RE Wall Drawing For Structure 31+329 & 31+820
RE Wall Drawing For Structure 31+329 & 31+820
RE Wall Drawing For Structure 31+329 & 31+820
3) 4.8M (GEOGRID GG100) 2) 5.0M (GEOGRID GG100) 2) 4.9M (GEOGRID GG100) 1) 6.3M (GEOGRID GG100) 1) 5.1M (GEOGRID GG100)
4) 4.8M (GEOGRID GG120) 3) 4.5M (GEOGRID GG120) 3) 4.3M (GEOGRID GG100) 2) 4.6M (GEOGRID GG100) 2) 4.4M (GEOGRID GG100)
5) 4.8M (GEOGRID GG150) 4) 4.5M (GEOGRID GG120) 4) 4.2M (GEOGRID GG120) 3) 4.0M (GEOGRID GG120) 3) 3.8M (GEOGRID GG100)
6) 4.8M (GEOGRID GG150) 5) 4.5M (GEOGRID GG150) 5) 4.2M (GEOGRID GG150) 4) 4.0M (GEOGRID GG120) 4) 3.7M (GEOGRID GG120)
7) 4.8M (GEOGRID GG200) 6) 4.5M (GEOGRID GG150) 6) 4.2M (GEOGRID GG150) 5) 4.0M (GEOGRID GG150) 5) 3.7M (GEOGRID GG150)
8) 5.1M (GEOGRID GG200) 7) 4.8M (GEOGRID GG200) 7) 4.5M (GEOGRID GG200) 6) 4.3M (GEOGRID GG150) 6) 4.0M (GEOGRID GG150)
9) 6.1M (GEOGRID GG200) 8) 5.8M (GEOGRID GG200) 8) 5.5M (GEOGRID GG200) 7) 5.3M (GEOGRID GG200) 7) 5.0M (GEOGRID GG200)
DESIGN SECTION HEIGHT = 6.8 M DESIGN SECTION HEIGHT = 6.4 M DESIGN SECTION HEIGHT = 6.0 M DESIGN SECTION HEIGHT = 5.6 M DESIGN SECTION HEIGHT = 5.2 M
MEYERHOF STRESS, V =175.95 KN/SQMT MEYERHOF STRESS, V = 168.50 KN/SQMT MEYERHOF STRESS, V = 161.04KN/SQMT MEYERHOF STRESS, V = 152.16KN/SQMT MEYERHOF STRESS, V = 144.66 KN/SQMT
NOTE:
1) 5.7M (GEOGRID GG100) 1) 4.7M (GEOGRID GG100) Seismic Zone VI has been considered for Design.
2) 4.1M (GEOGRID GG100) 2) 3.9M (GEOGRID GG100) 1) 4.0M (GEOGRID GG100)
1) 5.2M (GEOGRID GG100)
3) 3.4M (GEOGRID GG120) 3) 3.3M (GEOGRID GG100) 2) 3.6M (GEOGRID GG100) 2) 3.3M (GEOGRID GG100) Material Properties
4) 3.4M (GEOGRID GG120) 4) 3.1M (GEOGRID GG120) 3) 2.7M (GEOGRID GG100) Soil Properties Reinforced Fill Non reinforced Fill Foundation soil
3) 2.9M (GEOGRID GG120)
5) 3.7M (GEOGRID GG150) 5) 3.4M (GEOGRID GG150) 4) 2.8M (GEOGRID GG120) Density 15 kN/cum 15 kN/cum 18 kN/cum
4) 3.2M (GEOGRID GG120)
6) 4.7M (GEOGRID GG150) 6) 4.4M (GEOGRID GG150) 5) 3.5M (GEOGRID GG150) Phi
5) 4.2M (GEOGRID GG150)
TLP TLP TLP TLP Cohesion 0 kN/sqmt 0 kN/sqmt 0 kN/sqmt
DESIGN SECTION HEIGHT = 4.8 M DESIGN SECTION HEIGHT = 4.4 M DESIGN SECTION HEIGHT = 4.0 M DESIGN SECTION HEIGHT = 3.6 M
MEYERHOF STRESS, V = 137.14 KN/SQMT MEYERHOF STRESS, V =129.59 KN/SQMT MEYERHOF STRESS, V =120.76KN/SQMT MEYERHOF STRESS, V = 118.79 KN/SQMT The S.B.C. of the foundation soil should be equal to or
greater than the Meyerhoff Stress at the foundation. In
1) 4.5M (GEOGRID GG100)
case the required S.B.C. is not availed, ground
1) 3.3M (GEOGRID GG100)
1) 4.0M (GEOGRID GG100) improvement has to be carried out.
2) 3.0M (GEOGRID GG100) 2) 2.8M (GEOGRID GG100)
2) 2.5M (GEOGRID GG100) Elevation of first layer is 0.4 m from the TLP and
3) 2.5M (GEOGRID GG120) 3) 2.5M (GEOGRID GG100)
3) 2.5M (GEOGRID GG120)
standard spacing of all layers are 0.8m.
4) 3.5M (GEOGRID GG120) 4) 3.0M (GEOGRID GG120)
TLP TLP TLP TLP - Top of Leveling Pad
DESIGN SECTION HEIGHT = 3.2 M DESIGN SECTION HEIGHT = 2.8 M DESIGN SECTION HEIGHT = 2.4 M 1. Before execution, the test of fill material to be carried
MEYERHOF STRESS, V = 106.71KN/SQMT MEYERHOF STRESS, V = 101.57 KN/SQMT MEYERHOF STRESS, V = 96.66KN/SQMT out to ensure its density (15 KN/m3) assumed in design.
If the density is more than this, then GIIPL shall be
Note:
This Drawing is furnished solely for the use of or in connection with this project, and
the proprietary informantion shown herein is not to be transmitted to any other
organization without specific authorization by Geosys India Infrastructures Pvt. Ltd. RAVI INFRABUILD PROJECT PVT 8 LANING OF SECTION OF NH-1 (NEW NH-44)FROM MUKARBA CHOWK AT KM.15+500 TO
(GIIPL). Any specifed deviation from this drawing shall be reported to the project NATIONAL HIGHWAY AUTHORITY OF INDIA PANIPAT KM 86+000 ON BOT(TOLL) BASIS IN THE STATE OF HARYANA
engineer of GIIPL, and the same shall be revised only project head of GIIPL. No LTD
modification in drawing and deviation from the approved drawing are allowed in the
site.Arrange consumption of Reinforcement steel will be approx 5.5 kg/sqm of facing
2) 7.6M (GEOGRID GG100) 2) 7.3M (GEOGRID GG100) 1) 8.6M (GEOGRID GG100) 1) 7.5M (GEOGRID GG100)
3) 7.3M (GEOGRID GG120) 3) 7.0M (GEOGRID GG100) 2) 7.1M (GEOGRID GG100) 2) 6.8M (GEOGRID GG100)
4) 7.3M (GEOGRID GG120) 4) 7.0M (GEOGRID GG120) 3) 6.8M (GEOGRID GG120) 3) 6.5M (GEOGRID GG100)
5) 7.3M (GEOGRID GG150) 5) 7.0M (GEOGRID GG150) 4) 6.8M (GEOGRID GG120) 4) 6.5M (GEOGRID GG120)
6) 7.3M (GEOGRID GG150) 6) 7.0M (GEOGRID GG150) 5) 6.8M (GEOGRID GG150) 5) 6.5M (GEOGRID GG150)
7) 7.3M (GEOGRID GG200) 7) 7.0M (GEOGRID GG200) 6) 6.8M (GEOGRID GG150) 6) 6.5M (GEOGRID GG150)
8) 7.3M (GEOGRID GG200) 8) 7.0M (GEOGRID GG200) 7) 6.8M (GEOGRID GG200) 7) 6.5M (GEOGRID GG200)
9) 7.3M (GEOGRID GG200) 9) 7.0M (GEOGRID GG200) 8) 6.8M (GEOGRID GG200) 8) 6.5M (GEOGRID GG200)
10) 7.3M (GEOGRID GG250) 10) 7.0M (GEOGRID GG200) 9) 6.8M (GEOGRID GG200) 9) 6.5M (GEOGRID GG200)
11) 7.3M (GEOGRID GG250) 11) 7.0M (GEOGRID GG250) 10) 6.8M (GEOGRID GG250) 10) 6.5M (GEOGRID GG200)
12) 7.6M (GEOGRID GG250) 12) 7.3M (GEOGRID GG250) 11) 7.1M (GEOGRID GG250) 11) 6.8M (GEOGRID GG250)
13) 8.6M (GEOGRID GG250) 13) 8.3M (GEOGRID GG250) 12) 8.1M (GEOGRID GG250) 12) 7.8M (GEOGRID GG250)
Note:
This Drawing is furnished solely for the use of or in connection with this project, and
the proprietary informantion shown herein is not to be transmitted to any other
organization without specific authorization by Geosys India Infrastructures Pvt. Ltd. RAVI INFRABUILD PROJECT PVT 8 LANING OF SECTION OF NH-1 (NEW NH-44)FROM MUKARBA CHOWK AT KM.15+500 TO
(GIIPL). Any specifed deviation from this drawing shall be reported to the project NATIONAL HIGHWAY AUTHORITY OF INDIA PANIPAT KM 86+000 ON BOT(TOLL) BASIS IN THE STATE OF HARYANA
