21C00056 - As-Staked Plans
21C00056 - As-Staked Plans
APPROACH SLAB "A" : STA. 000 + 206.52 - STA. 000 + 212.52 = 6.0m
BAQUILAN BRIDGE 1 : STA. 000 + 212.52 - STA. 000 + 629.32 = 416.80m
APPROACH SLAB "B" : STA. 000 + 629.32 - STA. 000 + 635.32 = 6.0m
TOTAL = 428.80m
RODIGAR M. LAXAMANA JR. FLORITA Q. DELA CRUZ ARTHUR Q. SANTOS DENISE MARIA M. AYAG ROSELLER A. TOLENTINO
PRESIDENT CHIEF, CONSTRUCTION DIVISION CHIEF, PLANNING AND DESIGN DIVISION OIC - OFFICE OF THE ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
LEADWAY CONST. & DEVT. CORP.
DATE:___________________________ DATE:___________________________ DATE:___________________________ DATE:___________________________ DATE:___________________________
SPECIFICATIONS
5-BM
3
448.00m
400 28.0m 28.0m 28.0m 28.0m 28.0m 28.0m 28.0m 28.0m 28.0m 28.0m 28.0m 28.0m 28.0m 28.0m 28.0m 28.0m 400
250
250
250
250
250
250
250
250
250
250
250
250
250
250
250
250
250
250
250
250
250
250
5 @ 1300 = 6500 250 5 @ 1300 = 6500 250 5 @ 1300 = 6500 250 5 @ 1300 = 6500 250 5 @ 1300 = 6500 5 @ 1300 = 6500 250 5 @ 1300 = 6500 250 5 @ 1300 = 6500 250 5 @ 1300 = 6500 250 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 250 5 @ 1300 = 6500 250 5 @ 1300 = 6500 250 5 @ 1300 = 6500 250 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 250 5 @ 1300 = 6500 250 5 @ 1300 = 6500 250 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 250 5 @ 1300 = 6500 250 5 @ 1300 = 6500 250 5 @ 1300 = 6500 250 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 250 5 @ 1300 = 6500 250 5 @ 1300 = 6500 250 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 250 5 @ 1300 = 6500 250 5 @ 1300 = 6500 250 5 @ 1300 = 6500 250 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 250 5 @ 1300 = 6500 250 5 @ 1300 = 6500 250 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 250 5 @ 1300 = 6500 250 5 @ 1300 = 6500 250 5 @ 1300 = 6500 250 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 250 5 @ 1300 = 6500 250 5 @ 1300 = 6500 250 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 250 5 @ 1300 = 6500 250 5 @ 1300 = 6500 250 5 @ 1300 = 6500 250 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 250 5 @ 1300 = 6500 250 5 @ 1300 = 6500
250
250
250
250
250
250
250
250
250
250
250
250
250
250
250
250
250
250
250
250
250
CONCRETE RAILINGS 250 CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS 250 CONCRETE RAILINGS 250 CONCRETE RAILINGS 250 CONCRETE RAILINGS 250 CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS 250 CONCRETE RAILINGS 250 CONCRETE RAILINGS 250 CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS 250 CONCRETE RAILINGS 250 CONCRETE RAILINGS 250 CONCRETE RAILINGS 250 CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS 250 CONCRETE RAILINGS 250 CONCRETE RAILINGS 250 CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS 250 CONCRETE RAILINGS 250 CONCRETE RAILINGS 250 CONCRETE RAILINGS 250 CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS 250 CONCRETE RAILINGS 250 CONCRETE RAILINGS 250 CONCRETE RAILINGS 250 CONCRETE RAILINGS CONCRETE RAILINGS 250 CONCRETE RAILINGS 250 CONCRETE RAILINGS 250 CONCRETE RAILINGS 250 CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS 250 CONCRETE RAILINGS 250 CONCRETE RAILINGS 250 CONCRETE RAILINGS 250 CONCRETE RAILINGS CONCRETE RAILINGS 250 CONCRETE RAILINGS 250 CONCRETE RAILINGS 250 CONCRETE RAILINGS 250 CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS 250 CONCRETE RAILINGS 250 CONCRETE RAILINGS 250 CONCRETE RAILINGS 250 CONCRETE RAILINGS CONCRETE RAILINGS 250 CONCRETE RAILINGS 250 CONCRETE RAILINGS 250 CONCRETE RAILINGS 250 CONCRETE RAILINGS CONCRETE RAILINGS
3000
3000
2000
3000
3000
3000
2000
3000
3000
3000
3000
3000
3000
2000
2000 3000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 3000 2000 3000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 3000 3000 2000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 3000 2000 3000 3000 3000 3000 3000 3000 3000 3000 2000
ONE LANE
3660
ONE LANE
3660
ONE LANE
3660
ONE LANE
3660
3000
3000
2000
3000
3000
3000
2000
3000
3000
3000
3000
3000
3000
2000
2000 3000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 3000 2000 3000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 3000 3000 2000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 3000 2000 3000 3000 3000 3000 3000 3000 3000 3000 2000
250
BM
5-BM
RCPC
79.19
8831
RCPC
87.87
131
89.18
130
RCPC
BM 2ON TOP OF CONCRETE MONUMENT NUMBER
15.
