM 1-35- 1-239
1-35- 059-0
059-0 1-227
1-35-
SHO AGE ENCE
P 058-0 1-755
S 1-227

1-35-
BLDG
059-0
1-000

BLDG

OPEN
FENC
E
BLDG
1-35- 1-35
059-0 -059
1-229 -01-4
63
JA

1-35
BA

-059
-01-4
L

47
BLDG FENC
1-35- E
059-0 1-35-
1-35
-058 1-230 059-0
-01-2 1-240
62

BLDG
PARKING

BLDG
ROAD OPEN

1-35 OP
-059
SERVICE ROAD

-01-2 EN
31
1-35
1-35- -059
059-0 -01-0
1-254 00
BLDG
1-35-
059-0
1-232
R.O.W

OPEN
1-35-
AL
059-0 JAB
BLDG 1-233

L A N E (3 M. WIDE) 1-35-
059-0
1-446
COMMERCIAL BLDGS

1-35- BLDG
059-0
1-35- 1-326 1-35
059-0 -059
ROAD

1-226 1-35- -01-2


1-35- 059-0 34 W.FE
L

058-0 1-788 NC
1-361 E
A

OPEN
B

C.WA
A

LL
J

50 m. LANE
1-35
-059
RO
1-35- -01-2
1-35- 058-0 35
1-385
AD
059-0
1-789
1-35-
059-0
1-215
CO
MM C.WA
ERCI
AL LL
1-35
BLDG BLDG
S -059
FARM GA -01-6
50 J A
ROAD

RAGE
IDE)
B A
W L
m
(3
NE 1-35
BLDG
LA -059
-01-3
97

1-35
-059
-01-6
66
EXT.=

1-35
-059
1-35 -01-2
PARKING

-058 36
143

-01-3
60
SQ

1-35-
JA
059-0 BA
1-216 L
. M.

1-35-
059-0
L

1-35-
058-0 1-237
1-45
A
B

BLDG
J A

N G J A
R KI B A
PA L

1-35-
059-0
1-651
AD
RO G.S
1-35- .M
059-0
1-258

OPEN
PARKI

ROAD
NG

1-35-
059-0
1-35- 1-238
1-35- 058-0
059-0 1-399
1-35- 1-342
059-0
1-341
2M BLDG
LINE
2M BLDG LINE

LINE
LINE 2M BLDG
2M BLDG

ING
PARK

ROAD

PARKING
PARK

PARK

1-35-
059-0
ROAD

1-345
ING

PARK
ING

ROAD
ING

PARKING
MAIN
ROAD
PA
RK

RO
IN
G

AD

2M
1-35-059-01-
342

BLDG
2M BLDG
LIN
E
LIN E
E
LIN
BLDG
2M
E
LIN
BLDG
2M G
IN
RK
PA
AD
RO

ING
PARK

PA
RK

PA
RO
IN
G

RK
AD

IN
1-35-059-01
-345

PA

RO
RK
IN

AD
G
MA
ING

SE
I
PARK

RV
D

N R
IC
PETROL
R OA STATION

NTRE
CE

O
ATM

E R

RO
O
1-35-059-01-
347

AD
AD
AD
PETROL
STATION

PA
RK

10M
E
BLD
G LIN
IN

BLD
G LIN
5M
E
G

E
G LIN
BLD
5M

1-35-059-01-
362

OPEN

JABAL

JABAL
JAB
AL

PR
OPO
SED
R OAD

PR
OPO
SED
RO
AD

OPEN
BLDG

BLDG

WELL

BLDG

1-35-059-01
-1300
1-35-058-01-
478
OPEN

BLDG

ROA
D
ROAD

1-35-059-01-
420

MASJID

PARKI
NG
AD
RO

D
A
P.D.O. PIPELINE

D
A

N RO
N RO

MAI

PR
MAI

OP.
RO
AD
AD
.RO

1-35-059-01-
391
PROP

M
20
AD

FARM
RO

1-35-059-01-
392
PRO
P. R
O

FARM
BLDG
AD

AS

D
AD
PH

N
LA
RO
AD

H
AL

IN
RO
T

EG
MA
IN

HI
MA
RO
AD

E
LIN
R
TE
PR

WA
OP
.R
O

AS
AD

D I
PH
AL
T
R
O

W A
AD

WELL
LINE
WATER
I
D
A
W

WELL
R LIN
TE
WA

L
AL
C.W

C.W
ALL

I
D
A
W
MAIN ROAD
MAIN ROAD

1-35-0
59-01
-000
W

B.L.= 5 M.
W

1-35-0
1-35-0 59-01-
T

59-01- 390
807
OP
EN
W
AD
O

T
K R

.= 10 M.

AL M
OPE A
AC

N
B.L
W

PET HA
1-35-0
59-01-
R 000
TR

STA OL
T

TION
W

BLDG
T
W

B.L.= 10
M. C.W
B.L.= 5 M. ALL
B.L.= 10
W

M.

EXT.=115
2 SQ.M.
T
W

1-35-0
59-01
-1299
T
W

D
D

MAS
JABA JED
L
OA
OA

OP
W

EN
EXT.=23
T

4 SQ.M.
N R
N R
W

MAI
MAI
T

1-35-0
W

59-01
1-35-0 -895
58-01-
438
EXT.=146 SQ.M.
W

L
T

C.W
ALL
JABA
W

BLDG
T
W
W

T
W

T
W

T
W
W

T
W

T
W
W
W

D
D
W

ROA
ROA

MAIN
MAIN

MAIN ROAD

MAIN ROAD
MAIN ROAD

MAIN ROAD

RO
A D (15
m.
WIDE)
RO
A

AD
A= 1

(15 m.
=6

WID
0000

E)
4

A= 1 .0 0
OP
0000
EN
58

.00
HIL
LS
.00

PROP
.
SERV

HIL
ICE

MA LS
R

RO
IN

MA
OA

IN

AD
D

RO

RO
AD

(15 m.
AD

HIL
LS

WIDE
)
HIL
LS
PROP
.

GIS-
SERV
ICE

TELE
RO

LINE
AD

1-35-0
59-01-
2268

OP
C.W EN
AL L
RO
AD

BLDG
(15

BLDG
m. WI
DE)

JAB
AL
LA
NE
(5 m
WID
E)
RO

AD
. RO
A D (15

PROP
m. WID
E)
R O A D (15
m. WIDE)

E)
WID
(20 m.

LAN
E (5
m WID
E)
AD
RO
R O A D (15 m. WIDE)

RO
A D (15
m. WID
E)
E)
WID
D(20 m.

