Professional Documents
Culture Documents
2018-11-15 Plumbing System Design Drawing - ALL
2018-11-15 Plumbing System Design Drawing - ALL
2018-11-15 Plumbing System Design Drawing - ALL
DESIGN DRAWING NUMBER REVISION DESIGN DRAWING TITLE SCALE (A3) REMARK
PLUMBING SYSTEM
1 UMRTL1-CP1a-OT-MBS-DS-10010 G PLUMBING SYSTEM DRAWING LIST NTS
5 UMRTL1-CP1a-OT-MBS-DS-10050 G WASTE / FOUL WATER DRAINAGE SYSTEM SCHEMATIC PAGE 1/2 NTS
6 UMRTL1-CP1a-OT-MBS-DS-10060 G WASTE / FOUL WATER DRAINAGE SYSTEM SCHEMATIC PAGE 2/2 NTS
18 UMRTL1-CP1a-OT-MBS-DS-12010 G GROUND FLOOR WASTE / FOUL WATER DRAINAGE SYSTEM - MASTER PLAN 1/1000
19 UMRTL1-CP1a-OT-MBS-DS-12020 G GROUND FLOOR WASTE / FOUL WATER DRAINAGE SYSTEM PLAN 1/3 1/400
20 UMRTL1-CP1a-OT-MBS-DS-12030 G GROUND FLOOR WASTE / FOUL WATER DRAINAGE SYSTEM PLAN 2/3 1/400
21 UMRTL1-CP1a-OT-MBS-DS-12040 G GROUND FLOOR WASTE / FOUL WATER DRAINAGE SYSTEM PLAN 3/3 1/400
22 UMRTL1-CP1a-OT-MBS-DS-12050 G BASEMENT 1 WASTE / FOUL WATER DRAINAGE SYSTEM - MASTER PLAN 1/1000
23 UMRTL1-CP1a-OT-MBS-DS-12060 G BASEMENT 1 WASTE / FOUL WATER DRAINAGE SYSTEM PLAN 1/3 1/400
24 UMRTL1-CP1a-OT-MBS-DS-12070 G BASEMENT 1 WASTE / FOUL WATER DRAINAGE SYSTEM PLAN 2/3 1/400
25 UMRTL1-CP1a-OT-MBS-DS-12080 G BASEMENT 1 WASTE / FOUL WATER DRAINAGE SYSTEM PLAN 3/3 1/400
26 UMRTL1-CP1a-OT-MBS-DS-12090 G BASEMENT 2 WASTE / FOUL WATER DRAINAGE SYSTEM - MASTER PLAN 1/1000
27 UMRTL1-CP1a-OT-MBS-DS-12100 G BASEMENT 2 WASTE / FOUL WATER DRAINAGE SYSTEM PLAN 1/2 1/400
28 UMRTL1-CP1a-OT-MBS-DS-12110 G BASEMENT 2 WASTE / FOUL WATER DRAINAGE SYSTEM PLAN 2/2 1/400
DATE REV. DESCRIPTION THE EMPLOYER / CHỦ ĐẦU TƯ THE ENGINEER / TƯ VẤN GIÁM SÁT THE CONTRACTOR / NHÀ THẦU PREPARED FULL NAME SIGNATURE SCALE / TỶ LỆ FORMAT / KHỔ BẢN VẼ PROJECT HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
NGÀY BẢN THUYẾT MINH NGƯỜI THỰC HIỆN HỌ VÀ TÊN CHỮ KÝ DỰ ÁN BEN THANH-SUOI TIEN SECTION (LINE 1) - PACKAGE: 1a