RCPC 1X.9
88.32
128
RCPC
129
87.32
325
305
315
205 300 310
305
295
300
200 290 295
195
280
190 275
270
185
265
260
180
250
SET NUMBER
175
175
245
170
170
A - SPECIFICATIONS 105
175 160
155
165
160
165
165
240
235
170
155
AURORA
235
150
250
160
155 145
145
145
150
150
170
175
185
180
200
190 195 205 215
220
D - TOPOGRAPHIC PLAN
150 155 165
155
245 140 140 145 150 160
150
135
THIS VICINITY
E - GENERAL NOTES 240
235
145
140
130
NUEVA ECIJA
130
135
145
125
130 125
125
120
120
125
155
160
165
225
G - PIER
125 125
135
220 120 130 170
TARLAC 120
115 110 100
110
H - EXCAVATION SECTIONS
220
135
215 115 120
215
115
N
120
205
125
115 110
105
95
95
100
110
200
115 115
185 90
100 95
80
90
180 85 80
95 90 90
85 75
80
175 85 80
80 75 95
PAMPANGA 75
170 75
75 65
95 70 65
60
55
100 70 65 65 60
160
165 155
105
75
75
60
55
55
BULACAN
155 85 80
90 80
65
55 50
160 60 65
110
50
115
85 45
45
140 115 90 50
75
40
95 45 50
40
135
110
105 100 35
130 45
105 35
40
35
25
110 40
120 115
120 20
125
BATAAN 125 115
180 110
120
170 120
160
170
155 180
165 145
135
135
140 130
135
140
140
K EY MAP 165
7TH 8
160
150
155
145
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: CHECKED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
A 1 2 3 4
STA. 0 + 232.92 STA. 0 + 252.92 STA. 0 + 280.92 STA. 0 + 308.92
EXPANSION FIXED FIXED FIXED EXPANSION
6000 400
5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500
STA. 0 + 206.52
CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS
250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250
250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250
460
SOFFIT EL = 68.117m SOFFIT EL = 68.117m
1500
66.877m 66.577m
3709
1000
63.908m
1000 5000
58.908m
20000
5000
1000
53.908m
5000
DFLMFL=51.00m
DFL100=50.014m DFL50=50.08m
BORE HOLE
DEPTH
0.0
SPT BLOWS
PER 15cm 0 20
48.908m
N -VALUE
30 40 50 50>
1600
1600
1600
1.50m CORING
46.877m 46.577m
1600
1600
6.00m CORING
7.50m CORING
9.00m CORING
10.50m CORING
18000
12.00m CORING
18000
13.50m CORING
15.00m CORING
16.50m CORING
18.00m CORING
19.50m CORING
21.00m CORING
BOBP EL = 27.277m BOBP EL = 26.977m BOBP EL = 26.977m BOBP EL = 26.977m BOBP EL = 26.977m
Ø1.30m PULT = 9,000Kn PULT = 14,000Kn PULT = 14,000Kn PULT = 14,000Kn PULT = 14,000Kn
Ø1.30m Ø1.30m Ø1.30m Ø1.30m
22.50m CORING
25.50m CORING
HYDRAULIC PARAMETERS;
27.00m CORING
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: CHECKED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500
CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS
250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250
250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250
MATCH LINE 1-1
1500
66.577m
20000
1600
1600
1600
1600
1600
46.577m
44.977m
18000
BOBP EL = 26.977m BOBP EL = 26.977m BOBP EL = 26.977m BOBP EL = 26.977m BOBP EL = 26.977m