LAN
JAB
E (5 AL
m WID
OA

E)
R

1-35-0
59-01
-2313

1-35-0
59-01
-2312
E)
WID
(15 m.
AD

RO
RO

AD
(15 m.
WID S/S
E)

1-35-0
59-01
-468

1-35-0
59-01-
469

LAN
E (5
m WID
E)
E)

LAN
1-35-0 E (5
59-01- m WID
471
E)
m. WID

1-35-0
59-01
-472
A D (15
RO

JAB
AL

JAB
AL

1-35-0
59-01-
2227
C.W
ALL
FARM
MAIN

MAIN

1-35-0
59-01-
2228
AD
ROAD

ROAD

RO

BLDG
1-35-0
59-01-
2229

JAB
1-35-0
59-01-
AL
2326
AD

1-35-0
59-01
RO

-2327

JAB
AL
JAB
AL

1-35-0
59-01
-000

1-35-0
59-01
-760
WAT
ER
LINE
1-35-059-0
1-760
WA
TE
RL
INE

89.8735
TE

AD
LE PH
ON
E LIN
E

MAIN RO
E
IN
EL
ON
PH
LE
TE

OPEN

1-35-059-
01-964

1-35-059-01
-963

1-35-059-01
-962

1-35-059-01
-961

1-35-059-0
1-984
ROA
D

1-35-059-01 1-35-059-0
-983 1-944

1-35-059-01
-982
R
O
A
D

L
(1

1-35-059-01
5

-931
N
m.

E
W

(3
ID

1-35-059-01
E)

-981
.W
ID
E)

1-35-059-01 1-35-059-01
-932 -930

1-35-059-01
-929 1-35-059-0
1-927
R

1-35-059-01
-926
O
A

1-35-059-01
-928
D
(2
0

1-35-059-01
-980
m.
W
ID
E)

1-35-059-01
-925

1-35-059-0
1-1298

J A
B A
L J A
B A
L
E
N
A
1-35-059-01 L
-478 1-35-059-0
1-924
RO
AD
1-35-059-01
-921
ROAD

1-35-059-0 1-35-059-01
1-480 -482
1-35-059-0
1-481
J A
B A
L 1-35-059-01
1-35-059-01 -916
-479
OPEN
R
O
A
D(2

1-35-059-01
0

-915
m
W

OPEN
ID
E)

R O A D (15 m WIDE)
1-35-059-01
-483

1-35-059-01
-914

1-35-059-01 1-35-059-01
-515 -516

OPEN
ROAD

OAD

1-35-059-01
-913
L A N E (3 m WIDE)
R
O

1-35-059-01 1-35-059-01
1-35-059-01 -484
A

-513 -514
D

OPEN
ROAD

1-35-059-01
-912
L A N E (5

R O A D (15 m WIDE)

1-35-059-01
OPEN
-511 1-35-059-01 1-35-059-0
1-485
m WIDE)

-512

E
N
A
L
MAIN R

OPEN

1-35-059-01 1-35-059-01
-509 1-35-059-01 -486
-510

OPEN

1-35-059-01
-487
1-35-059-01
-507 1-35-059-01
-508
ROAD
L A N E (3 m WIDE)
R O A D (15 m WIDE)

1-35-059-0
1-488

1-35-059-01 1-35-059-01
-505 -506
ROAD

ROAD

1-35-059-01
-489

7 SQ.M. 1-35-059-01
-503 1-35-059-0
1-504
EXT.=975
ROAD
T-LINE
LANE

1-35-059-01
-490

CEMENTAT
ION CO.
1-35-059-01
-501 1-35-059-01
-502 BLDGS
PROP. R O A D

1-35-059-01
L A N E (3 m WIDE)

-491

wide)
(10 m.
LANE R O A D (15 m WIDE)
1-35-059-0
1-492

1-35-059-01
OPEN
1-35-059-01 -498
-500
1-35-059-01
ROAD

-499
ROAD

PARKIN
G

1-35-059-01
1-35-059-01 -494
-493

1-35-059-0
1-497

R O A D (10 m WIDE)

1-35-059-01
-496

1-35-059-0
1-495
R O A D (15 m WIDE)

CEMENTAT
ION CO.
OP BLDGS
EN

OPEN
ROAD

e)
(7 m. wid
LANE
BL-5M
ROAD

BL-5M

W
MAIN ROAD
MAIN ROAD

BL-5M
W
J A B A L

1-35-059-01
-768
ROAD 1-35-059-01
-2157

W
W

OPEN
W
A

MOSQ C.WALL
D

W
I

1-35-059-01
-

1-35-058-01
-237
W
R
O
A
D
BL-5M
W

J A B A L
1-35-059-01
-768
1-35-059-0
ROAD 1-2157

W
W

OPEN
W
A

MOSQ C.WALL
D

W
I

1-35-059-0
1-

1-35-058-01
-237
W

W
R
O
A
D

PROP.
FARM
W

PUBLIC
PARK W
D
A

FARM
BLDG
O
R

1-35-059-01
-897 W
1-35-059-01
-2261

ROOM

1-35-059-01
-2262
W

PR
BLDG

OP
W

1-35-059-0
1-2253

OS
ED
1-35-059-0
1-2260

RO
W

AD
OPEN
W

1-35-059-01
-2254

1-35-059-0
1-2259
W

1-35-059-0
1-2263

BLDG
W
AD

1-35-059-0 1-35-059-0
1-2255 1-2258
RO

BLDG
W

1-35-059-0
ROOM
1-2257

1-35-059-01
-2256
W
AD
RO

ROAD
W

ROAD
W

OPEN
W

1-35-059-01
-748

1-35-059-01
-312
ROAD

PROP R

OPEN
R
O
MAIN ROAD

OAD

A
D

JABAL

JABA
L
JABAL
WATERLINE

JABA
L
NORSS LINE

R/C
R
O
A
D

1-35-059-0
1-1392
MA
IN

MA
IN
S

RO
H
A

AD

RO
R

AD
JA
H

D
A
1-35-059-01 O
-2296 R
PR
O P .S
NO
RS
ER
S
VI

LIN
E
CE
RO
AD
ROAD

BLDG
AD
RO

D
ROA
G
PARKIN
LANE

RPU
MASJID
(5 m WIDE
)

ROAD

1-35-059-01
-687

1-35-059-01
-260

1-35-059-01
-261
1-35-059-01
-262

OPEN

LANE
(5 m WIDE
)

ROAD
(20 M. WIDE
)
E)

1-35-059-01
-265
1-35-059-01
-266

1-35-059-01
-267
(15 m WID

LANE
ROAD

(3 m WIDE)

ROAD
(15 M. WIDE
)

1-35-059-0
1-290
290
1-35-059-01-

507
1-35-056-01-

FARM
OPEN
6
1-35-056-01-50
AD

482
1-35-058-01-
RO
IN
MA

OPEN
EX
T .=
.5
6

M.
.

B.L 47

458
1-35-059-01-
. 12
SQ
M .M.

B.L
M.

8
.5
E)

B.L 1-35-059-01-53
ID

B.L

.5
W

LA
532 N M.
M.

