Elect Sub Station Signal Cabin Locomotive Shed Watch Tower at ETP
Station Building Equipment and Gen. at
and Gen. for Pump House-T1 Laksam Jn. at Laksam Jn. Laksam Jn. at Laksam Jn.
T-2 Building Type 1 Laksam Jn.
Signalling (8 Nos.) Station Station Station Station
(7 Nos.) (12 Nos.) Station
(7 Nos.) (1 No.) (1 No.) (1 No.) (1 No.)
(1 No.)
Locations 7 12 7 1 8 1 1 1 1
500 P 17.00 4.00 1.00 1.00 1.00 17.00 20.00 2.00 2.00
300 S 17.00 4.00 1.00 1.00 1.00 17.00 20.00 1.00 1.00
PO1 1.00 1.00 - 4.00 27.00 - -
PO2 - - - - - - 20.00 - -
40 TL 31.00 11.00 8.00 10.00 4.00 47.00 115.00 3.00 3.00
20 BL 21.00 3.00 - 2.00 - 3.00 2.00 3.00 -
20 OBL - - - - - - - -
20 CL 33.00 6.00 - - - 26.00 44.00 14.00 -
20 ML - - - - - 3.00 1.00 -
150 AR - - - - - - - - -
150 LK - - - - - - 50.00 - -
300 PFM - - - - - - - - -
100 FOB - - - - - - - -
100 LSP - - - - - - 56.00 - -
20 GL 4.00 - - - - - - - -
10 OGL 4.00 - - - - - - - -
10 WT - - - - - - - - -
80 PS - - - - - - - - -
80 CF 16.00 5.00 - 1.00 - 21.00 40.00 1.00 -
80 WBF 1.00 - - - - - - -
80 Fan Hook - 1.00 3.00 3.00 2.00 1.00 - 1.00
500 EXP 8 3.00 2.00 2.00 1.00 6.00 9 1 1
Total Load (Per Location) 21400 W 5800 W 2360 W 2560 W 1620 W 20820 W 42380 W 2360 W 2000 W
Station Buildings
Fouzderhat
Total 44.03 kW
Bhatiyari
Type-2 Station Building 21400 W
Platform Shed 16960 W
Platform 6000 W
Footover Bridge 3800 W
Sub-Station & Generator 2360 W
Type-1 Pump House 1620 W
Approach Road 1800 W
Total 53.94 kW
Kumira
Total 46.24 kW
Sitakund
Total 46.24 kW
Baro-Takia
Total 45.94 kW
Nangalkot
Total 43.09 kW
Fajilpur
Total 42.63 kW
Foot Over Bridge Foot Over Bridge
Gate Lodge / Gate Lodge / Foot Over Bridge Foot Over Bridge at Laksam Jn. at Laksam Jn. Track Machine & Road Cum Rail Road Cum Rail Air Compressor
Platform Shed Platform Shed
Goomty Type A Goomty Type B Type 1 at Fouzderhat Station Station Tamping Shed Vehicles Shed Vehicles Shed Room
Fouzderhat Bhatiyari
( 17 No.) ( 81 No.) (9 Nos.) (1 No.) Type 1 Type 2 (3 No.) (2 No.) Baraiyadhala (3 Nos.)
(1 No.) (1 No.)
17 81 9 1 1 1 3 2 1 3 1 1
3.00 1.00 - - - - 18.00 4.00 9.00 2.00 - -
3.00 1.00 - - - - 18.00 4.00 9.00 2.00 - -
- - - - - - - - - 1.00 - -
- - - - - - - - - - - -
4.00 2.00 - - - - 40.00 10.00 20.00 3.00 - -
4.00 3.00 - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
1.00 1.00 - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - 38.00 57.00 38.00 18.00 - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - 100.00 200.00
1.00 1.00 - - - - - - - - - 12.00
- - - - - - - - - - - -
1.00 - - - - - - - - - - -
1 1 - - - - - - - 1.00 -
3320 W 1540 W 3800 W 5700 W 3800 W 1800 W 16000 W 3600 W 8000 W 2220 W 8000 W 16960 W
Equipment Buildings
Barabkund Kalidaha
Total 23.6 kW
Laksam Jn.
