Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 4

Republic of the Philippines

Department of Education
REGION X – NORTHERN MINDANAO
SCHOOLS DIVISION OF LANAO DEL NORTE
KAWIT ORIENTAL INTEGRATED SCHOOL
KAWIT ORIENTAL, KAUSWAGAN, LANAO DEL NORTE

GAD PROJECT PROPOSAL (ELEMENTARY)


RENOVATION OF HAND WASHING FACILITIES
S.Y. 2021-2022

I. Identifying Information
a. Project Title: Renovation of Hand Washing Facilities
b. Project Site: Kawit Oriental Integrated School
c. Project Proponent: MARK P. PAGUIDOPON
d. Time Frame: April– May 2021

II. General Information


a. Description: The main goal in this project is to provide the learners of Kawit Oriental
Integrated School an additional faucets of the existing handwashing facility. It will focus
on additional five faucets, putting tiles and roofing. This project will help every pupil to
do their handwashing comfortable.
b. Management level of the Project: School -Based

c. Delivery Mode:

The project materials will be delivered by the supplier upon payment and a contract of
service will be made for the civil works (laborer) who will work on the said project.
d. Rationale:
Handwashing is one of the most effective ways to prevent transmission of decease.
Once children return to school after the COVID-19 crisis, the additional faucets will help
cater more pupils to maintain and follow health protocols in handwashing.

Kawit Oriental Integrated School


Kawit Oriental, Kauswagan, Lanao del Norte
500453
kawitorintegratedschool@gmail.com
e. Objectives:
To make sure all our learners safe from contamination of viruses and bacteria that
detrimental to their health.
To promote health measures in the school as mandated by the government.

Program of Work: (Please see the attached copy)

I. Monitoring & Evaluation Plan:


The school principal together with the school inspection officer shall be in-charge in the
monitoring of the undergoing project. When it will be done, the division engineer
together with the division inspection team will evaluate the implementation of the said
project.

Prepared by: Noted by:

NINETTE J. PAGLINAWAN MARK P. PAGUIDOPON


ELEMENTARY GAD Coordinator School Principal I

Recommending Approval:

ARLENE D. MANGINSAY, Ph.D


EPS,SGOD DIV.GAD Focal Person

Approved:

MARIA CARMELA T. ABLIN ,Ed D.


Chief Education Supervisor, SGOD
Republic of the Philippines
DEPARTMENT OF EDUCATION
Region X
Schools Division of Lanao del Norte
Kauswagan District
KAWIT ORIENTAL INTEGRATED SCHOOL
Kawit Oriental

Description of Work: Renovation of Handwashing Facilities


Source of Fund: Elementary School GAD Budget 2021

PROGRAM OF WORK

Stock No. Unit Description Quantity Unit Price Total Cost


1 pc Hollow block 80 14.50 1,160.00
2 pc Cement 5 245 1,225.00
3 cubic Fine Sand 1 1,250 1,250.00
4 pc Tiles 40x40 18 68 1,224.00
5 pc Tile Frame 3 55 165.00
6 pc Faucet 10 210 2,100.00
7 pc T 10 28 280.00
8 pc Pipe 1 85 85.00
Total Material Cost 7,489
Labor 11,885.25 4,032.75
Hauling Lacking 1,557.50 363.5
Grand Total 13,442.75

Prepared by: Noted by:

NINETTE J. PAGLINAWAN MARK P. PAGUIDOPON


ELEMENTARY GAD Coordinator School Principal I

Reviewed by: Recommending Approval:

ENGR. NOR JANAH MACASIMPAN ARLENE D. MANGINSAY, Ph.D


Division Engineer EPS,SGOD DIV.GAD Focal Person

Approved:

MARIA CARMELA T. ABLIN ,Ed D.


Chief Education Supervisor, SGOD

You might also like