engineer of GIIPL, and the same shall be revised only project head of GIIPL. No LTD
modification in drawing and deviation from the approved drawing are allowed in the
site.Arrange consumption of Reinforcement steel will be approx 5.5 kg/sqm of facing
219.54(FRL) 219.09(TCB) 219.50(FRL) 219.05(TCB) 219.44(FRL) 218.99(TCB) 219.36(FRL) 218.91(TCB) 219.28(FRL) 218.83(TCB) 219.18(FRL) 218.73(TC
Q1.40
219.13(TCB) TG4 TG4 TH4 TH4 TH4 TH4 TH4 FA4 FA4 FA4 FB4 FB4 FB4 FC4 FC4 FC4
NOTE :
S4 S4 S4 S4 S4 S4 S4 TA6 TA6 TA6 TA6 TB6 TB6 TB6 TC6 TC6
RL (M) REDUCED LEVEL
Q1.60
FINISHED ROAD LEVEL S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
FRL (M)
(ROAD EDGE) S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
SRL (M)
Q1.60
SERVICE ROAD LEVEL S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
Q1.60
S4 S4 S4 S4 S4 S4 S4 S4 S4
0.5% Slope S4 S4 S4 S4 S4 S4 S4
TCB )M) TOP OF COPING BEAM 0.5% Slope 0.5% Slope
212.39(SRL) S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
LEVELING PAD CENTER
Q1.60
LPS (M) LINE HORIZONTAL SWAY SH4 SH4 SH4 SH4 SH4 SH4 SH4 S4 S4 S4 S4 S4 S4 S4 S4 S4
FROM CENTER LINE OF PH2 PH2 PH2 PH2 PH2 PH2 PH2 P2 P2 P2 P2 P2 P2 P2 P2 P2
MEDIAN
212.39(SRL) 212.39(SRL) 212.38(SRL) 212.37(SRL) 212.37(SRL) 212.36(SRL) 212.36(SR
211.300(TLP)
1.56 1.56
31+311.02 31+271.01
RL : 205.8 M
LENGTH AT WALL FACE 3.94 10 10 10 10 10 10
CHAINAGE 31+313.94 31+310 31+300 31+290 31+280 31+270 31+260 31+250
GROUND LENGTH 0 3.94 13.94 23.94 33.94 43.94 53.94 63.94
DESIGN HEIGHT 30.00(DESIGN HEIGHT=8M) 44.00(DESIGN HEIGHT=7.6M)
L.P.S. LPS=17.06M LPS=17.053M
MATCH LINE-1
TO PANIPAT MATCH LINE-2
TO MUKARBA CHOWK
219.18(FRL) 218.73(TCB) 219.07(FRL) 218.62(TCB) 218.94(FRL) 218.49(TCB) 218.80(FRL) 218.35(TCB) 218.65(FRL) 218.20(TCB) 218.49(FRL) 218.04(TCB) 218.31(FRL) 217.86(TCB) 218.12(FRL) 217.67(TCB) 217.92
FC4 FC4 FD4 FD4
FE2 FE2 FF2 FG2 FG2 FH2 FH2
TC6 TD6 TD6 TE4 TE4 TF4 TF4 TG4 TG4 TH4 FA4 FA4 FB4 FC4 FC4 FD4
FE2 FF2 FG2 FG2
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 TA6 TB6 TB6 TC6 TD6 TE4 TE4 TF4 TG4
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
Drainage Outlet Drainage Outlet
S4 S4 S4 S4 S4
0.5% Slope S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
0.5% Slope S4 S4
0.5% Slope
S4 S4 S4
0.5% Slope
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2
1.56 1.63
31+231.01 31+191.01
10 10 10 10 10 10 10 10
31+250 31+240 31+230 31+220 31+210 31+200 31+190 31+180
63.94 73.94 83.94 93.94 103.94 113.94 123.94 133.94
28.00(DESIGN HEIGHT=7.2M) 22.00(DESIGN HEIGHT=6.8M) 22.00(DESIGN HEIGHT=6.4M)
LPS=17.046M LPS=17.039M LPS=17.032M
NOTE:
1.REINFORCEMENT LENGTH AND TYPE AS PER DESIGN SECTION DRAWING
(DRAWING NO.GIIPL/RIPPL/2020/01/HARYANA-01)
2. ALL DIMENSION & LEVEL ARE IN METER UNLESS OTHERWISE SPECIFIED.
Note:
This Drawing is furnished solely for the use of or in connection with this project, and
the proprietary informantion shown herein is not to be transmitted to any other
organization without specific authorization by Geosys India Infrastructures Pvt. Ltd. RAVI INFRABUILD PROJECT PVT 8 LANING OF SECTION OF NH-1 (NEW NH-44)FROM MUKARBA CHOWK AT KM.15+500 TO
(GIIPL). Any specifed deviation from this drawing shall be reported to the project NATIONAL HIGHWAY AUTHORITY OF INDIA PANIPAT KM 86+000 ON BOT(TOLL) BASIS IN THE STATE OF HARYANA
engineer of GIIPL, and the same shall be revised only project head of GIIPL. No LTD
modification in drawing and deviation from the approved drawing are allowed in the
site.Arrange consumption of Reinforcement steel will be approx 5.5 kg/sqm of facing
10 10 10 10 10 10 10 10
31+180 31+170 31+160 31+150 31+140 31+130 31+120 31+110 31+100
133.94 143.94 153.94 163.94 173.94 183.94 193.94 203.94 213.94
DESIGN HEIGHT=6.4M) 16.00(DESIGN HEIGHT=6.8M) 16.00(DESIGN HEIGHT=6.4M) 16.00(DESIGN HEIGHT=6M) 16.00(DESIGN HEIGHT=5.6M)
LPS=17.032M LPS=17.039M LPS=17.032M LPS=17.025M LPS=17.018M
MATCH LINE-3
TO PANIPAT
31+071.01
10 10 10 10 10 10 10 10 10
31+100 31+090 31+080 31+070 31+060 31+050 31+040 31+030
213.94 223.94 233.94 243.94 253.94 263.94 273.94 283.94
16.00(DESIGN HEIGHT=5.2M) 16.00(DESIGN HEIGHT=4.8M) 16.00(DESIGN HEIGHT=4.4M) 16.00(DESIGN HEIGHT=4M) 16.00(DESIGN HEIGHT=3.6M)
LPS=17.011M LPS=17.004M LPS=16.997M LPS=16.99M LPS=16.983M
NOTE:
1.REINFORCEMENT LENGTH AND TYPE AS PER DESIGN SECTION DRAWING
(DRAWING NO.GIIPL/RIPPL/2020/01/HARYANA-01)
2. ALL DIMENSION & LEVEL ARE IN METER UNLESS OTHERWISE SPECIFIED.
Note:
This Drawing is furnished solely for the use of or in connection with this project, and
the proprietary informantion shown herein is not to be transmitted to any other
organization without specific authorization by Geosys India Infrastructures Pvt. Ltd. RAVI INFRABUILD PROJECT PVT 8 LANING OF SECTION OF NH-1 (NEW NH-44)FROM MUKARBA CHOWK AT KM.15+500 TO
(GIIPL). Any specifed deviation from this drawing shall be reported to the project NATIONAL HIGHWAY AUTHORITY OF INDIA PANIPAT KM 86+000 ON BOT(TOLL) BASIS IN THE STATE OF HARYANA
engineer of GIIPL, and the same shall be revised only project head of GIIPL. No LTD
modification in drawing and deviation from the approved drawing are allowed in the
site.Arrange consumption of Reinforcement steel will be approx 5.5 kg/sqm of facing
FC4 FD4
FE2 FF2 FG2 FH2
TC6 TD6 TE4 TF4 TG4 TH4 FA4 FB4
212.10(SRL)
S4 S4 S4 S4 S4 S4 TA6 TB6
S4 S4 S4 S4 S4 S4 S4 S4
P2 P2 P2 P2 P2 P2 P2 P2
10 10 10
31+030 31+020 31+010 31+000
283.94 293.94 303.94 313.94
N HEIGHT=3.6M) 16.00(DESIGN HEIGHT=3.2M) 8.00(DESIGN HEIGHT=2.8M)
16.983M LPS=16.976M LPS=16.969M
NOTE:
1.REINFORCEMENT LENGTH AND TYPE AS PER DESIGN SECTION DRAWING
(DRAWING NO.GIIPL/RIPPL/2020/01/HARYANA-01)