Ø1.30m PULT = 14,000Kn Ø1.30m PULT = 14,000Kn Ø1.30m PULT = 14,000Kn Ø1.30m PULT = 14,000Kn Ø1.30m PULT = 14,000Kn
HYDRAULIC PARAMETERS;
C.A = 33.808 Km²
Q50= 409.10m³/s, DFL50= 50.08m
Q100= 457.20m³/s, DFL100= 50.14m
Qmfl = 1220.00m³/s, DFLmfl = 51.00m
velmfl = 2.37m/s
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: CHECKED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500
CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS
250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250
250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250
MATCH LINE 2-2
1500
66.577m
DFLMFL=51.00m
DFL100=50.014m DFL50=50.08m
1600
46.577m
44.977m
18000
BOBP EL = 26.977m BOBP EL = 26.977m BOBP EL = 26.977m BOBP EL = 26.977m BOBP EL = 26.977m
Ø1.30m PULT = 14,000Kn Ø1.30m PULT = 14,000Kn Ø1.30m PULT = 14,000Kn Ø1.30m PULT = 14,000Kn Ø1.30m PULT = 14,000Kn
HYDRAULIC PARAMETERS;
C.A = 33.808 Km²
Q50= 409.10m³/s, DFL50= 50.08m
Q100= 457.20m³/s, DFL100= 50.14m
Qmfl = 1220.00m³/s, DFLmfl = 51.00m
velmfl = 2.37m/s
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: CHECKED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
12 13 14 15 B
STA. 0 + 532.92 STA. 0 + 560.92 STA. 0 + 588.92 STA. 0 + 608.92
5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500
CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS
250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250
400 6000
250 250 250 250 250 250 250 250 250 250 250 250 250 250 250
STA. 0 + 635.32
250
MATCH LINE 3-3
500
68.077m 68.077m
460
SOFFIT EL = 68.117m SOFFIT EL = 68.117m
1500
66.577m 66.877m
3709
1000
63.908m
5000
1000
58.908m
20000
5000
1000
53.908m
5970
DFLMFL=51.00m
DFL100=50.014m DFL50=50.08m STRUCTURE EXCAVATION
1600
47.938m
1600
18000
BOBP EL = 26.977m BOBP EL = 26.977m BOBP EL = 26.977m BOBP EL = 26.977m BOBP EL = 27.277m
PULT = 14,000Kn PULT = 14,000Kn PULT = 14,000Kn PULT = 14,000Kn Ø1.30m PULT = 9,000Kn
Ø1.30m Ø1.30m Ø1.30m Ø1.30m
3500 3500 3500
HYDRAULIC PARAMETERS;
C.A = 33.808 Km²
Q50= 409.10m³/s, DFL50= 50.08m
Q100= 457.20m³/s, DFL100= 50.14m
Qmfl = 1220.00m³/s, DFLmfl = 51.00m
velmfl = 2.37m/s
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: CHECKED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
1 2 3 4
BEG. OF BRIDGE STA. 0 + 232.92 STA. 0 + 280.92
BACK OF BACKWALL STA. 0 + 252.92 STA. 0 + 308.92
STA. 000 + 212.52
RDWY ELEV. 70.05m
(INCLUDING ASPHALT OVERLAY) A FIXED FIXED FIXED EXPANSION
3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000
8407
49.79
GRD
BH #01
8408
49.28
GRD
8409
48.78
GRD
3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000
8410
48.72
GRD
8411
49.06
GRD
8412
49.66
GRD
8413
50.76
GRD
8414
50.74
GRD
8415
50.36
GRD
8416
49.96
GRD
8417
50.61
GRD
8418
50.48
GRD
8419
49.83
GRD
8420