1-35-059-01- E 2+400
(7

(6.5
E

0M
N

.W
ID
LA

E)
2+300 1-35-059-01-
533
7
1-35-059-01-53

4
1-35-059-01-53

00 1-35-059-01-
536
2+2
E)
ID
W
M.
(6
E
N
LA

5
1-35-059-01-53

0
10
2+
E
ELIN
. PIP
P.D.O
00
2+0

M
M
4-
0 6 - 0 55 - 0 1 -
- 0 55 - 0 1 -
15
4-06

E
BL
CA
FO
FO CABLE
FO CABLE

FO CABLE

FO CABLE
FO CABLE

FO CABLE FO CABLE
MUSCAT

FO CABLE
FO CABLE
2013/3046

FO CABLE

FO CABLE
FO CABLE

ON
TI

S L
EC E
OT OP
PR

OF
INTERFACEOF
INTERFACE
INTERFACE OF PROJECTS
INTERFACEOF
OF PROJECTS
INTERFACE
PROJECTS
PROJECTS PROJECTS

FO CABLE

FO CABLE

IC TYPE-3
OF PROJECTS
OF
INTERFACEOF
INTERFACE
INTERFACE PROJECTS
PROJECTS OF PROJECTS
INTERFACEOF
INTERFACE PROJECTS
INTERFACE OF PROJECTS
Prop S/S for Distribution TX.

2595000 N
L11
L12
TL2

TL3
L10
L9

LP C3
R
PLAT ING
BEND
PAT
E
L8
AL M
FILL ION
STA

INTER FACE
INTER FACEEOF
INTERFAC OF PROJ
PROJE ECTS
S CTS
ING

INTERFACE
OF PROJECT
INTERFACEOF
AHA

PROJECTS
OF PROJECTS
T

LIM
IT O
FW
OR
K
S
JECT S
OFOEC PRJO
CO
JCETCST
TSE
FAAC CEFF
OFF
PPRJERTSO
ERC EECEEO
PR OJ
INTR RC
O
O PR
RFACE
OF PRO
JECTS
INAINA
FA INTINETR
TREF F
TE TE RF
INTE
INTINE
EFR
INA
F
TE C
INA
RF
TEC E
RF
AC
E O
ACEE
INTERFA
OOF
O S
PROJECT FPRPRPOJP
OFF CE OF
OJ
RR
EC
ECO
TS
JEJCETC
TS
STS
ETC
JEJC STS
FPRPPRROO
TS
OFF
EC
C CEEEO
O OJ
FACEOF
PR OJECTS
ECTS
ETREFRINA
TEA
OF PROJ
CE
F RF AC INTER
FA
INTER
INTIN
25
2010/1493

RFACE O INTE
INTE
INTE
RFA
RF CFAEECEFO
INTER
AC O
PROJECT
OFF
FPRPR
POJR
S INTERFINTERF
ACE ACEOF
OF PROJE
PRO CTSJEC

IC TYPE-3
OO
EC JEJE
TS CTC
STS TS
KK
WOO K
OOF WOR
RR

FO CABLE
W

ILMIM OF IT
T

LIM
I T
I
L
4-06
-
125
-01-
2016
/92
50
NIZWA

IN TER
INTIN FACE
E R
T EF
RINA
O F P ROJE
F C
TEACE
INTE
RF EEO
AC O CTS
FPRPP
RFINTE
OFF
AC ECEOF
RFA
ORRO PR
OF PRO
JE O
CT
JECOJ
JSEJCTSECTS
ETCSTS
259
5
000
Prop

N
S/S
fo
r Dis
tribu
tion
X. T
L8 TL3
L12
L9 L10
C3 L11
EXISTING
LPR
TL2
PAT
BENDING
PLATE
+
0
/523
2015
14
6-77
03-201
2478
887.11
Y=2594
89.31
X=6178
/5675
2015
14
4-06-148-01-000
2015/5675
50
G
KIN
PAR
2016/6281
7+00
0
7+1
00
7+
20
0
7+300
2012
/31 0
201
6/34
58 50
2016
/5858
(
+
)
50
50 50
50
50
2016
/8379

13
113
-2
01
3-
68
4-0

66
6-1 2 9 -02-
2
/616
12
20
50

/988
16
20
50

9
/837
16
20

13113-2013-6866

8
/160
14
20
LANE

LANE

LANE

10
20 60
26
50
50

6
/872
16
7-20
30
25
23
/22
14
20
352MM
CABLE
HT U/G
PROP.

-0
PROP.4CX185SQ.MM
CABLE 45M

06
4-
50

50
50
W
LO

14016

50 -
-01
-0 60
6
4-0
5
/381
2015

338339
89-1
2016/55

20
35 16/462
64 5
13
630
201 1739

48 21
6/4 9

13383 91
5592-
2016/ 8-13
15
87
0

20
16
/485
9-13
35
05
8

201
6/5
355
4-
-13
396
88-
811
54
06
-0
45
20
03
20 20
12 13 37
/4
-0 /8 -2
01
3/
67 13
5 5 81
35
1-
41
51
0

20
14
/2
00
6

20
16
/1
59
8
50

2014/3417

20
13
/8
97
4
50
0E
00
4
61

50
INTERCONNECTION

50

50

50

50 50

614
200

2012/745
50

NEW BPS-1
4-06-092-01-
2

4-06-096-01-
6
4-06-071-01-
2016/3841

13
16 4-06-140-01-
4-06-152-01-

4-06-052-01-

4-06-129-02-

2013/7396 -

2013/7396

4-06-047-01- 4-06-129-01-
4-06-061-01-

4-06-051-01-

at point X=613076.659 Y=2594993.442

C
4-06-080-01-

BPS-1
2-
4-06-090-02-
2016/266

NEW BPS-1
BPS-1

4-06-039-02-000

4-06-155-01-000
2
4-06-144-02-000

4-06-095-01-00

4-06-039-01-

002
2
4-06-083-02-

BID BID 2015/2942


4-06-003-03-

4-06-101-01-
3
4-06-104-03-

4
4-06-104-04-000

000
25+
km
PROPOSED
BIDBID
RESERVOIR

1
4-06-104-01 -

2014/5361

000
26+
km

000
27+

2014/7963
km

000
28+
km

SUMAIL 000
29+
km

GRID STATION SUMAIL


4-38-183-01-

GRID STATION

4-38-031-

BPS-2

8
9
4-38-159-0 9-
4
4-38-159-04-

5
7
7
4-38-159-07-

12
4-38-159-12-

4-38-197-01-

2
4-38-137-01
2

2012/745
3
50

4
50

NEW BPS-1

2016/473
6
GAS
89
97
-258
04
38
61

PROP
OSED MO
D FOC
GAS
C
D FO
MO
ED
OS
OP
PR

/
CH
Y
PLA
EA
AR

54
3/3
201
GAS
201
3/3
54
201
2/7
869
GAS
4-0
6- 003
-0 3-
L.O.W.
TIE TO EXISTING

.
.W
L.O NG
ISTI
EX
TO
TIE
0+
200
0+0
00
0+30
0
0+34
0.5
43

.
L.O.W
0+1
00
0+00
0
GAS
.W.

