Allam Iqbal Science School

You might also like

Download as pdf
Download as pdf
You are on page 1of 2
=) OFFICE OF THE SUB DIVISIONAL OFFICER SS BUILDINGS SUB DIVISION (M&R) LODHRAN The Principal, Allama Iqbal Science School, Muhammad Saee, Tehsil Kehror Pacca District Lodhran, No_1786 _ joa (mar) pated 28 22-2021 Subject: ISSUANCE OF BUILDING FITNESS CERTIFICATE FOR THE BUILDING OF ALLAMA IQBAL SCIENCE SCHOOL MUHAMMAD SAEE, TEHSIL KEHROR PACCA DISTRICT LODHRAN In response to the request from the office of the Chief Executive Officer (DEA), Lodhran, vide Endst. No.734/G.B-II dated.27-02-2021, relevant to the subject cited above. The Building Fitness Certificate along with the building inspection report is attached herewith. Sub Divisional Officer idin, ub Division (M&R) 4] ,odhran No. & Date Even. A copy is forwarded to the Assistant Director (ADMN) for Chief Executive Officer, District Education Authority and Lodhran for information with reference to his Endst: No.734/GB.II dated 27.02.2021. Sub Divisional Officer Buildings Sub Division (M&R) Lodhran No.17 88 Date of Issuance:2.9 /©2 /202.) BUILDING FITNESS CERTIFICATE Consequent to the visual Inspection/reconnaissance in response to the request forwarded from office of the Chief Executive Officer, District Education Authority, Lodhran, vide Endst. No,734/GB-II dated.27-02-2021, itis hereby stated that the existing building of ALLAMA IQBAL SCIENCE SCHOOL MUHAMMAD SAEE TEHSIL KEHROR PACC DISTRICT LODHRAN ,”, run by Sardar Muhammad owned by Sardar Muhammad is constructed on land of Sardar Muhammad S/O Nazir Hussain is comprised of main academy Block ( Single Story 6-Rooms 4-Nos Bath of ordinary brick masonry and Tee iron Structure) with allied facilities including water supply, internal electrification and sanitation in view of provided approved building plan. Apparently, the building's condition is Satisfactory and can be utilized for the specific intended purpose, provided that there are NO structural modifications, accidental damages, design exceeding loads implications, improper repair/maintenance, improper drainage, use of low-quality installations, breach of HSE standards and force majeure in future. Further, this office doesn't bear the responsibility of construction workmanship, quality of materials used, bearing failure and fulfilment of all design & engineering parameters/ specifications/ standards upon construction of building and also the safety of lives of staff, students and school property as undertaken by the registered ‘owner/Principal Note: © This is not valid to be presented in any Honorable Court/Lavul proceedings. © This certificate does not endorse the subject building construction under building by laws. © This certificate doesn't validate the structural stability without relevant non-destructive testing. ‘eatin ( Catosran Date of Expiry: 34/12/2021

You might also like