NOTE: REVISION G
DATE REV. DESCRIPTION THE EMPLOYER / CHỦ ĐẦU TƯ THE ENGINEER / TƯ VẤN GIÁM SÁT THE CONTRACTOR / NHÀ THẦU PREPARED FULL NAME SIGNATURE SCALE / TỶ LỆ FORMAT / KHỔ BẢN VẼ PROJECT HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
NGÀY BẢN THUYẾT MINH NGƯỜI THỰC HIỆN HỌ VÀ TÊN CHỮ KÝ DỰ ÁN BEN THANH-SUOI TIEN SECTION (LINE 1) - PACKAGE: 1a
HI ALARM
WATER STOP
WATER SUPPLY
LOW ALARM
(BY BAS)
2 m3
BT BT BT
Ø20
BY OTHERS CONTRACTORS SCOPE FOR FOUL WATER TREATMENT PLANT
Ø25-CW
METER CABINET G-01
HB
SITE BOUNDARY
Ø32-CW Ø32-CW Ø32-CW Ø32-CW
GL(+2.500)
FROM GOVERMENT
POTABLE WATER MAIN Ø100-CW
WATER METER CABINET Ø25-CW Ø40-CW
ISOLATION (BY CONTRACTOR) Ø100-CW
VALVE PIT AAV-Ø25
1
Ø65-CW Ø65-CW Ø65-CW Ø65-CW
Ø32-CW
Ø20-CW
Ø50-CW
Ø32-CW
Ø20-CW
Ø20-CW
Ø20-CW
Ø20-CW
Ø25-CW
ENTRANCE-1
ENTRANCE-4
Ø40-CW
HVAC MAKE-UP WATER Ø40-CW Ø32-CW Ø20-CW
Ø100-CW
TO ET-6-1
Ø80-CW Ø40-CW EWH-03
ECS PLANT HB HB HB HB
ROOM HB STATION STAFF STAFF PAN
MASTER ROOM TOILET (F) TOILET(M) TRY TOILET(D)
PASSAGE WAY AHU ROOM B1FL(-6.886)
WASTE 2
PIT No.1 3 TO PLAT FORM AREA
Ø65-CW Ø65-CW Ø50-CW Ø50-CW Ø50-CW Ø50-CW Ø40-CW
Ø100-CW
Ø65-CW
WATER TANK Ø40-CW Ø32-CW
Ø100-CW
ROOM
Ø100-CW
Ø40-CW
Ø80-CW
Ø20-CW
Ø20-CW
Ø50-CW
Ø40-CW
Ø32-CW
Ø40-CW
Ø20-CW
Ø80-CW
DOMESTIC WATER TANK-1
Ø20-CW
3
CAPACITY: 145 m
Ø25-CW
FV
WL
FLOAT Ø20-CW
VAVLE DWP-L1
Ø100 HB
HB
AHU DINING RESTING STAFF SHOWER ROOM SHOWER ROOM STAFF
HB PUMP ROOM
FD ROOM ROOM ROOM TOILET (M) (M) (F) TOILET (F) B2FL(-13.886)
FOUL
CONNECT TO
Ø25 - CW FV 3 WATER EWH-01 EWH-02
SUMP PIT PRIMING TANK 1m PIT No.2
(BY FIRE FIGHTING WORK)
Ø100-CW
FV
WL WL
Ø100-OF
B3FL(-20.386)
DATE REV. DESCRIPTION THE EMPLOYER / CHỦ ĐẦU TƯ THE ENGINEER / TƯ VẤN GIÁM SÁT THE CONTRACTOR / NHÀ THẦU PREPARED FULL NAME SIGNATURE SCALE / TỶ LỆ FORMAT / KHỔ BẢN VẼ PROJECT HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