0+0
L.O

00
R
0+3 ES
D SR
00 BI
0+0 0+3 I
B U
D- Q E
00 40.5 TO LIZ
43 0+1
00 SER TO
VIC
E ROA
D LE
0+1 FT 1
00
0+2
00

0+20
0 0+30
0

SER 0+3
VIC 00
ER
OAD
RIG
HT 1

0+4
00
2013/9795
8
1258253-8626

042
2012/8
02 ......
2011/11
GAS
615
6/4
201
2012/4421
2015/3232
2013/7912
GAS
GAS
T
IN
PO
.S
G.P
GAS
GAS
2
32
/3
16
20
GAS
GAS
SA
M
AIL
SU
M
M
IT
RE
SE
RV
OIR
70M
EX PRO
IST P. 3
. 33
K VH 70M 3KV
TO O /H L
/H INE
LIN WIT
E HS
ILIC
ON
RU
BBE
70M R IN
SUL
ATOR
25M
RIG
H TO
FW
AY
70M
TRAC
K RO
AD
EXIST. 33KV HT O/H LINE
25M
RIGH
TO
FW
AY
PRO
P. 3
70M 3KV
O/H
LIN

PR
EW
IT

OP
HS
ILIC

.3
ONR

A
40M UBB
ER

CX 1
0s
INS
ULA

qm
30 17M
TOR

m
CA
BL
E
150
M

20
/0
1//
20
16
70M

A
GAS
70M
70M
EX
I ST
. GR
I D
SUB
E
ST
LIN
/H
H TO
W

AT
T.
IS AT
E
EX
IO
R
N LI
NE
H LINE
. HT O/
EXIST
E

EX
LIN
TER

IST
.
WA

33
KV
BOX CULVERT

HT
BOX CULVERT

U/G
NE
R LI
WATE

LIN
E
PR
OP.
PR 13
OP M
.P PO
INE VC LE

25
ER L BOX CULVERT

M
WAT DU
CT

RIG
PR
O

HT
P.

O
PR 13
OP
. M

FW
3C PO
L

AY
X3 E
44 00s
INE 8M qm
ER L m 100M 70M
WAT CA

25
BL 70M

BOX CULVERT
E 70M
PR

RIG
OP EXIST. 33KV HT O/H LINE
.

HT
TH

O
TR
A
RU
CK
EXIST. 33KV HT O/H LINE

FW
40 ST RO
M B AD

AY
OR EXIST.
IN 33KV HT O/H
G LINE
PR
OP
. AB
S
&
NAWRAS FOC LA
EXIST. 33KV HT O/H LINE

NA

EXIST.
EX
IS

WR
T. EX
33 IS

AS
EXIST. 33KV HT O/H LINE KV T.
EX 3

FO
HT

11KV HT
IS 3K
V

C
T. O/H PR TOR EX
3 3K SILICON RUBBER INSULA IS HT
V
LIN OP 33KV O/H LINE WITH T. O/H
H E . 3 PROP. 3 3K
TO CX V LIN

O/H LIN
/H 30 HT E

E
LIN 28 0 sq O/H
E 8M mm LIN
CA E
65 BL
20 M E
16 PR
/3 O P.
67
8 3
CX
44 300 PR
8M sq OP PR
mm .A OP
CA BS . 3
B & 3K
LE LA V
65 OH
M L
IN
E
20
13
/70
58

33KV HT
65M

UG LIN
E
PR
OP
.3
CX
30
28 0sq
8M m
2 m
CA
BL
P RO E
4- P.
TH
38 RU
16 ST
-1 M BO
RIN
G
83
GAS -0
2 -0
00

LANE5M
WIDE
WA
TER
LIN
E
WATER
LINE
20
16
/36
78
GAS
JABA
L
JABA
L
Om
017
ante
-01 l
-48
7
JA
BA
L
JABA
L
48
15/0
9/2
015
CW
MED
OHA
HM
ZA
MO
ABDU
CW
ALLA
MOH
AME
D 8
FAR
M - 08
CW 01
1-
- 03
38
4- CH
MED
HA EN
MO OP
MED CH
HA 7
- 08
01
1-
- 03

AH
38
4- R M AN
FA LIM

AH
SU

CW
SAGY
FA YID
KHA R M

SAGY
LFA ZA
N MOH
AME
D
201
5 CW OM
/26 RO

CW
SAGYA
H

88 3
CW
FARM
YAGOOB HIMAD
GAS
4-3
8 - 031
-
15
20
9/
48 /0
15

.
.
.
-
72
57

6
74
/3
15
20

7
69 5 17
49 /20
/2 28 /05
23
15
20

1
80
/2
14
20
GAS
GAS

3.0
m
fro
m
Ro
ad
E dg
e
GAS

3.0m from Road Edge


3.0m from Road Edge
GAS
GAS
2
2
1
3
ASP
HAL
T ROA
D

4
5
CO
OR
DI
NA
TE
S
IN
AP WG
RI S
L 20 84
17
.
BPS- 2
Reservoir
BPS-2

5
7

2
4-38-137-01

3 FARM
4-38-147-03-

OPEN
4-38-063-01-037

4-38-186-01-

SUMAIL

OPEN
064-01-020

2015/2385
002

87
/41
-01-

15
20
-151
4-38

004
01-
51-
8-1
4-3
1-010
151-0

151-01-011

BPS-3

2
4-38-146-02-

4-38-008-02-000
165442

3
4-38-169-03-000

4-38-169-01-000

4-38-169-01-000

2
4-38-169-02-000
AS
PH
AL
T
RO
AD

COORD
INATES
IN WGS
84
APRIL 2017.
GAS
GAS
7/0
25 5/20
42
9 17
GAS
1
- 59
/6
14
20

N
- T IO
- 09 NEC
9 59 ON NT
C OI
8 -1 P

4 -3
GAS
- N
9 9-09 ECTIO
N
-15 CONINT
4 -38 PO

- 0 7-
7 59
8-1
4-3

)
(

72
05
28
GAS
20
16
ROW of Pipe Line

/27
65
Shell Pump
GAS
65
6/27
201

65
6/27
201

9341
2016/
GAS
707
2014/6

665
2013/5

3
4- 3
GAS
S/S
Proposed 110mm HDPE pipe E
KV O/H LIN
PROP. 11

Proposed 110mm HDPE pipe


GAS
*
*

OPEN
ROAD

744

*
IC LINE
ELECTR

- 0 6 3 - 0 1-037
4-38

km 48+000

WELL
GAS
km 48+000

WELL

I
AD
W

-
- 3 8- 18 6 -0 1
4

00 0
km 49+
6 88
256 1810.9
4 14 Y=
491.6
X=612
GAS
88
.96
810
561
2
Y=
14
1 .64
49
6 12
X=
km 4
9+00
0
GAS
0
0+00
km 5
GAS
06 OP
4 -0 EN
1-
01
3
N 13
PE 0
O 01-
4 -
06