2. ALL DIMENSION & LEVEL ARE IN METER UNLESS OTHERWISE SPECIFIED.
Note:
This Drawing is furnished solely for the use of or in connection with this project, and
the proprietary informantion shown herein is not to be transmitted to any other
organization without specific authorization by Geosys India Infrastructures Pvt. Ltd. RAVI INFRABUILD PROJECT PVT 8 LANING OF SECTION OF NH-1 (NEW NH-44)FROM MUKARBA CHOWK AT KM.15+500 TO
(GIIPL). Any specifed deviation from this drawing shall be reported to the project NATIONAL HIGHWAY AUTHORITY OF INDIA PANIPAT KM 86+000 ON BOT(TOLL) BASIS IN THE STATE OF HARYANA
engineer of GIIPL, and the same shall be revised only project head of GIIPL. No LTD
modification in drawing and deviation from the approved drawing are allowed in the
site.Arrange consumption of Reinforcement steel will be approx 5.5 kg/sqm of facing
RL : 206.6 M
LENGTH AT WALL FACE 10 10 10 10 10 10 10
CHAINAGE 31+000 31+010 31+020 31+030 31+040 31+050 31+060
GROUND LENGTH 0 10 20 30 40 50 60
DESIGN HEIGHT 6.00(DESIGN HEIGHT=2M) 16.00(DESIGN HEIGHT=2.4M) 16.00(DESIGN HEIGHT=2.8M) 16.00(DESIGN HEIGHT=3.2M) 16.00(DESIGN HEIGHT=3.6M)
L.P.S. LPS=16.955M LPS=16.962M LPS=16.969M LPS=16.976M LPS=16.983M
MATCH LINE-2
TO PANIPAT
MATCH LINE-1
TO MUKARBA CHOWK 216.52(TCB) 216.98(FRL) 216.77(TCB)
216.27(TCB) 216.73(FRL)
216.02(TCB) 216.48(FRL)
215.77(TCB) 216.23(FRL)
215.52(TCB) 215.98(FRL)
215.27(TCB) 215.73(FRL)
215.02(TCB) 215.48(FRL) FH2
215.23(FRL) TH4
FD4 FC4 FB4 FA4 TG4
FG2 FF2 FE2
FH2 S4
FD4 FC4 FB4 FA4 TH4 TG4 TF4 TE4 TD6 TC6 TB6 TA6
FG2 FF2 FE2
FH2 S4
FB4 FA4 TH4 TG4 TF4 TE4 TD6 TC6 TB6 TA6 S4 S4 S4 S4 S4 S4 S4 S4 S4
Drainage Outlet
TC6 TB6 TA6 S4 S4
0.5% Slope S4 S4 S4 S4 S4 S4 S4 0.5% S4
Slope S4 S4
0.5% Slope S4 S4 S4 S4 S4
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2
31+110.96
10 10 10 10 10 10 10 10
31+060 31+070 31+080 31+090 31+100 31+110 31+120 31+130 31+140
70 80 90 100 110 120 130 140
6.00(DESIGN HEIGHT=3.6M) 16.00(DESIGN HEIGHT=4M) 16.00(DESIGN HEIGHT=4.4M) 16.00(DESIGN HEIGHT=4.8M) 16.00(DESIGN HEIGHT=5.2M) 16.00(DESIGN
LPS=16.983M LPS=16.99M LPS=16.997M LPS=17.004M LPS=17.011M LPS=1
NOTE:
1.REINFORCEMENT LENGTH AND TYPE AS PER DESIGN SECTION DRAWING
(DRAWING NO.GIIPL/RIPPL/2020/01/HARYANA-01)
2. ALL DIMENSION & LEVEL ARE IN METER UNLESS OTHERWISE SPECIFIED.
Note:
This Drawing is furnished solely for the use of or in connection with this project, and
the proprietary informantion shown herein is not to be transmitted to any other
organization without specific authorization by Geosys India Infrastructures Pvt. Ltd. RAVI INFRABUILD PROJECT PVT 8 LANING OF SECTION OF NH-1 (NEW NH-44)FROM MUKARBA CHOWK AT KM.15+500 TO
(GIIPL). Any specifed deviation from this drawing shall be reported to the project NATIONAL HIGHWAY AUTHORITY OF INDIA PANIPAT KM 86+000 ON BOT(TOLL) BASIS IN THE STATE OF HARYANA
engineer of GIIPL, and the same shall be revised only project head of GIIPL. No LTD
modification in drawing and deviation from the approved drawing are allowed in the
site.Arrange consumption of Reinforcement steel will be approx 5.5 kg/sqm of facing
10 10 10 10 10 10 10 10 10
31+140 31+150 31+160 31+170 31+180 31+190 31+200 31+210
140 150 160 170 180 190 200 210
16.00(DESIGN HEIGHT=5.6M) 18.00(DESIGN HEIGHT=6M) 20.00(DESIGN HEIGHT=6.4M) 22.00(DESIGN HEIGHT=6.8M)
LPS=17.018M LPS=17.025M LPS=17.032M LPS=17.039M
MATCH LINE-4
MATCH LINE-3 TO PANIPAT
TO MUKARBA CHOWK
219.28(FRL) 218.91(TCB) 219.36(FRL) 218.99(TCB) 219.44(FRL) 219.05(TCB)
219.07(FRL) 218.73(TCB) 219.18(FRL) 218.83(TCB)
218.80(FRL) 218.49(TCB) 218.94(FRL) 218.62(TCB)
218.65(FRL) 218.35(TCB)
FD4 FD4 FC4 FC4 FC4 FB4 FB4 FB4 FA4 FA4 FA4 FA4 FA4
FG2 FF2 FF2 FE2 FE2
FH2 FH2
TH4 TH4 TG4 TG4 TF4 TE4 TE4 TE4 TD6 TD6 TC6 TC6 TB6 TB6 TB6 TA6 TA6 TA6 TA6 TA6
TA6 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
Drainage Outlet Drainage Outlet
S4 S4 S4 S4 S4 S4
0.5% Slope
S4 S4
0.5% Slope S4 S4 S4 S4 S4 S4 S4 0.5% S4
Slope S4 S4
0.5% Slope S4 S4 S4
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2
31+230.94 31+270.94
10 10 10 10 10 10 10 10
31+210 31+220 31+230 31+240 31+250 31+260 31+270 31+280
210 220 230 240 250 260 270 280
30.00(DESIGN HEIGHT=7.2M) 64.00(DESIGN HEIGHT=7.6M)
LPS=17.046M LPS=17.053M
NOTE:
1.REINFORCEMENT LENGTH AND TYPE AS PER DESIGN SECTION DRAWING
(DRAWING NO.GIIPL/RIPPL/2020/01/HARYANA-01)
2. ALL DIMENSION & LEVEL ARE IN METER UNLESS OTHERWISE SPECIFIED.
Note:
This Drawing is furnished solely for the use of or in connection with this project, and
the proprietary informantion shown herein is not to be transmitted to any other
organization without specific authorization by Geosys India Infrastructures Pvt. Ltd. RAVI INFRABUILD PROJECT PVT 8 LANING OF SECTION OF NH-1 (NEW NH-44)FROM MUKARBA CHOWK AT KM.15+500 TO
(GIIPL). Any specifed deviation from this drawing shall be reported to the project NATIONAL HIGHWAY AUTHORITY OF INDIA PANIPAT KM 86+000 ON BOT(TOLL) BASIS IN THE STATE OF HARYANA
engineer of GIIPL, and the same shall be revised only project head of GIIPL. No LTD
modification in drawing and deviation from the approved drawing are allowed in the
site.Arrange consumption of Reinforcement steel will be approx 5.5 kg/sqm of facing
TH4R.1.36
FH2 FH2
Q1.30
FA4 FA4 FA4 FA4 FA4 TH4 TH4 219.13(TCB)
TA6 TA6 TA6 TA6 TA6 TA6 S4 S4
SR4-1.36SR4-1.36SR4-1.36
Q1.60
S4 S4 S4 S4 S4 S4 S4
S4 S4 S4 S4 S4 S4 S4
Q1.60
S4 S4 S4 S4 S4 S4 S4
S4 S4 S4 S4 S4 S4 S4
Drainage Outlet DRAINAGE PIPE
Q1.60
S4 S4 S4 S4 S4 S4 S4
0.5% Slope
SHR4-1.36
S4 S4 S4 S4 S4 S4 S4
212.32(SRL)
Q1.60
S4 S4 S4 S4 S4 SH4 SH4
P2 P2 P2 P2 P2 PH2 PH2
10 10 10 3.94
31+290 31+300 31+310 31+313.94
290 300 310 313.94
10.00(DESIGN HEIGHT=8M)
LPS=17.06M
NOTE:
1.REINFORCEMENT LENGTH AND TYPE AS PER DESIGN SECTION DRAWING
(DRAWING NO.GIIPL/RIPPL/2020/01/HARYANA-01)