NGÀY BẢN THUYẾT MINH NGƯỜI THỰC HIỆN HỌ VÀ TÊN CHỮ KÝ DỰ ÁN BEN THANH-SUOI TIEN SECTION (LINE 1) - PACKAGE: 1a
Ø32-CW Ø20-CW
1
Ø65-CW
Ø20-CW
Ø20-CW
ENTRANCE-5
ENTRANCE-6
ENTRANCE-2
ENTRANCE-3
Ø32-CW Ø32-CW
Ø40-CW Ø40-CW Ø25-CW
Ø50-CW Ø32-CW Ø25-CW
HB HB HB HB
PASSENGERS PASSENGERS CLEANER CLEANER
TOILET(D) TOILET(D)
TOILET(M) TOILET (F) STORE ROOM B1FL(-6.886)
2 WASTE WASTE WASTE WASTE
3 Ø32-CW Ø32-CW Ø32-CW PIT No.3 PIT No.4 PIT No.6 PIT No.5
Ø20-CW
Ø20-CW
PLATFORM AREA
STAIRCASE U-1
HB
HB HB
Ø25-CW
HB
PLATFORM
AHU AHU ROOM
BASIN SUPERVISIOR
ROOM ROOM PLAT FORM (2) B2FL(-13.886)
WASTE Ø32-CW FOUL Ø20-CW
PIT No.7 WATER
PIT No.1 UNDER PLATFORM
Ø20-CW
HB
PS No.3 B3FL(-20.386)
FOUL
WATER
PIT No.3
DATE REV. DESCRIPTION THE EMPLOYER / CHỦ ĐẦU TƯ THE ENGINEER / TƯ VẤN GIÁM SÁT THE CONTRACTOR / NHÀ THẦU PREPARED FULL NAME SIGNATURE SCALE / TỶ LỆ FORMAT / KHỔ BẢN VẼ PROJECT HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
NGÀY BẢN THUYẾT MINH NGƯỜI THỰC HIỆN HỌ VÀ TÊN CHỮ KÝ DỰ ÁN BEN THANH-SUOI TIEN SECTION (LINE 1) - PACKAGE: 1a
GRID 3, L1F
Ø100-VP
EXSITING Ø100-VP LINE-1 LINE-1
FWTP-01 - FOUL WATER MANHOLE OIL INTERCEPTOR Ø100-VP OIL INTERCEPTOR EXTERNAL MANHOLE OIL INTERCEPTOR EXTERNAL MANHOLE
LINE-1 TREATMENT PLANT MH-04 NO.32A Ø100-VP
FOR LINE-1 NO.73 NO.96
EXTERNAL MANHOLE NO.23
TO CITY DRAIN
GRID 3, L1F
TO CITY DRAIN TO CITY DRAIN
TO CITY DRAIN
Ø100-VP
Ø100-VP
Ø100-VP
GRID 31-32, L4 H
GRID 12, L4 D
Ø100-VP
GRID 1, L1 D
GRID 1, L1 D
GRID 6, L1 G
Ø100-VP Ø100-VP
Ø100-VP
1
2
Ø100-VP 3
4
Ø50-WPP
Ø65-WPP
Ø50-WPP
Ø65-WPP
Ø50-WPP
Ø50-WPP
Ø65-WPP
Ø50-WPP
FOR B1
PASSAGE WAY ECS RM PASSAGE WAY CORRIDOR PASSAGE WAY STAFF TOILET STAFF TOILET PANTRY
CONCOURSE
UPPER SLAB LEVEL F.D. F.D. F.D. AHU RM. F.D. F.D. F.D. (F) (M)
Ø50 VP
Ø50-WP,i=1.67% Ø100-VP
Ø80-WP,i=1.67% Ø100-WP,i=1.67%
5
Ø50-WP,i=1.67% Ø50-WP,i=1.67% 6
UNDER SLAB LEVEL Ø80-WP,i=1.67%
GRID 1, L1 E-F
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø50
Ø65-WPP
Ø100-WP
Ø100-VP