8
10
km 51+000

23
1-0
4-0
06 E N 20
P 0
O 01-
64-
6
48 0

N 22
PE 0
O 01-
4-
06

4 2
25 477
Y=
4
364
69 09.
POINT

=59
CONNECTION
GAS
GAS
EN
OP 1-009
-0
064
438

EN
OP 1-021
-0
063

158
GAS
GAS
GAS
151-01-010
GAS
151-01-011
151-01-010
2 3
15
83
0=
2
3 15
83
0=
00
5-

BP
20
16
GAS

/5
38
8

S
5

- 3
GAS

CONST
RUCTE
D
4-38-008-02-000
165442

3
4-38-169-03-000

4-38-169-01-000

4-38-169-01-000

2
4-38-169-02-000

OPEN
001-01-111
SCHOOL

2015/4395

3
4-38-160-03-

0
km 68+00

000
69+
km

024-01-027

) (
2917

AREA

SAMAIL SUMMIT RESERVOIR


GAS

25

E
62

00
60

84
58
N0

D
RUCTE

D
RUCTE
CONST

CONST

E
00
25

86
6

58
24
0

0E
0N

0
84
58
25
626
0
0N

E
00
88
58
E
00
86
58
25
62
20
0N

0E
E 900
00
25

25
88 58
6

62
58
22

4
00

00
N

N
E 00

00 E
5850

5848
N
400
2554
POINT
CONNECTION

PHASE I PHASE II

N
400
2554

027 (
-01- )
024 7
291 N
200
2554
G.L.=662m
AL AFIAH

N
200
2554
BREAK PRESSURE TANK

0E 0
5846

0 00 N
2554

N
000
2554

N
800
2553

A
ARE

N
800
2553

N
600
2553
00 E
5848

00 E

N
5846

600
2553
GAS
E
00
50
58

25
53
80
25 0N
53
60
0N

E
00
48
58
E
00
52
58

25
53
40
0N

25
53
60
0N
E
00
50
58

25
53
20
0 N
0E
540
58

25
53
40
0N
E
00
52
58

25
53
00
0 N

25
53
20
0N
0 0E
56
58

E
00
54
58

25
52
80
0N
GAS
25
52
80
58

0N
54
00
E

58
56
00
E

25

58
52

58 56
00
80

58 E
00
E
0N
25
53
20
0N

58
60
00
E 58
58
00
E
25
53
00
0N

58 58
62
25

00 60
E 00
53

E
40
0N

25
53
20
0N
25
53
40
0N

58
64
00
E
GAS
586200 E
2553400 N

2553200 N
586400 E

586400 E
2553600 N

586600 E

586600 E

586800 E

586800 E

587000 E

587000 E
2553200 N
2553400 N

587200 E
2553600 N
GAS
587200 E

2553200 N
2553400 N

587400 E

587400 E

587600 E

587600 E

587800 E

587800 E

588000 E

588000 E
2553600 N

2553400 N

2553200 N

588200 E
GAS
2553

00 E
800 N

00 E

5886
5884
00 E
GAS

5882
2553
800 N

2553
6 00 N

2553
6 00 N

2553
400 N
00 E

00 E

00 E
5882

5884

5886
2553
400 N
E
600
255 588
400
0N

E
600
588

255
380
0N
E
800
588

AC
CE
SSR
OA
D

E
800
588

E
000
589
255
400
0N

255
360
0N

E
000
589
E
200
589

E
200
589
25

255
538
00

360
N

0N
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
525000 E

526000 E

527000 E

528000 E

529000 E

530000 E

531000 E

532000 E

533000 E

534000 E

535000 E

536000 E

537000 E

538000 E

539000 E

540000 E

541000 E

542000 E

543000 E

544000 E

545000 E
2542000 N 2542000 N

2541000 N 2541000 N

2540000 N 2540000 N

2539000 N 2539000 N

2538000 N 2538000 N

2537000 N 2537000 N

2536000 N 2536000 N

2535000 N 2535000 N

2534000 N 2534000 N

2533000 N 2533000 N

2531000 N 2531000 N

00
25-01-0
4-03-2

2530000 N 2530000 N

area = 485860 SQ.M

area = 3633975 SQ.M

area = 213450 SQ.M

2529000 N 2529000 N

2528000 N 2528000 N

2527000 N 2527000 N

2526000 N 2526000 N

2525000 N 2525000 N
534000 E

535000 E

536000 E

537000 E

538000 E

539000 E

540000 E

541000 E

542000 E

543000 E

544000 E

545000 E
525000 E

526000 E

527000 E

528000 E

529000 E

530000 E

531000 E

532000 E

533000 E

2524000 N 2524000 N
25
29
60
54

54
0N
40

42
00

00
E

25
29
80
0N

25
29
60
0N
NEW BPS-4

54
42
00
E
54
3

25
80

30
0

00
0
E

25
29
80
0 N

25
30
20
0 N

25
30
00
0 N
54
36
00
E

25
30
40
0N
25
30
2
54

00
36

N
0E 0

54
38
00
E
GAS
GAS

00 E
5426
N
600
2530
N
400
2530

00 E
5428
00 E
5428
00 E
5430
00 E
5430
N

00 E
200

5432
2530

N
600
2530

00 E
5432
00 E
5434
00 E
5434
N
200
2530

00 E
5436

N
400
2530
00 E
5436
GAS

0N
0N

253080
253060

E
541800
E
54180 0
E
542000
E
54 2000
E
542200
E
542200
E
542400
E
54240 0
E
542600

N 0
253080
E
542600
N

0N
0
253040

253060
GAS

2531000 N
2530800 N

540800 E
540800 E
541000 E
541000 E
541200 E
541200 E
2530600 N

541400 E
541400 E
2531000 N
541600 E
541600 E
2530600 N

2530800 N
GAS

2531000 N
2530800 N

539800 E
539800 E
540000 E
540000 E
540200 E
540200 E
540400 E
540400 E
540600 E
540600 E

2531000 N
2530800 N
GAS

2531200 N
2531000 N

538800 E
538800 E
539000 E
539000 E
539200 E
2530800 N

539200 E
539400 E
539400 E
539600 E
539600 E
2531000 N
2530800 N

539800 E
GAS

2531400 N

537800 E
2531400 N
2531200 N

537800 E
538000 E
538000 E
538200 E
538200 E
538400 E
538400 E
2531000 N

538600 E
538600 E

2531400 N
2531200 N
2531000 N

538800 E
2531
2531

400 N
N 200

5378
00 E

5376
00 E

5376
00 E
2531

5374
00 E
000 N

5374
00 E

5372
00 E

5372
00 E

5370
0 0E

5370
00 E

5368
00 E
2531

2531
000 N

200 N
GAS
5368
00 E
2531