Signal Cabin
Baraiyadhala Locomotive Shed
Platform Shed
Type-1 Equipment Building 5800 W Platform
Platform Shed 8000 W Footover Bridge Type 1
Platform 4800 W Footover Bridge Type 2
Footover Bridge 3800 W Sub-Station & Generator
Road - Cum - Rail Vehicle Shed 8000 W Type-1 Pump House
Watch Tower
Total 30.4 kW
ETP
Track Machine & Tamping Shed
Road Cum Rail Vehicle
Mirsarai Air Compressor Room
Total
Type-1 Equipment Building 5800 W
Platform Shed 8000 W
Platform 6000 W
Footover Bridge 3800 W
Total 23.6 kW
Mastan Nagar
Chinki Astana
Type-1 Equipment Building 5800 W
Platform Shed 4000 W
Platform 7500 W
Track Machine & Tamping Shed 16000 W
Road Cum Rail Vehicle 3600 W
Air Compressor Room 2220 W
Total 39.12 kW
Muhuriganj
Total 19.8 kW
Feni Jn.
Total 42.02 kW
Sairshadi
Total 17.3 kW
Gunabati
Total 14.8 kW
Hasanpur
Total 17.3 kW
Naoti
1 1 1 1 1 1 1 1 1 1 1 1
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
100.00 100.00 100.00 100.00 100.00 100.00 100.00 50.00 100.00 50.00 50.00 50.00
12.00 - 12.00 - 12.00 - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - -
8960 W 8000 W 8960 W 8000 W 8960 W 8000 W 8000 W 4000 W 8000 W 4000 W 4000 W 4000 W
Kalidaha
9000 W
9 kW
aksam Jn.
20820 W
42380 W
31920 W
6300 W
3800 W
1800 W
2560 W
1620 W
2360 W
2000 W
16000 W
3600 W
2220 W
137.38 kW
Platform Shed
Platform Shed Platform Shed Platform Platform Platform Platform Platform Platform Baro- Platform Mastan
Laksam Jn. Platform Kumira Platform Mirsarai
Nangalkot Naoti Fouzderhat Bhatiyari Barabkund Sitakund Baraiyadhala Takia Nagar
Station
1 1 1 1 1 1 1 1 1 1 1 1
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - 10.00 20.00 20.00 20.00 20.00 16.00 20.00 20.00 20.00
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
50.00 100.00 399.00 - - - - - - - - -
12.00 - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
4960 W 8000 W 31920 W 3000 W 6000 W 6000 W 6000 W 6000 W 4800 W 6000 W 6000 W 6000 W
Platform Approach Approach Approach
Platform Chinki Platform Platform Platform Platform Platform Platform Platform Platform
Platform Feni Laksham Jn Road Road Road
Astana Muhuriganj Fajilpur Kalidaha Sairshadi Gunabati Hasanpur Nangalkot Naoti
Station Fouzderhat Bhatiyari Kumira
1 1 1 1 1 1 1 1 1 1 1 1 1 1
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - 13.00 12.00 14.00
- - - - - - - - - - - - - -
25.00 20.00 24.00 30.00 60.00 25.00 30.00 25.00 35.00 20.00 21.00 - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
7500 W 6000 W 7200 W 9000 W 18000 W 7500 W 9000 W 7500 W 10500 W 6000 W 6300 W 1950 W 1800 W 2100 W
Approach Approach Approach Approach
Road Road Road Road
Sitakund Baro-Takia Fajilpur Nangalkot
1 1 1 1
- -
- -
- - - -
- - - -
- - - -
- - - -
- - - -
- -
- - - -
14.00 12.00 15.00 15.00
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
2100 W 1800 W 2250 W 2250 W
Type - 2 Station Building (2 nos.)