50.22
GRD
8421
49.54
GRD
8944
48.80
GRD
8946
47.88
GRD
8947
48.15
GRD
8948
48.81
GRD
8949
50.08
GRD
8950
50.00
GRD 8951
49.65
GRD
HYDRAULIC PARAMETERS;
C.A = 33.808 Km² 8953
49.97
GRD
8955
49.72
GRD
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: CHECKED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
4 5 6 7 8
STA. 0 + 308.92 STA. 0 + 336.92 STA. 0 + 364.92 STA. 0 + 392.92 STA. 0 + 420.92
3000 2000 2000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000
ONE LANE ONE LANE ONE LANE ONE LANE
3660
8432
51.75
GRD
8431
51.27
GRD
3660
8429
50.67
GRD
8428
50.55
GRD
3660 3660
8427
50.53
GRD
3000 2000 2000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 8426
48.61
GRD
3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000
8425
48.48
GRD
8424
48.47
GRD
8964
50.72
GRD
8963
50.51
GRD
8962
50.27
GRD
8961
50.48
GRD
HYDRAULIC PARAMETERS;
C.A = 33.808 Km² 8959
GRD
50.18
8960
49.98
GRD
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: CHECKED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
0
0+32
8 9 10 11 12
STA. 0 + 420.92 STA. 0 + 448.92 STA. 0 + 476.92 STA. 0 + 504.92 STA. 0 + 532.92
28.0m 8436
50.92
GRD
3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000
ONE LANE ONE LANE ONE LANE ONE LANE
3660
8432
51.75
GRD
8431
51.27
GRD
3660
3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000
8982
8980 50.13
49.68 GRD
GRD
8981
49.89
GRD
8983
50.54
GRD 8984
49.95
8979 GRD
48.77
GRD
8978
48.97
GRD
8977
49.25
GRD
0
0+28
8976
49.48
GRD
8975
49.29
GRD
8974
49.00
GRD
8973
48.48
GRD
8972
48.62
GRD
8971
48.95
GRD
8970
50.21
GRD
8969
50.64
GRD
8968
50.71
GRD
8967
49.74
GRD
HYDRAULIC PARAMETERS;
C.A = 33.808 Km²
Q50= 409.10m³/s, DFL50= 50.08m
Q100= 457.20m³/s, DFL100= 50.14m
Qmfl = 1220.00m³/s, DFLmfl = 51.00m
velmfl = 2.37m/s
0
0+26
SURVEYED:
RYAN S. JUAN
ENGINEER II
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: CHECKED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
8459
48.24
GRD
8458
48.46
GRD
N 8455
50.07
GRD
8456
49.60
GRD
8457
48.53
GRD
10221
53.33
GRD
8454
50.24
GRD
9607
57.64
GRD
10280
57.19
8453 GRD
50.69
GRD
8452
49.53
GRD
10220
53.74
GRD
10297
48.60
GRD
8451
50.21
GRD
10281
56.24
GRD
8450
49.14
GRD
9608
56.86
GRD
10219
52.51
8449 GRD
49.21
GRD
8448
49.57
GRD
8447
50.07
GRD
12 8446
49.59
GRD
13 14 15 9609
51.97
GRD
STA. 0 + 532.92 STA. 0 + 560.92 STA. 0 + 588.92 STA. 0 + 608.92 END OF BRIDGE 9610
48.22
GRD
BACK OF BACKWALL
8445
50.19
STA. 000 + 629.32
B
GRD
10296
48.48
GRD
10282
54.38
GRD
10218
51.28
GRD
5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 5 @ 1300 = 6500 8997
51.41
GRD
CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS CONCRETE RAILINGS
250 250 250 250 250 250 250 250 250 250 250 250 250 250
250 250 250 250 250 250 250 250 250
8996
48.26
GRD