2531
2
N 000

00 N
5368
00 E
2530
800 N

5366
00 E

2531
00 N 2

5366
00 E

5364
00 E

5364
00 E

5362
00 E

5362
00 E

5360
00 E

5360
00 E
2531
000 N

5358
00 E
2530
2530

800 N
600 N
GAS
GAS

0N
0N

E
53 480 0
253120
253100
N 0
253080

E
535000
H.T.L

E
53 5000
E
535200
E
535 200
E
535400
E
535400
E
535600
E
535 600
5358 00
E

0N
253100
0N

N 0
253060

253080
GAS

0N
0N

253120
253100

E
534000
E
53 4000
E
534200
E
5 342 00
E
534400
E
534400
E
534600
E
5 346 00
E
534800

0N
0N
E
534 800

253120
253100
0N
253080
GAS

0N
0N

253140
253120

E
533000
E
533000
E
533200
E
53 320 0
E
533400
E
53 340 0
E
533600
E
533600
N 0
253140
E
533800
E
53 3800

0N
0N

253120
253100
GAS

0N
0N

253160
253140

E
532000
E
5 3200 0
E
532200
E
532200
E
532400
E
5 324 00
E
532600
E
53 2600 253160
0N
E
532800
E
5 3280 0

0N
0N

253140
253120
GAS

0N
253160

0N
253180

E
531000
E
53 1000
E
531200
E
5312 00
E
531400
0N
253140

E
53 1400
E
531600
E
531600
E
531800
E
53 1800

0N
0N

253160
253140
N N

53

53
53
0

53
60 00

06
8

02
04
31

00
31 0N

0
25 25 00

00
00

00
0E
32

E
25

E
GAS

53
00
00E
0 N
60
31
25

0N
20
32
25

0 N
80
31
25

53
53

53
53
0N N

02
06

04
08
0
00 20

00
00

00
00
32 32
25 25

E
E

E
E
52

52

52

52
0N

98

96

94

92
20

00

00

00
32

00
25

E
GAS

0N
60
32
25

53
00
00E
0N
20
32
25

0N
80
32
25

0N
80
32
25

52
94
N

00
00

53

52
52
4
32

E
0N N

00

96
0

98
25 60 80

00

00
32 32

00
25 25

E
E
25
32
60
0 N

25
32
80
0N
52
90

25
00

32
80
E

0N
25
32
60
0 N

25
33
00
0N
52
92
00

25
32
E

80
0 N
52
88
00
E

25
33
20
0N

25
33
00
0 N
52
90
00
E
52
86

25
00

33
E

40
0N

25
33
20
0 N
52

52
86

88
0

00
0E

E
GAS
52

52
86

88
00

00
E

E
25
33
60
0N

25
33
40
0N
52
84
00
E

25
33
80
0N

25
3 36
00
N
52
86
00
E
52
82
00
E

25
34
00
0N

25
33
80
0 N
52
40 8
E 0

25
34
2 00
N
25
34
00
0N
52
80
00

52
E

82

25
34
00

20
E

0 N
52
82
00
E
GAS
GAS

E
00
74
52 E
00
76
52
E
00
74
52
0N 0
48
53 2

E
00
76
52 E
00
78
52
0N
40
34
25

E
00
76
52
N 0
60
34
25

E
00
80
52
N
00
42 3
25

0 0E
78
52
0N
40
34
25
E
00
0N

80
20

52 E
00
4
53

82
2

52
E
00
82
52
GAS
0N
20

E
35

00
25

66
52
N
00
54
53 2

E
00
68
52
E
00
70
52
N
00
50
53 2

0 0E
68
52
0N
20 5
53 2

E
00
72
52
0N 0
48 3
25

0 0E
70
52
0N
00
35
25
E
00
74
52
E
00
72
52
E
00
74
52
5266
5264

00 E
00 E

5268
00 E
2535
400 N

2535
40 0N

2535
600 N

2535
600 N

2535
800 N

25358
00 N

2536
0 00 N

2536
000 N
5266
POINT

00 E
5264

2536
200 N
CONNECTION

00 E
5262
00 E

2536
200 N
GAS
TION
ONNEC
C

2537000 N
2536200 N

2536400 N

2536800 N
2536600 N
GAS

526400 E 526400 E

TO BE
CANCE
L ED

2536200 N
DN 400
DI

526600 E
526600 E

3m. Arcade
3m. Arcade
2013/6291

CONNECTION
POINT

2536600 N

2536800 N

2537000 N
2536400 N
2536200 N
E

25

25
0E 00

25

37

25
37
0 68

37
66

60
52

38
80
52

40

0N

00
0N
0
GAS

0N
N

TO
BE

+
E
E 00
00 70
4 52

CA
5 26

NC
EL
E D
0N

25
20

38
37

00
2 5

0N
D
ELE
NC
CA
BE
TO
E
0 E 00
60 72
6 52

25
52

37
80
de

0N
rca
.A
3m
0N

25
e

25
d
rca
.A

37
3m

37
20

0E E

40

60
37

80 00

0N

0N
6 70
25

52 52
139-06-
33m Ex.L.T Line

527400 E

527600 E

527800 E

528000 E
527200 E
33m P6 to be Shifted

000
( + )
124-125-126-127-128-129-664-665

2/5/2017

(1-4-5-515-502 )
( + )
5

2012/6862

2537800 N 2537800 N

CONNECTION
POINT

DN 300 DI DN 400 DI

2537600 N 2537600 N
527200 E

527400 E

527600 E

527800 E

528000 E
621250 E

621500 E

622250 E

622500 E

FROM NEW MPS


2604500 N 2604500 N

DI
0

m
25

0
12 00
DN

.0
00
L= N 8
D
MS
00

DN 1700
7

094
DN 1

DN 1

DN 800 TO EXISTING RUSAYL ESR


DN 800 L=1200
L=3.50
CONNECTION
DN 100
POINT

DN 1600
TO NEW BPS-1
2604500 N 2604500 N
EXISTING
MS

RUSAYL ESR
600

094
DN 1

CAPACITY 14.000 m3
621250 E

621500 E

622250 E

622500 E
DN 1

G.L.=128.50m
CONNECTION POINT - SCHEME

OFF-TAKE TO FUTURE RUSAYL RESERVOIR


612250 E

612500 E

612750 E
612000 E

2589250 N 2589250 N
FROM BPS-1
TO BPS-2
DN 1500 DN 1600 DN 1600

DN 992 MS

DN 600

DN 400
DN 600

DN 400
TO LIZU
TO
BID Q E
-BI
D
ES
SR
R

2589000 N 2589000 N

TO BID-BID ESR
TO LIZUQ ESR
612000 E

612500 E
612250 E

612750 E

CONNECTION POINT - SCHEME

OFF-TAKE TO BID-BID RESERVOIR


OFF-TAKE TO LIZUQ RESERVOIR
597000 E

597000 E

597250 E

597500 E

597750 E
EXISTING DN 40
0 DI
SAMAIL ESR
CONNECTION S
CAPACITY 10.000m3 M
POINT 2
G.L.=450.00m 99
N
D

2579000 N

I
00 D
DN 4

S
EXISTING 92M
DN9
TANKER FILLING STATION