2. ALL DIMENSION & LEVEL ARE IN METER UNLESS OTHERWISE SPECIFIED.
Note:
This Drawing is furnished solely for the use of or in connection with this project, and
the proprietary informantion shown herein is not to be transmitted to any other
organization without specific authorization by Geosys India Infrastructures Pvt. Ltd. RAVI INFRABUILD PROJECT PVT 8 LANING OF SECTION OF NH-1 (NEW NH-44)FROM MUKARBA CHOWK AT KM.15+500 TO
(GIIPL). Any specifed deviation from this drawing shall be reported to the project NATIONAL HIGHWAY AUTHORITY OF INDIA PANIPAT KM 86+000 ON BOT(TOLL) BASIS IN THE STATE OF HARYANA
engineer of GIIPL, and the same shall be revised only project head of GIIPL. No LTD
modification in drawing and deviation from the approved drawing are allowed in the
site.Arrange consumption of Reinforcement steel will be approx 5.5 kg/sqm of facing
34.02
TGR4-1.51
SL4-1.42SL4-1.42 SL4-1.42SL4-1.42 TGL4-1.42
RL (M) REDUCED LEVEL
FG2 FG2 FG2 FG2 FG2 FG2 FG2 FG2
Q1.40
Q1.30
FINISHED ROAD LEVEL Outer edge of TG4 TG4 TG4 TG4 TG4 TG4 TG4 Outer edge of
FRL (M)
(ROAD EDGE) crash barrier crash barrier
S4 S4 S4 S4 S4 S4 S4 S4
SR2-1.51
SRL (M) SERVICE ROAD LEVEL
Q1.60
Q1.60
S4 S4 S4 S4 S4 S4 S4
TLP (M) TOP OF LEVELLING PAD S4 S4 S4 S4 S4 S4 S4 S4
W2 RHS
SR2-1.51
W1 LHS
Q1.60
Q1.60
TCB )M) TOP OF COPING BEAM S4 S4 S4 S4 S4 S4 S4
SHR4-1.51 SHR4-1.51
Drainage Outlet
LINE HORIZONTAL SWAY 0.5% Slope
Q1.60
Q1.60
LPS (M) S4 Slope
0.5% S4 S4 S4 S4 S4 S4
FROM CENTER LINE OF
MEDIAN S4 S4 S4 S4 S4 S4 S4 S4
Q1.60
Q1.60
SH4 SH4 SH4 SH4 SH4 SH4 SH4 212.39(SRL)
PH2 PH2 PH2 PH2 PH2 PH2 PH2 PH2
211.300(TLP) 1.86
211.300(TLP)
34.31
RL : 205.8 M
LENGTH AT WALL FACE 34.31
CHAINAGE 31+313.94 31+313.94
GROUND LENGTH 0.0 34.31
DESIGN HEIGHT 34.31(DESIGN HEIGHT=8M)
NOTE:
1.REINFORCEMENT LENGTH AND TYPE AS PER DESIGN SECTION DRAWING
(DRAWING NO.GIIPL/RIPPL/2020/01/HARYANA-01)
2. ALL DIMENSION & LEVEL ARE IN METER UNLESS OTHERWISE SPECIFIED.
Note:
This Drawing is furnished solely for the use of or in connection with this project, and
the proprietary informantion shown herein is not to be transmitted to any other
organization without specific authorization by Geosys India Infrastructures Pvt. Ltd. RAVI INFRABUILD PROJECT PVT 8 LANING OF SECTION OF NH-1 (NEW NH-44)FROM MUKARBA CHOWK AT KM.15+500 TO
(GIIPL). Any specifed deviation from this drawing shall be reported to the project NATIONAL HIGHWAY AUTHORITY OF INDIA PANIPAT KM 86+000 ON BOT(TOLL) BASIS IN THE STATE OF HARYANA
engineer of GIIPL, and the same shall be revised only project head of GIIPL. No LTD
modification in drawing and deviation from the approved drawing are allowed in the
site.Arrange consumption of Reinforcement steel will be approx 5.5 kg/sqm of facing
RL : 209.8 M
LENGTH AT WALL FACE 10 10 10 10 10 10
CHAINAGE 32+210 32+200 32+190 32+180 32+170 32+160 32+150
GROUND LENGTH 0 10 20 30 40 50 60
DESIGN HEIGHT 20.00(DESIGN HEIGHT=2.4M) 24.00(DESIGN HEIGHT=2.8M) 24.00(DESIGN HEIGHT=3.2M)
L.P.S. LPS=16.962M LPS=16.976M LPS=16.969M LPS=16.976M
4.00(DESIGN HEIGHT=3.2M)
.51(FRL) 216.06(TCB) 216.32(FRL) 215.87(TCB) 216.13(FRL) 215.68(TCB) 215.95(FRL) 215.50(TCB) 215.80(FRL) 215.35(TCB) 215.67(FRL) 215.22(TCB) 215.57(FRL) 215.12(TCB) 215.49(FRL) 215.04(TCB) 215.44(FRL)
FF2 FG2 FG2 FH2
TF4 TG4 TH4 FA4 FA4 FB4 FC4 FC4 FD4
FE2 FE2 FF2 FF2 FG2 FG2 FH2 FH2 FH2 FH2
S4 S4 S4 S4 TA6 TB6 TB6 TC6 TD6 TD6 TE4 TF4 TF4 TG4 TG4 TG4 TH4 TH4 TH4 FA4
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 TA6
P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2
10 10 10 10 10 10 10 10
32+150 32+140 32+130 32+120 32+110 32+100 32+090 32+080
60 70 80 90 100 110 120 130
24.00(DESIGN HEIGHT=3.2M) 24.00(DESIGN HEIGHT=2.8M) 38.00(DESIGN HEIGHT=2.4M)
LPS=16.976M LPS=16.969M LPS=16.962M
NOTE:
1.REINFORCEMENT LENGTH AND TYPE AS PER DESIGN SECTION DRAWING
(DRAWING NO.GIIPL/RIPPL/2020/01/HARYANA-01)
2. ALL DIMENSION & LEVEL ARE IN METER UNLESS OTHERWISE SPECIFIED.
Note:
This Drawing is furnished solely for the use of or in connection with this project, and
the proprietary informantion shown herein is not to be transmitted to any other
organization without specific authorization by Geosys India Infrastructures Pvt. Ltd. RAVI INFRABUILD PROJECT PVT 8 LANING OF SECTION OF NH-1 (NEW NH-44)FROM MUKARBA CHOWK AT KM.15+500 TO
(GIIPL). Any specifed deviation from this drawing shall be reported to the project NATIONAL HIGHWAY AUTHORITY OF INDIA PANIPAT KM 86+000 ON BOT(TOLL) BASIS IN THE STATE OF HARYANA
engineer of GIIPL, and the same shall be revised only project head of GIIPL. No LTD
modification in drawing and deviation from the approved drawing are allowed in the
site.Arrange consumption of Reinforcement steel will be approx 5.5 kg/sqm of facing
10 10 10 10 10 10 10 10
32+070 32+060 32+050 32+040 32+030 32+020 32+010 32+000
140 150 160 170 180 190 200 210
18.00(DESIGN HEIGHT=2.0M) 28.00(DESIGN HEIGHT=2.8M) 40.00(DESIGN HEIGHT=3.2M)
LPS=16.955M LPS=16.969M LPS=16.976M
NOTE:
1.REINFORCEMENT LENGTH AND TYPE AS PER DESIGN SECTION DRAWING
(DRAWING NO.GIIPL/RIPPL/2020/01/HARYANA-01)