MDB - Chattogram
Box Size : Height- 20”x Width-14”x Depth-5”
Incoming: 1 No 300A TP MCCB
-
Outgoing: 1 No 150A TP MCCB
4 Nos. 100A TP MCCB
Busbar - 600A TPN&E Electrolytic Copper Busbar
DB - (Type-2
Busbar Station
- 300A TPN&E Building, Typical)
Electrolytic Copper Busbar
Box Size : Height- 36”x Width-28”x Depth-5”
Incoming: 1 No 150A TP MCCB
DB - (Platform, Chattogram)
Box Size : Height- 20”x Width-14”x Depth-5”
Incoming: 1 No 100A TP MCCB
Outgoing: 7 Nos 20A TP MCB
6 Nos 20A TP Control Switch -
6 Nos 20A TP Timer & Relay
Busbar - 200A TPN&E Electrolytic Copper Busbar
DB - (Platform Shed, Jhautala)
Box Size : Height- 36”x Width-28”x Depth-5”
Incoming: 1 No 32A TP MCCB
Outgoing: 12 Nos upto 20A SP MCB
10 Nos 5A to 20A SP Control Switch
10 Nos 5A to 20A SP Timer & Relay
Busbar - 60A TPN&E Electrolytic Copper Busbar
DB - (Platform, Jhautala)
Box Size : Height- 20”x Width-14”x Depth-5”
Incoming: 1 No 32A TP MCCB
Outgoing: 3 Nos 20A TP MCB
2 Nos 20A TP Control Switch -
2 Nos 20A TP Timer & Relay
Busbar - 60A TPN&E Electrolytic Copper Busbar
DB - (Platform, Janalihat)
Box Size : Height- 20”x Width-14”x Depth-5”
Incoming: 1 No 32A SP MCB
Outgoing: 3 Nos 20A TP MCB
2 Nos 20A TP Control Switch -
2 Nos 20A TP Timer & Relay
Busbar - 60A TPN&E Electrolytic Copper Busbar
DB - (Platform, Gomdandi)
Box Size : Height- 20”x Width-14”x Depth-5”
Incoming: 1 No 32A SP MCB
Outgoing: 3 Nos 20A TP MCB
2 Nos 20A TP Control Switch -
2 Nos 20A TP Timer & Relay
Busbar - 60A TPN&E Electrolytic Copper Busbar
DB - AB
Box Size : Height- 14”x Width-8”x Depth-5”
Incoming: 1 No 32A SP MCB
DB - D
Box Size : Height- 12”x Width-8”x Depth-5”
Incoming: 1 No 20A SP MCB
DB - C
Box Size : Height- 14”x Width-8”x Depth-5”
Incoming: 1 No 20A SP MCB
DB - BB
Box Size : Height- 14”x Width-8”x Depth-5”
Incoming: 1 No 32A SP MCB
DB - B1
Box Size : Height- 14”x Width-8”x Depth-5”
Incoming: 1 No 40A SP MCB
Outgoing: 4 Nos up to 32A SP MCB
Busbar - 100A SPN&E Electrolytic Copper Busbar
Type - 2 Station Building Substation & Type - 1 Equipment Building (5 nos.)
Generator Building (2 nos.)
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Type - 1 Pump House (5 nos.) Substation & Generator (3 nos)
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Type - 1 Signal Cabin (1 no.) Pologround Signal Cabin (1 no.)
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Platform Shed (Chattogram) (1 no.) Platform (Chattogram) (1 no.)
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Platform Shed (Jhautala) (1 no.) Platform (Jhautala) (1 no.)
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Footover Bridge (Jhautala) (1 no.) Approach Road (Jhautala) (1 no.)
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Platform Shed (Pahartali) (1 no.) Platform (Pahartali) (1 no.)
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Footover Bridge (Pahartali) (1 no.) Approach Road (Pahartali) (1 no.)
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Type - 3 Station Building (1 no.) Platform Shed (Sholashahar) (1 no.)
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
1 -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Platform (Sholashahar) (1 no.) Footover Bridge (Sholashahar) (1 no.)
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Public Toilet (Sholashahar) (1 no.) Approach Road (Sholashahar) (1 no.)
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Platform Shed (Janalihat) (1 no.) Platform (Janalihat) (1 no.)
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Platform Shed (Gomdandi) (1 no.) Platform (Gomdandi) (1 no.)
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Platform Shed (Dhalghat) (1 no.) Platform (Dhalghat) (1 no.)
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Locoshed (SRV Yard) (1 no.) Watch Tower (SRV Yard) (1 no.)
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
ETP (SRV Yard) (1 no.) BG Carriage Depot (CGMY) (1 no.)
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
BG Train Inspection Shed (CGMY) (1 no.) BG Train Washing Shed (CGMY) (1 no.)
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Watch Tower (CGMY) (1 no.) ETP (CGMY) (1 no.)
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Gate Lodge Type - A (12 nos.) Gate Lodge Type - B (37 nos.)
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -