AUDIT INFORMATION – COVER SHEET


Contract: Life Support MFD-IFMS-001 Contract Section(s): Cooling Revision: 00

FM Representative: Ali Oudah/Munaf


Examination Date: 07 Oct 2019 Risk Rating: Low
HSE Representative: Nirranjan / Mushin Abdali

Site / Location: TMC Last Examination: 07 Sep 2019 Contractor Risk Rating:

Service Examination Type: Initial Follow Up Scheduled Special

Contractor QHSE: E-Mail: MJNHSEMgr@rpsg.com

Contractor Manager/Supervisor: E-Mail: MJNTMCCampMgr@rpsg.com

Follow-Up Examination Required: Yes No Out-brief with Contractor: Yes No

Corrective Measures Required: Yes No Concern Letter issued: Yes No

Observations in brief: During the special inspection Camp Boss stated that no cooling is performed in TMC DFAC, due
to no food is being prepared in advance. All food prepared goes straight to service line.

Corrective
Deficiencies Identified:
Action Y/N

 NA N

INSPECTION GUIDELINES
This guide presents core steps in the execution of Hazard Analysis Critical Control Point (HACCP). It is a simplified, generic plan for catering contractors providing
food and drinks to staff. When implemented, it will help catering contractors to establish and maintain a food and drinking water safety management system in line
with HACCP principles. It is not intended to be a detailed plan for the purposes of HACCP certification.

Select appropriate response for each requirement Examined


YES = Requirement performed satisfactory.
NO = Performance of requirement unsatisfactory or not being performed.
N/A = Requirement not applicable.

 Be familiar with all Contract Scope of Services and References

 Be familiar with all Contract Scope of Services and References


 Always use good safety practices and conduct with professionalism
 Be familiar with HACCP
 Ensure the contractor representative is present to witness and document the audit process/walkthrough

REFERENCES

 Contract SOW
 HACCP
Facilities Management

 Previous Inspection report (if applicable)

General Questionnaire

Requirement YES NO N/A Action Required and COMMENT

Cooling
1. Are high risk foods which are No cooling is performed in TMC DFAC, due to no food is being
cooling completely separated from raw prepared in advance. All food prepared goes straight to
foods? service line.

2. Is food which is being cooled No cooling is performed in TMC DFAC, due to no food is being
protected from contamination, prepared in advance. All food prepared goes straight to
including not being placed near open service line.
windows or doors?
3. If a blast chiller is used, is the food No blast chiller available.
cooled to below 5°C in less than 2
hours?
4. If a blast chiller is not used for No blast chiller available.
cooling, is the food cooled from 60°C
to 21°C within 2 hours and 21°C to
7°C within 4 hours?
5. Are liquid foods cooled in shallow no cooling is performed in TMC DFAC, due to no food is being
trays to a max depth of 25mm? prepared in advance. All food prepared goes straight to
service line.

6. Are the time and core temperature of no cooling is performed in TMC DFAC, due to no food is being
cooled food checked using a calibrated, prepared in advance. All food prepared goes straight to
disinfected probe thermometer in service line.
accordance with the HACCP control
chart monitoring procedures?

Pictures (if required to document the above):