2000 2000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000
8995
47.92
GRD
8994
48.18
GRD 10217
52.02
GRD
10283
53.88
GRD
8993
48.28
GRD
8992
48.63
GRD
MATCH LINE 3-3
8990
49.42
GRD
10295
48.02
GRD
8989
49.58
GRD
10216
51.03
GRD
10284
52.58
GRD
2000 2000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000 3000 3000 3000 3000 2000 2000 3000 3000 3000
250
10215
50.51
GRD
10285
52.05
GRD
10294
47.77
GRD
8988
49.08
GRD
10213
50.55
GRD
8987
48.95
GRD
8986
49.98
GRD
8985
49.78
GRD
8982
50.13
GRD
10338
49.90
8981 GRD
49.89
GRD 10286
50.83
GRD
8983
50.54
GRD 8984
49.95
GRD
10214
49.59
GRD
10189 10190
49.36 49.24
EDGE
EDGE
10191
49.35
EDGE
10293
47.82
GRD
8999
49.40
GRD
9000
48.12
GRD
10292
48.06
GRD
9001
47.38
GRD
9002
47.82
GRD
10291
48.83
GRD
9003
48.89
GRD
9004
49.64
GRD
HYDRAULIC PARAMETERS;
C.A = 33.808 Km² 9005
49.23
GRD
10340
48.81
GRD
9011
48.48
GRD
9012
47.75
GRD
9013
48.13
GRD
9014
49.10
GRD
9017
49.70
GRD
9016
49.26
GRD
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: CHECKED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
5-BM
END OF BRIDGE
BEG. OF BRIDGE BACK OF BACKWALL
BACK OF BACKWALL STA. 000 + 629.32
STA. 000 + 212.52 RDWY ELEV. 70.05m
(INCLUDING ASPHALT OVERLAY)
RDWY ELEV. 70.05m
(INCLUDING ASPHALT OVERLAY)
B
A
10204
98.38
52.61
9684
GRD
GRD
92.85
10186
GRD
58.75
9600
GRD
52.15
9683
GRD
GRD
GRD 70.34
10209 96.30
10185
52.61
8526
GRD
50.71
8520
GRD
8525
52.21
GRD
GRD 56.87
10227
51.68
9682
GRD
61.61
10274
GRD
8521
50.27
8522
50.68
GRD GRD
GRD
49.99
9681
GRD
50.60
8523
8524
GRD 51.38
GRD
68.49
10257
9601
GRD
0+380
58.76
GRD
50.29
10300
10210
70.31
GRD
10226
GRD
55.90
58.34
9602
GRD
101.18
10202
GRD
9680
GRD
GRD 50.39 60.11
10275
98.35
10201
GRD
79.10
9929
GRD
GRD 54.95
10225
51.10
9679
GRD
10256
68.16
GRD
GRD
79.35
9747
79.46
9928
GRD
9678
GRD 50.44
GRD
78.82
9748
10184
9605
77.95
9749
8463
54.86
93.11
GRD 49.03 GRD GRD GRD
94.18
10183
50.45
8464
GRD GRD
GRD
50.29
8465
GRD
57.76
9603
50.86
9677
GRD 9604
56.18
GRD
8466
GRD 50.04
8468
GRD 50.56
50.55
8467
GRD
52.01
8470
GRD
49.24
8462
GRD
51.84
8469
GRD
GRD
50.91
9676
50.48
8471
GRD
52.14
9675
GRD
8472
GRD
49.93
50.40
8473
77.33
GRD 9750
GRD
9674
52.40
GRD
10224
53.78
GRD
10255
GRD 68.48
58.56
10276
GRD
10299
GRD
49.05
0+360
GRD
69.66
10211
GRD
52.49
9673
58.10
10277
GRD
9926
GRD
79.49
10223
53.46
GRD
GRD 103.70
10199
79.69
9927
GRD
101.01
10200
GRD
GRD
52.09
9672
10182
92.07
GRD
10181
68.08
GRD
10254
GRD 93.68
57.79
10278
GRD
GRD
50.06
9671
76.52
9752
GRD
9670
49.84
GRD
GRD
77.17
9753
57.02
9606
GRD
9669
49.69
GRD
GRD 76.01
9751
10222
GRD
52.51
50.44
9668
GRD
GRD
48.01
10298 67.48
10253
GRD
57.38
10279
GRD
8460
47.97
GRD
52.26
8461
GRD
GRD
66.80
10212
GRD
48.24
8459
GRD
48.46
8458
GRD
48.53
8457
0+340
10221
53.33
8456
GRD 49.60 GRD
9925
GRD 80.45
10252