Ø50-WPP
PUMP CAPACITY: PUMP CAPACITY: PUMP CAPACITY: PUMP CAPACITY:
Ø100-WPP
Q= 70 L/min; H= 12mAq Q= 50 L/Min; H= 12mAq Q= 50 L/Min; H= 13mAq Q= 50 L/Min; H= 12mAq
Ø50-WPP
WASTE WATER WASTE WATER WASTE WATER
WASTE WATER PIT NO.1 PIT NO.2 PIT NO.3 PIT NO.4
Ø80-WP
Ø80-WP
Ø65-WPP
Ø50-WP
Ø50-WP
Ø50-VP
PORTABLE FIRE LINE 1 LINE 1
WATER WATER AHU PLATFORM PLATFORM
TEF AHU TANK TANK ROOM ST-01 TVF STAFF TOILET
ROOM ROOM OFFICE COND. DRAIN
F.D. F.D. F.D. LOCKER ROOM(F) ROOM ANCILLARY ROOM STORE DINING ROOM RESTING ROOM (M)
UPPER SLAB LEVEL F.D. F.D. B B, SINK, FD F.D. F.D. F.D. F.D F.D BASIN, SINK BASIN
FIRE
WATER 7
Ø100-WP,i=1.67%
Ø80-WP,i=1.67% Ø100-WP,i=1.67%
Ø50
Ø100-WP,i=1.67%
Ø50
WWP-07 TANK
Ø100 160 M 3
Ø50
Ø50
Q= 50 L/min; H= 18mAq
UNDER SLAB LEVEL OVER FLOW
FWP-02
Ø50
Ø50
WASTE WATER WWP-08 FWP-01 WWP-09 WWP-10
Ø50
Ø50
PUMP CAPACITY:
Ø50
Ø50
Ø50
Ø50
GRID 15-16, L1B
PIT NO.7 PUMP CAPACITY: PUMP CAPACITY: PUMP CAPACITY: PUMP CAPACITY: Q= 50L/min; H= 18mAq
Q= 50L/min; H=20mAq
Q= 50 L/min; H= 19mAq Q= 90 L/min; H= 19mAq Q= 80 L/min; H= 19mAq
WASTE WATER FOUL WATER WASTE WATER WASTE WATER FOUL WATER
PIT NO.8 SUMP PIT No.1 PIT NO.9 PIT NO.10 SUMP PIT No.2
FURTURE WORK
Ø50
Ø50
WWP-12
PUMP CAPACITY:
Ø50-WPP
Q= 50 L/min; H= 11mAq
[TEMPORARY] WASTE WATER
PIT NO.12
LINE 2
PLATFORM
COND. DRAIN
F.D F.D
FURTURE WORK
Ø50
WWP-13
Ø50
WASTE / FOUL WATER DRAINAGE SYSTEM SCHEMATIC FOR LINE-1 (1/2) PUMP CAPACITY:
Q= 50 L/min; H=16mAq
NOTE: REVISION G
DATE REV. DESCRIPTION THE EMPLOYER / CHỦ ĐẦU TƯ THE ENGINEER / TƯ VẤN GIÁM SÁT THE CONTRACTOR / NHÀ THẦU PREPARED FULL NAME SIGNATURE SCALE / TỶ LỆ FORMAT / KHỔ BẢN VẼ PROJECT HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
NGÀY BẢN THUYẾT MINH NGƯỜI THỰC HIỆN HỌ VÀ TÊN CHỮ KÝ DỰ ÁN BEN THANH-SUOI TIEN SECTION (LINE 1) - PACKAGE: 1a
TO CITY DRAIN
GRID 23-24, L1 K
GRID 23, L1 H
Ø100 VP Ø50 VP
1
2
3
4
Ø50-WPP
GRID 13, L1 E
Ø80-WPP
Ø50-WPP
AHU RM.