2. ALL DIMENSION & LEVEL ARE IN METER UNLESS OTHERWISE SPECIFIED.
Note:
This Drawing is furnished solely for the use of or in connection with this project, and
the proprietary informantion shown herein is not to be transmitted to any other
organization without specific authorization by Geosys India Infrastructures Pvt. Ltd. RAVI INFRABUILD PROJECT PVT 8 LANING OF SECTION OF NH-1 (NEW NH-44)FROM MUKARBA CHOWK AT KM.15+500 TO
(GIIPL). Any specifed deviation from this drawing shall be reported to the project NATIONAL HIGHWAY AUTHORITY OF INDIA PANIPAT KM 86+000 ON BOT(TOLL) BASIS IN THE STATE OF HARYANA
engineer of GIIPL, and the same shall be revised only project head of GIIPL. No LTD
modification in drawing and deviation from the approved drawing are allowed in the
site.Arrange consumption of Reinforcement steel will be approx 5.5 kg/sqm of facing
MATCH LINE-5
TO PANIPAT W5 LHS W3 LHS TO MUKARBA CHOWK
MATCH LINE-6
217.10(TCB) 217.58(FRL) 217.13(TCB) 217.59(FRL) 217.15(TCB) 217.59(FRL) 217.15(TCB) 217.58(FRL) 217.13(TCB) 217.54(FRL) 217.10(TCB) 217.50(FRL) 217.05(TCB)
217.54(FRL)
TC6R.1.4
FD4 FD4 FC4 FC4 FC4 FC4 FC4 FCL4-1.40 FC4 FC4 FC4 FD4 FD4 FD4 FD4 FD4 FD4
TD6 TD6 TD6 TC6 TC6 TC6 TC6 TC6 TC6 TC6 TC6 TD6 TD6 TD6 TD6 TD6 TD6
SR4-1.4 SR4-1.4
S4 S4 S4 S4 S4 S4 S4 Drainage Outlet S4 S4 S4 S4 S4 S4 S4Outlet
Drainage S4 S4 S4
S4 S4 S4 S4 S4 S4
0.5% Slope
S4 PUP AT CH:31+820 S4 S4 S4 S4 S4
0.5% Slope
S4 S4
0.5% Slope
S4 S4
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
P2 P2 P2 P2 P2 P2 P2 PR2-1.4
P2 P2 P2 P2 P2 P2 P2 P2 P2 P2
NOTE:
1.REINFORCEMENT LENGTH AND TYPE AS PER DESIGN SECTION DRAWING
(DRAWING NO.GIIPL/RIPPL/2020/01/HARYANA-01)
2. ALL DIMENSION & LEVEL ARE IN METER UNLESS OTHERWISE SPECIFIED.
Note:
This Drawing is furnished solely for the use of or in connection with this project, and
the proprietary informantion shown herein is not to be transmitted to any other
organization without specific authorization by Geosys India Infrastructures Pvt. Ltd. RAVI INFRABUILD PROJECT PVT 8 LANING OF SECTION OF NH-1 (NEW NH-44)FROM MUKARBA CHOWK AT KM.15+500 TO
(GIIPL). Any specifed deviation from this drawing shall be reported to the project NATIONAL HIGHWAY AUTHORITY OF INDIA PANIPAT KM 86+000 ON BOT(TOLL) BASIS IN THE STATE OF HARYANA
engineer of GIIPL, and the same shall be revised only project head of GIIPL. No LTD
modification in drawing and deviation from the approved drawing are allowed in the
site.Arrange consumption of Reinforcement steel will be approx 5.5 kg/sqm of facing
217.00(TCB) 217.38(FRL) 216.93(TCB) 217.29(FRL) 216.85(TCB) 217.20(FRL) 216.75(TCB) 217.09(FRL) 216.65(TCB) 216.98(FRL) 216.53(TCB) 216.84(FRL) 216.40(TCB) 216.70(FRL)
FD4 FD4
FE2 FE2 FE2 FE2 FF2 FF2 FF2 FG2 FG2 FH2 FH2
TD6 TD6 TE4 TE4 TE4 TE4 TF4 TF4 TF4 TG4 TG4 TH4 FA4 FA4 FA4 FB4 FB4 FC4 FD4 FD4
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 TA6 TA6 TA6 TB6 TB6 TC6 TD6 TD6
S4 S4 S4 S4 S4 S4 S4 S4 S4
Drainage Outlet S4 S4 S4 S4 S4 S4 S4 S4 S4 S4Outlet
Drainage S4
0.5% Slope 0.5% Slope 0.5% Slope 0.5% Slope
0.5% Slope
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2
212.90(SRL) 212.89(SRL) 212.88(SRL) 212.86(SRL) 1.93 212.85(SRL) 212.83(SRL) 212.82(SRL) 212.81(SRL) 1.99
31+747 31+707
10 10 10 10 10 10 10 10
31+780 31+770 31+760 31+750 31+740 31+730 31+720 31+710
430 440 450 460 470 480 490 500
42.00(DESIGN HEIGHT=5.6M) 32.00(DESIGN HEIGHT=5.2M)
LPS=17.018M LPS=17.011M
216.40(TCB) 216.70(FRL) 216.25(TCB) 216.54(FRL) 216.10(TCB) 216.39(FRL) 215.95(TCB) 216.27(FRL) 215.82(TCB) 216.16(FRL) 215.72(TCB) 216.09(FRL) 215.64(TCB) 216.03(FRL) 215.59(TCB) 216.00(FRL) 215.55(TCB)
FD4 FD4
FE2 FE2 FF2 FG2 FG2 FH2 FH2 FH2
TD6 TD6 TE4 TE4 TF4 TG4 TG4 TH4 TH4 FA4 FA4 FB4 FB4 FB4 FB4 FC4 FC4 FC4 FC4 FC4
S4Outlet
Drainage S4 S4 S4 S4 S4 S4 S4 S4 S4 TA6
Drainage Outlet TA6 TB6 TB6 TB6 TB6 TC6 TC6 TC6 TC6 TC6
Drainage Outlet
0.5% Slope 0.5% Slope 0.5% Slope
0.5% Slope
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2
NOTE:
1.REINFORCEMENT LENGTH AND TYPE AS PER DESIGN SECTION DRAWING
(DRAWING NO.GIIPL/RIPPL/2020/01/HARYANA-01)
2. ALL DIMENSION & LEVEL ARE IN METER UNLESS OTHERWISE SPECIFIED.
Note:
This Drawing is furnished solely for the use of or in connection with this project, and
the proprietary informantion shown herein is not to be transmitted to any other
organization without specific authorization by Geosys India Infrastructures Pvt. Ltd. RAVI INFRABUILD PROJECT PVT 8 LANING OF SECTION OF NH-1 (NEW NH-44)FROM MUKARBA CHOWK AT KM.15+500 TO
(GIIPL). Any specifed deviation from this drawing shall be reported to the project NATIONAL HIGHWAY AUTHORITY OF INDIA PANIPAT KM 86+000 ON BOT(TOLL) BASIS IN THE STATE OF HARYANA
engineer of GIIPL, and the same shall be revised only project head of GIIPL. No LTD
modification in drawing and deviation from the approved drawing are allowed in the
site.Arrange consumption of Reinforcement steel will be approx 5.5 kg/sqm of facing
212.70(SRL) 212.68(SRL) 212.67(SRL) 212.65(SRL) 212.64(SRL) 1.74 212.63(SRL) 212.61(SRL) 212.60(SRL) 212.58(SR
2.00
31+627 31+587
10 10 10 10 10 10 10 10
31+630 31+620 31+610 31+600 31+590 31+580 31+570 31+560
580 590 600 610 620 630 640 650
98.00(DESIGN HEIGHT=4.4M) 26.00(DESIGN HEIGHT=4.8M)
LPS=16.997M LPS=17.004M
MATCH LINE-10
TO MUKARBA CHOWK
MATCH LINE-9
TO PANIPAT 217.26(TCB) 217.92(FRL) 217.47(TCB) 218.12(FRL)
217.47(FRL) 217.02(TCB) 217.70(FRL)
217.23(FRL) 216.78(TCB)
217.00(FRL) 216.55(TCB)
216.16(TCB) 216.79(FRL) 216.34(TCB)
216.00(TCB) 216.61(FRL) FF2
FH2 FG2 FG2
FD4 FC4 FB4 FB4 FA4 TH4 TG4 TF4
FG2 FF2 FE2
FH2 S4
FD4 FC4 FB4 FA4 FA4 TH4 TG4 TF4 TE4 TD6 TC6 TB6 TA6 S4 S4 S4
FG2 FF2 FE2 FE2
TF4 TF4 TE4 TD6 TC6 TC6 TB6 TA6 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
S4 S4 S4 S4Outlet
Drainage S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
Drainage Outlet
0.5% Slope
S4 S4 S4 S4 S4
0.5% Slope S4 S4 S4 S4 S4 S4 S4 0.5% S4
Slope S4 S4
0.5% Slope S4 S4 S4 S4 S4
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2
212.60(SRL) 212.58(SRL) 2.02 212.57(SRL) 212.56(SRL) 212.54(SRL) 212.53(SRL) 1.73 212.52(SRL) 212.51(SRL) 212.49
31+547 31+507
10 10 10 10 10 10 10 10
31+550 31+540 31+530 31+520 31+510 31+500 31+490 31+480
660 670 680 690 700 710 720 730
SIGN HEIGHT=4.8M) 20.00(DESIGN HEIGHT=5.2M) 16.00(DESIGN HEIGHT=5.6M) 18.00(DESIGN HEIGHT=6M) 20.00(DESIGN HEIGHT=6.4M)
PS=17.004M LPS=17.011M LPS=17.018M LPS=17.025M LPS=17.032M
NOTE:
1.REINFORCEMENT LENGTH AND TYPE AS PER DESIGN SECTION DRAWING
(DRAWING NO.GIIPL/RIPPL/2020/01/HARYANA-01)