TFS-1
597000 E

597000 E

597250 E

597500 E

597750 E
2578750 N 2578750 N

OFF-TAKE TO SAMAIL RESERVOIR

80
9.
DN 500

L=

D
TO FUTURE SAMAIL ESR

2
N

S-
50
L=32.90

L=

BP
L=9.30

0
L=10.00

16

M
.0
DN 400

O
0

FR
00
15
N
10.00

I
D
0
40
N
D

DN 400 DI
TO EXISTING SAMAIL ESR

EXISTING MANHOLE EXISTING MANHOLE


DN 300 PRESSURE REDUCING DN 400 ISOLATION
VALVE BUTTERFLY VALVE
S
M
2
99
N
D
00
14
N
D
3
S-
BP
TO

CONNECTION POINT - SCHEME


594000 E

594250 E
593250 E

593500 E

594500 E

594750 E

595500 E

595750 E

596000 E
595000 E

595250 E
2570750 N

CONNECTION
POINT
2570500 N

2570250 N

2570000 N

2569750 N

EXISTING
TAWI NISF ESR
CAPACITY 5000m3 2569500 N
G.L.=517.00m

2569250 N
594000 E

594250 E
593250 E

593500 E

593750 E

594500 E

594750 E

595500 E

595750 E

596000 E
595000 E

595250 E
FROM BPS-2

OFF-TAKE TO TAWI NISF ESR


DN 992 MS
DN 1400

DN 300

L=12.00 L=10.00
L=10.00
DN 300

DN 300 DI TO EXISTING

TAWI NISF ESR


TO BPS-3

CONNECTION POINT - SCHEME


2553750 N
2554000 N
2554250 N

FROM BPS-3
585000 E

EXISTING

0
WADI MAHRAM ESR

140
400

DN 1400
CONNECTION CAPACITY 6000 m3

DN

1
G.L.=654m

DN
POINT DN 400 DN 400

L=3.50 L=2.00

L=4.50
DN
4 00 D
I

TO SUMMIT RESERVOIR
DN 400 DI TO EXISTING
WADI MAHRAM ESR

584750 E 584750 E

DN
AL AFIAH 140
0
BREAK PRESSURE TANK DN
MS

8 94 M
1400

G.L.=662m S
793
DN

DN

2554250 N

2554000 N
CONNECTION POINT - SCHEME

OFF-TAKE TO EXISTING WADI MAHRAM RESERVOIR

57 57
77 80
N

N
50 00
0

0
50

25

00
E E
38

38

38
25

25

25

FROM SUMMIT RESERVOIR


DN 894 MS

DN 1400
DN 600
TO FUTURE IZKI ESR
CONNECTION
L=26.00
FUTURE POINT

DN 1200
IZKI ESR

I
00 D

TO NEW BPS-4
DN6
S
94 M
N

DN 8
0
25
38

57 57
N
25

57
75 77
0

80
00

00 50 00
38

E E E CONNECTION POINT - SCHEME


25

OFF-TAKE TO FUTURE IZKI RESERVOIR


BIRKAT AL MOUZ-1 ESR
2535250 N
2535750 N
2536000 N

2535500 N

TO EXISTING
571000 E 571000 E

DN 793 MS
DN 300 DI

DN 200DI
DN 200

L=6.50

L=7.00
CONNECTION
0 DI
DN 20 POINT
GV

PUMPING
STATION
570500 E 570500 E

DN 200DI
EXISTING

MS
BIRKAT AL MOUZ-1 ESR

DN 200

L=6.00
DN 793
CAPACITY 3000m3
G.L.=620m
DN 1200 DN 1200
2536000 N

TO NEW BPS-4 FROM SUMMIT RESERVOIR


2535750 N

2535500 N

2535250 N
DN 300DI

CONNECTION POINT - SCHEME

OFF-TAKE TO EXISTING BIRKAT AL MOUZ-1 RESERVOIR

FROM SUMMIT RESERVOIR


569500 E

569750 E
569000 E

569250 E

S
M
3
79
DN
00

CONNECTION
12

POINT
N
D

DN 300

L=9.00
MS
TO FUTURE BIRKAT AL MOUZ-2 ESR
3
79
DN

DN 1200
2534500 N 0 2534500 N
20
D N1

TO NEW BPS-4
FUTURE
BIRKAT AL MOUZ-2 ESR
CAPACITY 8000m3
569500 E

569750 E
569000 E

569250 E

G.L.=590m

CONNECTION POINT - SCHEME

OFF-TAKE TO FUTURE BIRKAT AL MOUZ-2 RESERVOIR


567500 E

567750 E

568250 E
568000 E

AR NG

S
-P
DI

HD TI
0

AK IS
40

L EX
DN

BA TO
JE
L=
7.0
EXISTING 0

JEBAL AKHDAR - PS EXISTING MANHOLE


GV

G.L.=572.60m GATE VALVE

0
40

0
.4
N

53
D
L=
I
0D
40
2535000 N 2535000 N DN

L=80.60
DN 400
DI
400
DN

DN

L=16.00
DN 400
79
I

3M CONNECTION
0D

DN 793MS

DN S POINT
40

TO NEW BPS-4 FROM SUMMIT RESERVOIR


12 DN 1200
00
DN

DN
567500 E

567750 E

568250 E
568000 E
79
3M
S CONNECTION POINT - SCHEME

OFF-TAKE TO EXISTING JEBAL AKHDAR - PS


610000 E

610250 E

610500 E

610750 E

FROM BPS-1
EXISTING
2589000 N 2589000 N
FANFARAH ESR
CAPACITY 200m3
G.L.=300m TO EXISTING DN 200 DI DN 200 DI

FANFARAH ESR

L=10.00
DN 200
DN 200

L=19.50 L=6.90

DN 1500
DN 992 MS
TO BPS-2
2588750 N 2588750 N
610000 E

610250 E

610500 E

610750 E

CONNECTION POINT - SCHEME

OFF-TAKE TO EXISTING FANFARAH RESERVOIR


25

E
0E
25 36

00
75

50

0
36

2
50 0N

62
56

5
0N

25
37
0 00
G.L.=580m N
FUTURE

25
36
CAPACITY 5000 m3

25
AL WASIT ESR

0N

25
36
7 50
N

25
36
00
0N

25
36
5 00
N
0E
0
30
56

25

TO FUTURE AL WASIT ESR


35
75
0N

25
36
25
0N
E
50
32
56

25
35

L=9.00
DN 300
50
0N

CONNECTION POINT - SCHEME


FROM SUMMIT RESERVOIR
OFF-TAKE TO FUTURE AL WASIT RESERVOIR

TO NEW BPS-4
DN 1200
25
36
00
0N
E
00
35

25
DN 300 DI

35
56

25
0N

25
3 57
50
N
POINT

25
35
00
CONNECTION

0N

25
35
50
0N

DN 1200 DN 1200
DN 793 MS DN 793 MS 25
E

35
E

25
0
00

0N
25
35

63
56

5
25

E
E
3

0E
40

50
00
0

0
25

77
8
0N

5
58

5
5
55
0E

G.L.=530m
50

25
FUTURE
8

3 37
55

5 0N

CAPACITY 8000m3

E
50
77
55
25
3 35
0 0N

25
34
00
0N
DN
0E

E
5

40
87

00
55

80
0D
I

55
25
33
25
0N

25
3

TO FUTURE HAY A`TURATH ESR


37
5 0N
E
00
90
55

E
2 50
558

25
33
00
0 N