PASSENGER PASSENGER REFUSE R.M. CLEANER'S FREE CONCOURSE FOR B1
TOILET (M) TOILET (F) STORE ROOM F.D. F.D. UPPER SLAB LEVEL B1FL(-6.886)
Ø100-VP Ø100-VP Ø50-WP,i=1.67%
5
Ø50-VP Ø50-VP Ø100-WP,i=1.67%
6
GRID 24, L1 H
UNDER SLAB LEVEL
Ø50
Ø50
Ø50
Ø50
WWP-05 WWP-06
PUMP CAPACITY: PUMP CAPACITY:
Ø50-WPP
Q= 50 L/Min; H= 12mAq Q= 50 L/Min; H= 12mAq
Ø80-WP
Ø50-WP
Ø80-WPP
Ø100-WP
Ø100-VP
Ø50-VP
Ø50-VP
LINE 1
PLATFORM AUH TVF
STAFF TOILET SHOWER R.M. SHOWER R.M. STAFF TOILET
(M) (M) (F) COND. DRAIN ROOM ROOM LINE 1
(F)
F.D. F.D. F.D. UPPER SLAB LEVEL B2FL(-12.886)
Ø65
7 Ø100-WP,i=1.67% Ø100-WP,i=1.67%
Ø100-WP,i=1.67%
Ø50
Ø50
WWP-11
PUMP CAPACITY:
Q= 50 L/min; H= 20mAq
PLEASE REFER TO THE DRAWING NO. UMRTL1-CP1a-OT-MBS-DS-11005 FOR CONTINUATION
WASTE WATER
PIT NO.11
B3FL(-20.386)
Ø80
Ø80
FWP-03
PUMP CAPACITY:
Q= 80 L/min; H= 26.6mAq
FOUL WATER
SUMP PIT No.3
LINE 2
B4FL(-25.736)
NOTE: REVISION G
DATE REV. DESCRIPTION THE EMPLOYER / CHỦ ĐẦU TƯ THE ENGINEER / TƯ VẤN GIÁM SÁT THE CONTRACTOR / NHÀ THẦU PREPARED FULL NAME SIGNATURE SCALE / TỶ LỆ FORMAT / KHỔ BẢN VẼ PROJECT HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
NGÀY BẢN THUYẾT MINH NGƯỜI THỰC HIỆN HỌ VÀ TÊN CHỮ KÝ DỰ ÁN BEN THANH-SUOI TIEN SECTION (LINE 1) - PACKAGE: 1a
NTS A3 DỰ ÁN XÂY DỰNG TUYẾN ĐƯỜNG SẮT ĐÔ THỊ SỐ 1 TP HỒ CHÍ MINH
6-Nov-2017 A First Submission DESIGNER TUYẾN BẾN THÀNH-SUỐI TIÊN - GÓI THẦU: 1a
HISATOSHI MIZUSAKO
NGƯỜI THIẾT KẾ
19-Dec-2017 B Second Submission DATE OF ISSUE / NGÀY PHÁT HÀNH TITLE BEN THANH STATION
CHECKER TÊN BẢN VẼ NHÀ GA BẾN THÀNH
16-Apr-2018 C Third Submission
NGƯỜI KIỂM TRA
SHOJI MASAKI 15-Nov-2018
25-May-2018 D Fourth Submission WASTE / FOUL WATER DRAINAGE SYSTEM SCHEMATIC
HCMC PEOPLE'S COMMITTE NJPT ASSOCIATION SMCC-CIENCO 4 JOINT VENTURE DESIGN MANAGER
20-Jul-2018 E Fifth Submission
MANAGEMENT AUTHORITY FOR URBAN RAILWAY
SHINYA KONDO
STAGE / GIAI ĐOẠN
PAGE 2/2
LIÊN DANH NJPT LIÊN DANH SMCC-CIENCO 4 CHỦ NHIỆM THIẾT KẾ
15-Sep-2018 F Sixth Submission CONSTRUCTION DESIGN DRAWING NO REV. / BẢN
UBND TP HCM-BAN QUẢN LÝ ĐƯỜNG SẮT ĐÔ THỊ NK-JIC-PBJ-JTC-TEC-TEDI South-TRICC PROJECT MANAGER
KAZUMITSU TAHARA BẢN VẼ SỐ UMRTL1-CP1a-OT-MBS-DS-10060
15-Nov-2018 G Seventh Submission GIÁM ĐỐC DỰ ÁN BẢN VẼ THIẾT KẾ G
ENTRANCE -3
Entrance-1
SC
ENTRANCE -1 ENTRANCE -2
Ø10
RS
0-C
W
TO
BH
AC
W
150k
W
4-
150k
URE
W
3-
150k
FUT
URE
W
for
2-
FUT
150k
URE
for
1-
NTR
FUT
URE
for
FUT
for
EXI Ø20-CW
M
STI
CO
NG
00
P=G 100
RS
WA
L-19
HB
TER
Ø
WWTP
SU Ø32
ROOM
Cooling Tower of
Line1
CW
PPL TEF
YP Ø20
IPE EA
CO
OA
TO WWTP ROOM 5
ISOLATION
VALVE PIT
Top Light
Ø100, Ø32
TO/ FROM B2
BH
Ø1
00- SEE DWG UMRTL1-CP1a-OT-MBS-DS-10070
CW
W
0-C
W
150k
W
BUTTERFLY
4-
Ø2
150k
RE
W
TU
3-
150k
FU
RE
VALVE Ø100
0kW
for
TU
2-
FU
RE
- 15
for
TU
YST
1
FU
RE
for
TU
W
ENTRANCE -6
FU
for
CV CO
OLI
Ø10 Ø3 NG
0-C 2-C TO
W WE
WATER METER BOX POSITION W R
RS
Ø3
SIZE BOX: 1200x500 2-C
W
W
0-C
Ø3
2-C
Ø2
WWTP
W
HB
ROOM
Cooling Tower of
Line1
Ø20 Ø20-CW
TEF
TO WWTP ROOM
CUSHION TANK
EA CUT
G-01 OA
CW
CW
Ø100, Ø32
5
TO/ FROM B2
SCALE 1:400
NOTE: REVISION G
DATE REV. DESCRIPTION THE EMPLOYER / CHỦ ĐẦU TƯ THE ENGINEER / TƯ VẤN GIÁM SÁT THE CONTRACTOR / NHÀ THẦU PREPARED FULL NAME SIGNATURE SCALE / TỶ LỆ FORMAT / KHỔ BẢN VẼ PROJECT HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
NGÀY BẢN THUYẾT MINH NGƯỜI THỰC HIỆN HỌ VÀ TÊN CHỮ KÝ BEN THANH-SUOI TIEN SECTION (LINE 1) - PACKAGE: 1a
1/1000 A3
DỰ ÁN
DỰ ÁN XÂY DỰNG TUYẾN ĐƯỜNG SẮT ĐÔ THỊ SỐ 1 TP HỒ CHÍ MINH
6-Nov-2017 A First Submission DESIGNER 1/400 TUYẾN BẾN THÀNH-SUỐI TIÊN - GÓI THẦU: 1a
HISATOSHI MIZUSAKO
NGƯỜI THIẾT KẾ
19-Dec-2017 B Second Submission DATE OF ISSUE / NGÀY PHÁT HÀNH TITLE BEN THANH STATION
CHECKER TÊN BẢN VẼ NHÀ GA BẾN THÀNH
16-Apr-2018 C Third Submission
NGƯỜI KIỂM TRA
SHOJI MASAKI 15-Nov-2018
25-May-2018 D Fourth Submission GROUND FLOOR
HCMC PEOPLE'S COMMITTE NJPT ASSOCIATION SMCC-CIENCO 4 JOINT VENTURE DESIGN MANAGER STAGE / GIAI ĐOẠN WATER SUPPLY PLAN
20-Jul-2018 E Fifth Submission SHINYA KONDO
MANAGEMENT AUTHORITY FOR URBAN RAILWAY LIÊN DANH NJPT LIÊN DANH SMCC-CIENCO 4 CHỦ NHIỆM THIẾT KẾ
15-Sep-2018 F Sixth Submission CONSTRUCTION DESIGN DRAWING NO REV. / BẢN
UBND TP HCM-BAN QUẢN LÝ ĐƯỜNG SẮT ĐÔ THỊ NK-JIC-PBJ-JTC-TEC-TEDI South-TRICC PROJECT MANAGER
KAZUMITSU TAHARA BẢN VẼ SỐ
UMRTL1-CP1a-OT-MBS-DS-11010
15-Nov-2018 G Seventh Submission GIÁM ĐỐC DỰ ÁN BẢN VẼ THIẾT KẾ G
UMRTL1-CP1a-OT-MBS-DS-11040