2. ALL DIMENSION & LEVEL ARE IN METER UNLESS OTHERWISE SPECIFIED.
Note:
This Drawing is furnished solely for the use of or in connection with this project, and
the proprietary informantion shown herein is not to be transmitted to any other
organization without specific authorization by Geosys India Infrastructures Pvt. Ltd. RAVI INFRABUILD PROJECT PVT 8 LANING OF SECTION OF NH-1 (NEW NH-44)FROM MUKARBA CHOWK AT KM.15+500 TO
(GIIPL). Any specifed deviation from this drawing shall be reported to the project NATIONAL HIGHWAY AUTHORITY OF INDIA PANIPAT KM 86+000 ON BOT(TOLL) BASIS IN THE STATE OF HARYANA
engineer of GIIPL, and the same shall be revised only project head of GIIPL. No LTD
modification in drawing and deviation from the approved drawing are allowed in the
site.Arrange consumption of Reinforcement steel will be approx 5.5 kg/sqm of facing
10 10 10 10 10 10 10 10 10
31+480 31+470 31+460 31+450 31+440 31+430 31+420 31+410
730 740 750 760 770 780 790 800
20.00(DESIGN HEIGHT=6.4M) 22.00(DESIGN HEIGHT=6.8M) 30.00(DESIGN HEIGHT=7.2M)
LPS=17.032M LPS=17.039M LPS=17.046M
MATCH LINE-11
TO PANIPAT
218.92(TCB) 219.44(FRL) 218.99(TCB) 219.50(FRL) 219.05(TCB) 219.54(FRL) 219.10(TCB) 219.57(FRL) 219.13(TCB) 219.58(FRL)
218.74(TCB) 219.28(FRL) 218.84(TCB) 219.36(FRL)
SR4-1.19SR4-1.19 TGL4-1.4
FG2 FG2
Q1.40
FH2 FH2 FH2 FH2 FH2 FH2
FC4 FC4 FB4 FB4 FB4 FA4 FA4 FA4 FA4 TH4 TH4 TH4 TH4 TH4 TG4 TG4 219.14(TCB)
TC6 TC6 TC6 TB6 TB6 TB6 TA6 TA6 TA6 S4 S4 S4 S4 S4 S4 S4 S4
Q1.60
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
Q1.60
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
SHR4-1.19
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
DRAINAGE PIPE
Q1.60
Drainage Outlet
Drainage Outlet
S4 S4 S4 S4 S4 0.5%S4
Slope S4 S4
0.5% Slope S4 S4 S4 S4 S4 S4 S4 S4
0.5% Slope
ShR4-1.19
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 212.41(SRL)
Q1.60
S4 S4 S4 S4 S4 S4 S4 S4 S4 SH4 SH4 SH4 SH4 SH4 SH4 SH4
P2 P2 P2 P2 P2 P2 P2 P2 P2 PH2 PH2 PH2 PH2 PH2 PH2 PH2 PH2
10 10 10 10 10 10 5.77
31+410 31+400 31+390 31+380 31+370 31+360 31+350 31+344.23
800 810 820 830 840 850 860 865.77
44.00(DESIGN HEIGHT=7.6M) 31.77(DESIGN HEIGHT=8M)
LPS=17.053M LPS=17.06M
NOTE:
1.REINFORCEMENT LENGTH AND TYPE AS PER DESIGN SECTION DRAWING
(DRAWING NO.GIIPL/RIPPL/2020/01/HARYANA-01)
2. ALL DIMENSION & LEVEL ARE IN METER UNLESS OTHERWISE SPECIFIED.
Note:
This Drawing is furnished solely for the use of or in connection with this project, and
the proprietary informantion shown herein is not to be transmitted to any other
organization without specific authorization by Geosys India Infrastructures Pvt. Ltd. RAVI INFRABUILD PROJECT PVT 8 LANING OF SECTION OF NH-1 (NEW NH-44)FROM MUKARBA CHOWK AT KM.15+500 TO
(GIIPL). Any specifed deviation from this drawing shall be reported to the project NATIONAL HIGHWAY AUTHORITY OF INDIA PANIPAT KM 86+000 ON BOT(TOLL) BASIS IN THE STATE OF HARYANA
engineer of GIIPL, and the same shall be revised only project head of GIIPL. No LTD
modification in drawing and deviation from the approved drawing are allowed in the
site.Arrange consumption of Reinforcement steel will be approx 5.5 kg/sqm of facing
TGR4-1.25
FG2 FG2 FG2 FH2 FH2 FH2 FH2 FH2
Q1.40
TG4 TG4 TH4 TH4 TH4 TH4 TH4 FA4 FA4 FA4 FA4 FB4 FB4 FB4 FC4 FC4
NOTE :
S4 S4 S4 S4 S4 S4 S4 S4 TA6 TA6 TA6 TB6 TB6 TB6 TC6 TC6
SL4-1.25SL4-1.25 SL4-1.25
RL (M) REDUCED LEVEL
Q1.60
FINISHED ROAD LEVEL S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
FRL (M)
(ROAD EDGE)
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
SRL (M) SERVICE ROAD LEVEL
Q1.60
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
TLP (M) TOP OF LEVELLING PAD S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
DRAINAGE PIPE Drainage Outlet
Q1.60
Drainage Outlet
TCB )M) TOP OF COPING BEAM S4 Slope
0.5% S4 S4 S4 S4 S4 S4 S4 S4
0.5% Slope S4 S4 S4 S4 S4 S4 S4
0.5% Slope
SHL4-1.25
LEVELING PAD CENTER S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
Q1.60
LINE HORIZONTAL SWAY SH4 SH4 SH4 SH4 SH4 SH4 SH4 S4 S4 S4 S4 S4 S4 S4 S4 S4
LPS (M) 212.32(SRL)
FROM CENTER LINE OF PH2 PH2 PH2 PH2 PH2 PH2 PH2 PH2 P2 P2 P2 P2 P2 P2 P2 P2
MEDIAN
RL : 205.8 M
LENGTH AT WALL FACE 5.77 10 10 10 10 10 10
CHAINAGE 31+344.23 31+350 31+360 31+370 31+380 31+390 31+400 31+410
GROUND LENGTH 0 5.77 15.77 25.77 35.77 45.77 55.77 65.77
DESIGN HEIGHT 32.00(DESIGN HEIGHT=8.0M) 44.00(DESIGN HEIGHT=7.6M)
L.P.S. LPS=17.060M LPS=17.053M
MATCH LINE-1
TO MUKARBA CHOWK MATCH LINE-2
TO PANIPAT
3(TCB) 219.18(FRL) 218.73(TCB) 219.07(FRL) 218.62(TCB) 218.94(FRL) 218.49(TCB) 218.80(FRL) 218.35(TCB) 218.65(FRL) 218.20(TCB) 218.49(FRL) 218.04(TCB) 218.31(FRL) 217.86(TCB) 218.12(FRL) 217.67(TCB)
FC4 FC4 FD4 FD4
FE2 FE2 FF2 FF2 FG2 FG2 FH2
TC6 TC6 TD6 TD6 TE4 TE4 TF4 TF4 TG4 TH4 TH4 FA4 FB4 FB4 FC4 FD4 FD4
FE2 FF2 FG2
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 TA6 TA6 TB6 TB6 TC6 TD6 TE4 TE4 TF4
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 Outlet
Drainage S4 S4 S4 S4
Drainage Outlet
0.5% Slope
S4 S4 S4 S4 S4
0.5% Slope
S4 S4 Slope
0.5% S4 S4 S4 S4 S4 S4 S4 S4
0.5% Slope S4 S4 S4 S4 S4
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2
10 10 10 10 10 10 10 10
31+410 31+420 31+430 31+440 31+450 31+460 31+470 31+480
65.77 75.77 85.77 95.77 105.77 115.77 125.77 135.77
28.00(DESIGN HEIGHT=7.2M) 24.00(DESIGN HEIGHT=6.8M) 20.00(DESIGN HEIGHT=6.4M)
LPS=17.046M LPS=17.039M LPS=17.032M
Note:
This Drawing is furnished solely for the use of or in connection with this project, and
the proprietary informantion shown herein is not to be transmitted to any other
organization without specific authorization by Geosys India Infrastructures Pvt. Ltd. RAVI INFRABUILD PROJECT PVT 8 LANING OF SECTION OF NH-1 (NEW NH-44)FROM MUKARBA CHOWK AT KM.15+500 TO
(GIIPL). Any specifed deviation from this drawing shall be reported to the project NATIONAL HIGHWAY AUTHORITY OF INDIA PANIPAT KM 86+000 ON BOT(TOLL) BASIS IN THE STATE OF HARYANA
engineer of GIIPL, and the same shall be revised only project head of GIIPL. No LTD
modification in drawing and deviation from the approved drawing are allowed in the
site.Arrange consumption of Reinforcement steel will be approx 5.5 kg/sqm of facing
218.12(FRL)
W4 RHS MATCH LINE-3
217.67(TCB) 217.92(FRL) 217.47(TCB) TO PANIPAT
217.70(FRL) 217.25(TCB) 217.47(FRL) 217.02(TCB) 217.23(FRL) 216.78(TCB) 217.00(FRL) 216.54(TCB) 216.79(FRL) 216.34(TCB) 216.61(FRL)
FF2 216.15(TCB) 216.45(FRL)
FG2 FG2 FH2
TF4 TG4 TH4 FA4 FB4 FC4 FC4 FD4
FE2 FF2 FG2
S4 FH2
S4 S4 S4 TA6 TB6 TC6 TD6 TE4 TF4 TG4 TH4 FA4 FB4 FB4 FC4 FD4
FE2 FE2 FF2
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 TA6 TB6 TC6 TD6 TD6 TE4 TF4 TF4
S4 S4 S4 S4 S4 S4 S4 S4 Outlet
Drainage S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 Outlet
Drainage S4 S4