66.71
GRD
8455
GRD
50.07
10246
74.02
GRD
80.36
9924
GRD
GRD
57.64
9607
GRD
72.23
10247
8454
GRD
50.24
10248
71.43
GRD
10280
57.19
GRD
69.07
10249
GRD
GRD
53.74
10220
8453
GRD
10251
65.68
50.69 GRD
49.53
8452
GRD
104.55
10198
GRD
10250
GRD
65.16
10297
48.60
GRD
56.24
10281
GRD
9608
GRD
56.86
GRD
96.60
10179
GRD
95.09
10180 GRD 98.02
10178
50.21
8451
GRD
52.51
10219
GRD
49.14
8450
GRD
49.21
8449
GRD
ACCESS ROAD
81.44
9922
GRD 49.57
8448
GRD
51.97
9609
GRD
74.09
9755
GRD
73.88
9754
GRD
75.10
9756
GRD
GRD
48.22
9610
GRD
81.11
9923
50.07
8447
GRD
57.56
8998
GRD
GRD
0+320
54.38
10282
49.59
8446
GRD
10296
48.48
GRD
GRD
51.28
10218
48.40
9611
GRD
8997
51.41
GRD
8445
GRD 50.19
51.14
8444
GRD
48.26
8996
GRD
8441
50.20
GRD
8440 50.51
8443
GRD
GRD
49.69
8439
GRD 49.21 49.93
8442
GRD
49.62
8438
GRD
20.0m
GRD
50.08
8437
5 @ 1300 = 6500
10329
68.35
47.92
8995
GRD
250
GRD
GRD
20.0m
5 @ 1300 = 6500 250
CONCRETE RAILINGS 250
10283
53.88
50.92
8436
GRD
250 250
GRD
250
5 @ 1300 = 6500 CONCRETE RAILINGS 48.18
8994
GRD
8993
250
CONCRETE RAILINGS
48.28
GRD
250 250
250
5 @ 1300 = 6500 CONCRETE RAILINGS 3000
28.0m
5 @ 1300 = 6500 250 3000
48.63
8992
CONCRETE RAILINGS 3000
5 @ 1300 = 6500 250
GRD
2000
250 2000
250 250
CONCRETE RAILINGS 3000 3000
5 @ 1300 = 6500 CONCRETE RAILINGS 3000
GRD
51.55
8434
51.01
8433
GRD
10328
64.51
28.0m 5 @ 1300 = 6500 250
250 3000 3000 0+640
GRD
250 250
CONCRETE RAILINGS 2000
3000
5 @ 1300 = 6500 CONCRETE RAILINGS 3000 2000
5 @ 1300 = 6500 250
CONCRETE RAILINGS 250
3000 3000
5 @ 1300 = 6500 250
CONCRETE RAILINGS 250
3000 3000 0+620
28.0m
250
3000 3000
5 @ 1300 = 6500 CONCRETE RAILINGS 250
3000
5 @ 1300 = 6500 250
CONCRETE RAILINGS 250 2000
2000
0+600
10245
GRD
250 250 3000 3000 74.51
49.15
8991
28.0m
5 @ 1300 = 6500 250
CONCRETE RAILINGS 250
3000 3000 GRD
416.80m
5 @ 1300 = 6500 250
250 2000 2000
3000 0+580
250 250
CONCRETE RAILINGS 3000 3000
250
5 @ 1300 = 6500 CONCRETE RAILINGS 3000
5 @ 1300 = 6500 CONCRETE RAILINGS 250
3000 3000 0+560
28.0m 5 @ 1300 = 6500 250
250 3000 3000 48.02
10295
GRD
250 250
CONCRETE RAILINGS 2000
3000
CONCRETE RAILINGS
10216
5 @ 1300 = 6500 2000
51.03
5 @ 1300 = 6500 250
3000 3000 GRD
250 250
CONCRETE RAILINGS 250
3000 3000 0+540 3000 3000 0+680
250
5 @ 1300 = 6500 CONCRETE RAILINGS 3000 3000 2000
2000 3000
28.0m
5 @ 1300 = 6500 250 3000 49.42
8990
3000
GRD
CONCRETE RAILINGS 3000 3000
5 @ 1300 = 6500 250
CONCRETE RAILINGS 250 2000
2000
0+520 3000 3000
10284
3000
52.58
5 @ 1300 = 6500 250
CONCRETE RAILINGS 250
3000 3000 49.58
8989
GRD
GRD
5 @ 1300 = 6500 250
250
51.75
8432
CONCRETE RAILINGS
GRD
72.95
9758
5 @ 1300 = 6500 3000 3000 3000
GRD
51.27
8431
5 @ 1300 = 6500 CONCRETE RAILINGS 250
GRD
9757
CONCRETE RAILINGS 3000 0+440 3000 3000 GRD 72.55
0+300
CONCRETE RAILINGS 250
3000 2000 3000
5 @ 1300 = 6500 250
CONCRETE RAILINGS 250
3000 3000 3000 3000
5 @ 1300 = 6500 250
3000 3000 3000
28.0m 250 250
CONCRETE RAILINGS 250
3000 0+420 3000 2000
2000
3000
250
5 @ 1300 = 6500 CONCRETE RAILINGS 3000 3000 3000
55.58
5 @ 1300 = 6500 CONCRETE RAILINGS 250
3000 2000 2000
3000 3000 10313
GRD
51.19
8430
5 @ 1300 = 6500 250 3000 2000
10215
50.51
82.68
9919
GRD
50.67
8429
5 @ 1300 = 6500 3000 3000 GRD
2000 3000
5 @ 1300 = 6500
250
CONCRETE RAILINGS 250
3000 3000 0+360 3000 3000 2000
GRD
CONCRETE RAILINGS 250
3000 2000
50.55
8428
3000
5 @ 1300 = 6500 250
CONCRETE RAILINGS 250
3000 3000 3000
250
3000 0+340 3000 3000 3000
CONCRETE RAILINGS 3000 3000 2000
2000
3000 3000 3000 3000
3000 2000 2000 3000
3000 0+320 3000 3000 3000 10314
54.23
3000 3000 3000 3000 52.05
10285
GRD GRD
3000 2000
0+700
10176
3000 2000
93.65
3000 3000 0+300 3000 3000 GRD
2000
2000
3000 3000 10339
GRD
3000 3000 3000 3000 52.07
GRD
3000 50.55
10213
3000
0+260 3000 3000 3000
2000
3000
2000
3000
0+240 3000 3000 3000
3000 3000
3000 3000
2000
0+220 3000 2000
GRD
3000 3000 50.53
8427
3000 3000
3000
GRD
0+200
49.08
8988
3000 50.83
10286
GRD
3000
GRD
2000 2000
49.90
10338
3000 3000
3000
0+180 3000 3000 3000
GRD
3000 3000 48.61
8426
49.59
10214
GRD
GRD
2000
75.63
10244
2000
3000 3000
3000
10190
0+160 3000 49.36
10189 49.24
GRD
3000 3000 48.95
8987 EDGE EDGE
68.52
GRD
10191
49.35
2000
EDGE
49.79
8407
GRD
2000
3000 3000
3000
8986
10293
GRD
49.98
49.28
8408 GRD
47.82
GRD
73.65
9760
GRD
9543
GRD
GRD
82.48 82.08
9544
49.78
8985
GRD
8999
GRD 49.40
50.44
10287
GRD
GRD
48.78
8409
50.13
8982
8984
8981 GRD 50.54
8983
GRD GRD 49.95
GRD
49.89
49.68
8980
GRD
10316
61.13
9759
GRD 73.23
GRD
8979
48.77
GRD
GRD
48.72
8410
GRD
48.12
9000
10175
GRD
91.39
8411 48.06
10292
GRD
49.06 GRD
49.66
GRD
8412
GRD 48.97
8978
49.25
8977
GRD
GRD
81.67
50.76
8413 10240
GRD
47.38
9001
GRD
10241
78.33
49.48
8976 GRD
GRD
0+72
8975
49.29
GRD
GRD
80.98
10239
0
50.74
8414
GRD
49.00
8974
GRD
50.36
8415
GRD
8425
0+280
GRD 48.48
GRD
58.25
10315
48.48
8973
GRD 75.24
10242
GRD
63.12
10317
GRD
10331
GRD
49.96
8416
48.47
10288
8424
66.78
50.61
8417
GRD 10291 GRD
48.83
GRD GRD GRD 49.84
9002
GRD
47.82
GRD
48.62
8972
9003
10243
73.84
50.48
8418 GRD 48.89 GRD
GRD
9762
GRD
76.19
60.65
10318 GRD
9761
GRD 74.90
49.83
8419
GRD
10013
81.63
GRD
8420
GRD
50.22
49.64
9004
GRD
48.95
8971
GRD
50.21
8970
GRD
53.16
10342
GRD
69.54
10332
GRD
GRD
49.54
8421
GRD 50.64
8969
GRD
49.23
9005
8968
GRD
50.71
10012
GRD 80.94
8422
GRD 49.04
GRD
GRD
49.74
8967 48.76
9006
10341
49.26
GRD
8423
48.16
GRD
48.38
9007
GRD
8965
49.39
8966
GRD
GRD 50.03
9008
50.72
8964 GRD 48.84
GRD
GRD
48.81
10340
8963
GRD
50.51
GRD
50.27
8962
GRD
48.80
8944
48.62
8945
GRD
8961
GRD
50.48
GRD 49.17
10289
47.88
8946
GRD
9009
BM
48.87
GRD
GRD 48.61
10290
48.62