L=3.50
25

DN 400
3 35
0

CONNECTION POINT - SCHEME


0N
TO NEW BPS-4 FROM SUMMIT RESERVOIR
DN 1200
E

25
32
250

75
0N
59
5

E
DN 400 DI

OFF-TAKE TO FUTURE HAY A`TURATH RESERVOIR


0
50

25
3
58

32
5

5 0N

25
POINT

32
50
0N

25
CONNECTION

33
0E

00
50

0N
9
55

E
50
87
55

DN 1200
DN 793 MS DN 1200
DN 793 MS
25
32
50
0
E

N
0E

25
0E

00

32
25
50

7
9

90

50
5 59

N
55
55
E

N
00

DN 793 MS
55

0
55 E

00

75

50
DN 1200
CONNECTION 50 7

31

30

30
55 5
POINT

25

25

25
EXISTING
FIRQ (ADAM) BPT DN 600 DI

CAPACITY 1200 m3
0E G.L.=485m
5 25
55

DN 793 MS
DN 900
CONNECTION
POINT

DN 300 DI

DN 691 MS
DN 900
EXISTING E
FIRQ ESR 00 5
55 5
CAPACITY 6000m3
G.L.=560m
0N

N
00

50
31

2
30
25

25
0N

0N
E
00
75

50

50
55 0E
30

30
52
55
25

25
OFF-TAKE TO EXISTING FIRQ(ADAM) BPT & FIRQ RESERVOIR
FIRQ (ADAM) BPT

TO EXISTING
FIRQ ESR
TO EXISTING

DN 300DI
DN 600DI

DN 300
DN 600
L=5.60
L=5.60
L=8.60

L=6.50
DN 300DI
DN 600DI

L=3200
DN 300
DN 600

L=4.70

TO NEW BPS-4 FROM SUMMIT RESERVOIR


TO NEW BPS-4 FROM SUMMIT RESERVOIR DN 900
DN 900 DN 1200

DN 691MS DN 793MS
DN 793 MS DN 793 MS

CONNECTION POINT - SCHEME CONNECTION POINT - SCHEME


555250 E

555500 E
554750 E

555000 E
CONNECTION

DN
POINT

9
00

DN
CONNECTION

300
POINT

DI
800
DN

DN
200
D I
2529000 N 2 00 2529000 N

DI
DN DI
00
N3

DN
D

800
EXISTING
FIRQ PUMP STATION
G.L.=468m

555250 E

555500 E
554750 E

555000 E

OFF-TAKE TO FUTURE MANAH ESR & FIRQ PUMP STATION


FROM SUMMIT RESERVOIR

FROM SUMMIT RESERVOIR


DN 800
DN 900

DN 300 DI L=51.40 DN 300 DI

TO EXISTING FIRQ PS L=5.00

DN 400 DI
TO FUTURE MANAH ESR
L=11.50

DN 800
DN 800

TO NEW BPS-4

TO NEW BPS-4

CONNECTION POINT - SCHEME CONNECTION POINT - SCHEME


546500 E

546750 E

547000 E

TO NEW BPS-4
FUTURE
TAYMSA ESR

DN
CAPACITY 5000m3

70
G.L.=536m

0
DI 2529250 N
300 INE
DN IPEL
EP

DN 700
UR 0m
FUT 44.6
L=1
DN 300 DI
TO FUTURE TAYMSA ESR
L=3.50

CONNECTION

DN
POINT

DN 800
80
0

FROM SUMMIT RESERVOIR


546500 E

546750 E

547000 E
2529000 N

CONNECTION POINT - SCHEME


OFF-TAKE TO FUTURE TAYMSA RESERVOIR
E

E
E
TO BE

0N
500

000

250
650
750
DN 4

253
526

527

527

TO MAMURA ESR
526
00
C

CONNECTION
ANCE

POINT
LED

DN 400 DI
DN 300 DI

DN 400

DN 300 DI DN 300 DI
N
6 250 TO BE CANCELED
253 TO JIBREEN ESR

N
6 500
DN 60

253

DN 600
0

EXISTING
JIBREEN ESR

FROM NEW BPS-4


CAPACITY 8500m3
G.L.=620m
E

E
500

750

000

0N
625
526

526

527

253 CONNECTION POINT - SCHEME

OFF-TAKE TO EXISTING JIBREEN RESERVOIR


E

E
E
E
0N

E
E
E
0N 650 0N

250
625

750
000
750
675

000
500
500
253 253 253

E
525

525
525
524

526
525
524

250

DN 60
526

0
0N
675
253 CONNECTION
POINT

DN
70
0
CAPACITY 7000m3
00 N G.L.=610m
25 365

DN 500 - FUTURE PIPELINE L=2577.30m

DN 300 TO AL-GHAFAT PS & ESR

0N 0N
625 550
253 253

E
250
526
0N 0N
600 525
253 253
E
250

E
50 E

E
E
E

250
524

750
000

000
500
500

525

525
524

525

526
525
524

0N 0N 0 N
5 75 550 525
253 253 253

OFF-TAKE TO FUTURE NEW BAHLA RESERVOIR

TO MAMURA ESR
DN 600
DN 500 DN 500 DI
TO FUTURE L=5.00
NEW BAHLA ESR

DN 700
FROM NEW BPS-4

CONNECTION POINT - SCHEME


613750 E

614000 E

614250 E

614500 E

DN 992 MS

FROM MPS ESR


DN 99
2593000 N 2593000 N

2MS
INTERCONNECTION
EXISTING

DN 1000

L=6.40
BPS-1 ESR
CAPACITY 4100m3
G.L.=197.35m

DN 992 MS

DN 100
PROPOSED

DN 1600
BPS-1 ESR
CAPACITY 25000m3

DN 1000

L=5.50
G.L.=201.0m

TO EXISTING BPS-1 ESR


DN 1000

L=6.90
2592750 N 2592750 N

DN 99

TO BPS-1 ESR
613750 E

614000 E

614250 E

614500 E
2MS
INTERCONNECTION - SCHEME

FROM BREAK TANK


584500 E

584750 E

2553750 N 2553750 N

FROM SUMMIT ESR


EXISTING
WADI MAHRAM ESR

DN 894 MS
G.L.=654m

DN 1400
DN
140
DN 0
1400
DN 900 DN 900
L=4.40 L=4.60

DN 1400
DN 894 MS
DN 100

MS
894

FROM BREAK TANK


DN

TO NEW BPS-4 ESR


0
140 INTERCONNECTION
DN
585000 E
584500 E

584750 E

2553500 N 2553500 N
INTERCONNECTION - SCHEME
E

0N

0N

0N
00

DN 793 MS
55
5 0E

00

75

50
DN 1200
5 5
57

31

30

30
55

25

25

25
EXISTING
FIRQ (ADAM) BPT DN 600 DI

E
50 CAPACITY 1200 m3
52
55 G.L.=485m

DN 793 MS
DN 900
DN 300 DI

DN 691 MS
INTERCONNECTION

DN 900
EXISTING E
00
55
FIRQ ESR 55

CAPACITY 6000m3
0N

G.L.=560m

0N
00

25
31

30
25

25
0N

N
E
00

00
75
550 E

5
50
30
5

30
52
55
25

25
FROM SUMMIT RESERVOIR

DN 691 MS

DN 700 DN 700

L=4.60 L=3.70

DN 100
DN 900

DN 691 MS
TO NEW BPS-4

INTERCONNECTION - SCHEME

You might also like