0.5% Slope 0.5% Slope 0.5% Slope
0.5% Slope
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2
31+507.2 31+547.2
10 10 10 10 10 10 10 10
31+480 31+490 31+500 31+510 31+520 31+530 31+540 31+550
135.77 145.77 155.77 165.77 175.77 185.77 195.77 205.77
20.00(DESIGN HEIGHT=6.4M) 18.00(DESIGN HEIGHT=6.0M) 16.00(DESIGN HEIGHT=5.6M) 20.00(DESIGN HEIGHT=5.2M) 28.00(DE
LPS=17.032M LPS=17.025M LPS=17.018M LPS=17.001M
MATCH LINE-3
MATCH LINE-4
TO MUKARBA CHOWK
TO PANIPAT
216.15(TCB) 216.45(FRL) 216.00(TCB) 216.31(FRL) 215.86(TCB) 216.20(FRL) 215.75(TCB) 216.11(FRL) 215.66(TCB) 216.05(FRL) 215.60(TCB) 216.01(FRL) 215.56(TCB) 215.99(FRL) 215.54(TCB) 216.00(FRL) 215.55(T
10 10 10 10 10 10 10 10
31+560 31+570 31+580 31+590 31+600 31+610 31+620 31+630
215.77 225.77 235.77 245.77 255.77 265.77 275.77 285.77
28.00(DESIGN HEIGHT=4.8M) 96.00(DESIGN HEIGHT=4.4M)
LPS=17.004M LPS=16.997M
Note:
This Drawing is furnished solely for the use of or in connection with this project, and
the proprietary informantion shown herein is not to be transmitted to any other
organization without specific authorization by Geosys India Infrastructures Pvt. Ltd. RAVI INFRABUILD PROJECT PVT 8 LANING OF SECTION OF NH-1 (NEW NH-44)FROM MUKARBA CHOWK AT KM.15+500 TO
(GIIPL). Any specifed deviation from this drawing shall be reported to the project NATIONAL HIGHWAY AUTHORITY OF INDIA PANIPAT KM 86+000 ON BOT(TOLL) BASIS IN THE STATE OF HARYANA
engineer of GIIPL, and the same shall be revised only project head of GIIPL. No LTD
modification in drawing and deviation from the approved drawing are allowed in the
site.Arrange consumption of Reinforcement steel will be approx 5.5 kg/sqm of facing
FD4 FD4
FG2 FG2 FF2 FF2 FE2
FH2 FH2
FC4 FC4 FC4 FC4 FC4 FB4 FB4 FB4 FB4 FA4 FA4 TH4 TH4 TG4 TF4 TF4 TF4 TE4 TD6 TC6
TC6 Outlet
Drainage TC6 TC6 TC6 TC6 TB6 TB6 TB6 TB6 TA6 TA6 Outlet
Drainage S4 S4 S4 S4 S4 S4 S4 S4 S4 Drainage O
0.5% Slope 0.5% Slope
0.5% Slope 0.5% Slope
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2
31+627.2 31+667.2
10 10 10 10 10 10 10 10
31+630 31+640 31+650 31+660 31+670 31+680 31+690 31+700
285.77 295.77 305.77 315.77 325.77 335.77 345.77 355.77
28.00(DESIGN HEIGHT=4.8M)
LPS=17.004M
MATCH LINE-6
MATCH LINE-5 TO PANIPAT
TO MUKARBA CHOWK
216.84(TCB) 217.38(FRL) 216.92(TCB) 217.44(FRL) 216.99(TCB) 217.50(FRL)
216.64(TCB) 217.20(FRL) 216.75(TCB) 217.29(FRL)
216.39(TCB) 216.98(FRL) 216.52(TCB) 217.09(FRL)
216.25(TCB) 216.84(FRL)
FD4
FG2 FG2 FG2 FF2 FF2 FF2 FE2 FE2 FE2 FE2
FH2 FH2
FD4 FC4 FC4 FB4 FB4 FA4 FA4 TH4 TH4 TG4 TG4 TF4 TF4 TF4 TE4 TE4 TE4 TE4 TD6 TD6
TD6 TC6 TC6 TB6 TB6 TA6 TA6 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
S4 S4 Outlet
Drainage S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 Outlet
Drainage S4 S4 S4 S4 S4 S4 S4 S4
0.5% Slope 0.5% Slope 0.5% Slope
0.5% Slope 0.5% Slope
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2
31+707.2 31+747.2
10 10 10 10 10 10 10 10
31+700 31+710 31+720 31+730 31+740 31+750 31+760 31+770 31+780
355.77 365.77 375.77 385.77 395.77 405.77 415.77 425.77 435.77
30.00(DESIGN HEIGHT=5.2M) 46.00(DESIGN HEIGHT=5.6M)
LPS=17.011M LPS=17.018M
Note:
This Drawing is furnished solely for the use of or in connection with this project, and
the proprietary informantion shown herein is not to be transmitted to any other
organization without specific authorization by Geosys India Infrastructures Pvt. Ltd. RAVI INFRABUILD PROJECT PVT 8 LANING OF SECTION OF NH-1 (NEW NH-44)FROM MUKARBA CHOWK AT KM.15+500 TO
(GIIPL). Any specifed deviation from this drawing shall be reported to the project NATIONAL HIGHWAY AUTHORITY OF INDIA PANIPAT KM 86+000 ON BOT(TOLL) BASIS IN THE STATE OF HARYANA
engineer of GIIPL, and the same shall be revised only project head of GIIPL. No LTD
modification in drawing and deviation from the approved drawing are allowed in the
site.Arrange consumption of Reinforcement steel will be approx 5.5 kg/sqm of facing
217.50(FRL) 215.70(TCB) 217.54(FRL) 217.09(TCB) 217.58(FRL) 217.12(TCB) 217.59(FRL) 217.14(TCB) 217.59(FRL) 217.14(TCB) 217.58(FRL) 217.12(TCB) 217.54(FRL) 217.09(TCB)
TC6L-1.63
FD4 FD4 FD4 FD4 FD4 FC4 FC4 FC4 FC4 FCR4-1.095 FC4 FC4 FC4 FC4 FC4 FD4 FD4
SR4-1.095
TD6 TD6 TD6 TD6 TD6 TD6 TC6 TC6 TC6 TC6 TC6 TC6 TC6 TC6 TD6 TD6
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
SL4-1.63SL4-1.63
SR4-1.095 SR4-1.095
S4 S4 S4 S4 Outlet
Drainage S4 S4 S4 S4 S4 S4 Drainage Outlet S4 S4 S4 S4 S4 S4
PUP AT CH:31+820
0.5% Slope 0.5% Slope
0.5% Slope
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 PL2-1.63 P2 P2 P2 P2 P2 P2
31+787.2 31+827.2
10 10 10 10 3.3 3.30 10 10
31+780 31+790 31+800 31+810 31+813.3 31+820 31+826.7 31+830 31+840 31+850
435.77 445.77 455.77 465.77 475.77 485.77 495.77 505.77
39.00(DESIGN HEIGHT=6.0M) 41.53(DESIGN HEIGHT=6.0M)
LPS=17.025M LPS=17.025M
.54(FRL) 217.09(TCB) 217.50(FRL) 217.05(TCB) 217.44(FRL) 216.99(TCB) 217.38(FRL) 216.92(TCB) 217.29(FRL) 216.84(TCB) 217.20(FRL) 216.75(TCB) 217.09(FRL) 216.64(TCB) 216.98(FRL) 216.52(TCB) 216.84(FRL)
10 10 10 10 10 10
31+850 31+860 31+870 31+880 31+890 31+900 31+910 31+920
505.77 515.77 525.77 535.77 545.77 555.77 565.77 575.77
HEIGHT=6.0M) 38.00(DESIGN HEIGHT=5.6M) 24.00(DESIGN HEIGHT=5.2M)
7.025M LPS=17.018M LPS=17.011M
Note:
This Drawing is furnished solely for the use of or in connection with this project, and
the proprietary informantion shown herein is not to be transmitted to any other
organization without specific authorization by Geosys India Infrastructures Pvt. Ltd. RAVI INFRABUILD PROJECT PVT 8 LANING OF SECTION OF NH-1 (NEW NH-44)FROM MUKARBA CHOWK AT KM.15+500 TO
(GIIPL). Any specifed deviation from this drawing shall be reported to the project NATIONAL HIGHWAY AUTHORITY OF INDIA PANIPAT KM 86+000 ON BOT(TOLL) BASIS IN THE STATE OF HARYANA
engineer of GIIPL, and the same shall be revised only project head of GIIPL. No LTD
modification in drawing and deviation from the approved drawing are allowed in the
site.Arrange consumption of Reinforcement steel will be approx 5.5 kg/sqm of facing
216.52(TCB) 216.84(FRL) 216.39(TCB) 216.70(FRL) 216.25(TCB) 216.54(FRL) 216.09(TCB) 216.37(FRL) 215.92(TCB) 216.19(FRL) 215.74(TCB) 216.00(FRL) 215.55(TCB) 215.82(FRL) 215.37(TCB) 215.67(FRL) 215.22(TCB)
FB4 FB4 FC4 FC4 FD4
FE2 FE2 FF2 FG2 FG2 FH2
TB6 TC6 TC6 TD6 TD6 TE4 TF4 Outlet
Drainage TF4 TG4 TH4 TH4 FA4 FB4 FC4 FC4 FD4
0.5% Slope FE2 FE2 FF2 FG2
0.5% Slope S4
S4 S4 S4 S4 S4 S4
0.5% Slope
S4 S4 S4 S4 TA6 TB6 TB6 TC6 TD6 TD6 TE4 TF4 TF4 TG4
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
P2 P2 P2 P2 P2 P2
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2
S4 S4 214.05(SRL) 214.22(SRL)
212.90(TLP)
P2 P2
212.10(TLP) 213.21(SRL) 213.35(SRL) 213.52(SRL) 213.70(SRL) 213.87(SRL)
1.97
12.99(SRL) 213.08(SRL)
31+949.2.
10 10 10 10 10 10 10 10
31+930 31+940 31+950 31+960 31+970 31+980 31+990 32+000
585.77 595.77 605.77 615.77 625.77 635.77 645.77 655.77
12.00(DESIGN HEIGHT=4.4M) 24.00(DESIGN HEIGHT=4.0M) 14.00(DESIGN HEIGHT=3.6M) 8.00(DESIGN HEIGHT=2.8M) 28.00(DESIGN HEIGHT=
LPS=16.997M LPS=16.990M LPS=16.983M LPS=16.969M LPS=16.962M
MATCH LINE-10
TO MUKARBA CHOWK
215.67(FRL) 215.22(TCB) 215.92(FRL) 215.09(TCB) 215.43(FRL) 214.98(TCB) 215.35(FRL) 214.90(TCB) 215.29(FRL) 214.84(TCB)
214.87(SRL)
FF2 FG2 FG2 FH2 FH2
TF4 TG4 TG4 TH4 TH4 FA4 FA4 FA4 FB4 FB4 FB4
S4 S4 S4 S4 S4 TA6 TA6 TA6 TA6 TB6 TB6
P2 P2 P2 P2 P2 P2 P2 P2 P2 P2 P2
10 10 10 10
32+000 32+010 32+020 32+030 32+040
655.77 665.77 675.77 685.77 695.77
28.00(DESIGN HEIGHT=2.4M) 23.77(DESIGN HEIGHT=2.0M)
LPS=16.962M LPS=16.955M
Note:
This Drawing is furnished solely for the use of or in connection with this project, and
the proprietary informantion shown herein is not to be transmitted to any other
organization without specific authorization by Geosys India Infrastructures Pvt. Ltd. RAVI INFRABUILD PROJECT PVT 8 LANING OF SECTION OF NH-1 (NEW NH-44)FROM MUKARBA CHOWK AT KM.15+500 TO
(GIIPL). Any specifed deviation from this drawing shall be reported to the project NATIONAL HIGHWAY AUTHORITY OF INDIA PANIPAT KM 86+000 ON BOT(TOLL) BASIS IN THE STATE OF HARYANA
engineer of GIIPL, and the same shall be revised only project head of GIIPL. No LTD
modification in drawing and deviation from the approved drawing are allowed in the
site.Arrange consumption of Reinforcement steel will be approx 5.5 kg/sqm of facing
34.02
FAL4-1.44
RL (M) REDUCED LEVEL 219.13(TCB) 219.13(TCB)
Q1.40
Outer edge of
Q1.40
FINISHED ROAD LEVEL Outer edge of
FRL (M) FA4 FA4 FA4 FA4 FA4 FA4 FA4 FAR4-1.43
(ROAD EDGE) crash barrier crash barrier
TA6 TA6 TA6 TA6 TA6 TA6 TA6 TA6
SR4-1.43
SRL (M) SERVICE ROAD LEVEL
SL4-1.45 SL4-1.45SL4-1.45
Q1.60
Q1.60
S4 S4 S4 S4 S4 S4 S4
TLP (M) TOP OF LEVELLING PAD
W3 LHS S4 S4 S4 S4 S4 S4 S4 S4 W4 RHS
SR4-1.43
Q1.60
Q1.60
TCB )M) TOP OF COPING BEAM S4 S4 S4 S4 S4 S4 S4
LEVELING PAD CENTER
S4 S4 S4 S4 S4 S4 S4 S4
SR4-1.43
LINE HORIZONTAL SWAY DRAINAGE PIPE
Q1.60
Q1.60
LPS (M) Drainage Outlet
FROM CENTER LINE OF S4 Slope
0.5% S4 S4 S4 S4 S4 S4 0.5% Slope
MEDIAN
SHR4-1.43
SHL4-1.45
212.41(SRL) S4 S4 S4 S4 S4 S4 S4 S4 212.41(SRL)
Q1.60
Q1.60
SH4 SH4 SH4 SH4 SH4 SH4 SH4
PH2 PH2 PH2 PH2 PH2 PH2 PH2 PH2
1.65
33+000.00
RL : 209.8 M
LENGTH AT WALL FACE 34.31
CHAINAGE 31+344.23 31+344.23
GROUND LENGTH 0.0 34.312
DESIGN HEIGHT 34.42(DESIGN HEIGHT=8M)
NOTE:
1.REINFORCEMENT LENGTH AND TYPE AS PER DESIGN SECTION DRAWING
(DRAWING NO.GIIPL/RIPPL/2020/01/HARYANA-01)
2. ALL DIMENSION & LEVEL ARE IN METER UNLESS OTHERWISE SPECIFIED.
Note:
This Drawing is furnished solely for the use of or in connection with this project, and
the proprietary informantion shown herein is not to be transmitted to any other
organization without specific authorization by Geosys India Infrastructures Pvt. Ltd. RAVI INFRABUILD PROJECT PVT 8 LANING OF SECTION OF NH-1 (NEW NH-44)FROM MUKARBA CHOWK AT KM.15+500 TO
(GIIPL). Any specifed deviation from this drawing shall be reported to the project NATIONAL HIGHWAY AUTHORITY OF INDIA PANIPAT KM 86+000 ON BOT(TOLL) BASIS IN THE STATE OF HARYANA
engineer of GIIPL, and the same shall be revised only project head of GIIPL. No LTD
modification in drawing and deviation from the approved drawing are allowed in the
site.Arrange consumption of Reinforcement steel will be approx 5.5 kg/sqm of facing
34400
190.
LPS=LEVELING PAD CENTER LINE HORIZONTAL LPS=LEVELING PAD CENTER LINE HORIZONTAL
SWAY FROM CENTER LINE OF MEDIAN SWAY FROM CENTER LINE OF MEDIAN
100
Min1000 75
Re-Wall Slope=1%
180mm Thick SRL/OGL
Outer kerb
NOTE:
DETAIL-X
1: ALL DIMENSION ARE IN MM UNLESS OTHERWISE SPECIFIED.
2: OUTER KERB WITH THE P.C.C TO BE COMPACTED ALONG ALL
LENGTH OF THE RE-WALL
Note:
This Drawing is furnished solely for the use of or in connection with this project, and
the proprietary informantion shown herein is not to be transmitted to any other
organization without specific authorization by Geosys India Infrastructures Pvt. Ltd. RAVI INFRABUILD PROJECT PVT 8 LANING OF SECTION OF NH-1 (NEW NH-44)FROM MUKARBA CHOWK AT KM.15+500 TO
(GIIPL). Any specifed deviation from this drawing shall be reported to the project NATIONAL HIGHWAY AUTHORITY OF INDIA PANIPAT KM 86+000 ON BOT(TOLL) BASIS IN THE STATE OF HARYANA
engineer of GIIPL, and the same shall be revised only project head of GIIPL. No LTD
modification in drawing and deviation from the approved drawing are allowed in the
site.Arrange consumption of Reinforcement steel will be approx 5.5 kg/sqm of facing