Entrance 3
Entrance 2
UMRTL1-CP1a-OT-MBS-DS-11030
Signboard
Ancillary
Room(3)
Front
OA Room(1) Corridor(1) Station Control Room
Ancillary Room(2) Free Concourse
Substation Room Electric Supply Room Signaling Telecommunication
Equipment Room Station Master
EA Station Control Room
Room
Control Panel Space Paid Concourse
Staff Toilet(M)
EPS
Reception Supervisor Window &
Ancillary Room Display Window(3)
Service Substation Room Room(1) Gate Information Room
DPS
EPS
Pantry Ticket Sale Room
(F) Staff Toilet OA TVF
Display Window(2)
Corridor(2)
PS EPS
Toilet(H) Toilet(H) PS
Meeting Room
Toilet(M) Cleaner Free Concourse
Cleaner
Store Room
Toilet(F)
PS
Free Concourse
Entrance 4
UMRTL1-CP1a-OT-MBS-DS-11050
Entrance 6
Entrance 5
DATE REV. DESCRIPTION THE EMPLOYER / CHỦ ĐẦU TƯ THE ENGINEER / TƯ VẤN GIÁM SÁT THE CONTRACTOR / NHÀ THẦU PREPARED FULL NAME SIGNATURE SCALE / TỶ LỆ FORMAT / KHỔ BẢN VẼ PROJECT HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
NGÀY BẢN THUYẾT MINH NGƯỜI THỰC HIỆN HỌ VÀ TÊN CHỮ KÝ DỰ ÁN BEN THANH-SUOI TIEN SECTION (LINE 1) - PACKAGE: 1a
CW
TO ET-6-1
CW
CLOSED EXPANTION TANK ENTRENCE 1
SEE DWG: Ø100, Ø32
UMRTL1-CP1a-OT-MBS-DS-01010 FROM / TO GR FL Pump Room Entrance 1
1
/L OF B
Fee Adjustment Area
COP=H 5
CW Ø2
COP=H/L OF B1
0
CW Ø20
0
ECS Plant Room
CW Ø1
Ø3RS
2 EPS
TEF EV-U1
CW Ø6
COP=H 5 Equipment Hatch
EA
HB /L OF B on Top Slab Ticket Sales Room
1 OA
CW Ø6
1
5
/L OF B
COP=H
CW Ø32
/L OF B1 CW Ø65
Ø20
CW Ø2 COP=H/L OF B1
5
Ø20
COP=H
HB
CW Ø4
0
0
CW Ø8
HB Ancillary
Room(3)
Free Concourse
Top Light on Top Slab
Station Control Room
COP=H/L OF B1
CW Ø65
Front
OA Room(1) Corridor(1) Station Control Room
RISER OPENING REQUIRED 600x1600 Ancillary Room(2)
CW Ø20
Substation Room Electric Supply Room Signaling Telecommunication BASIN
Equipment Room Station Master
EA Station Control Room
Room
Control Panel Space
CW Ø65 CW Ø65
CW Ø50
COP=H/L OF B1
Staff Toilet(M)
EPS
COP=H/L OF B1
Reception
CW Ø40
Ancillary
CW
CW
Room
CW Ø20
Service Substation Room Room(1)
CW
CW
CW
DPS EWH-03
Ø25 Ø32 CW Ø20
GATE VALVE Ø20 Ø100, Ø40, Ø80 Pantry SINK
TO UNDER PLATFORM OF B2 (F) Staff Toilet
(TYPICAL FOR ALL HOSE BIBB) TO/ FROM GR FL COP=H/L OF B1
HB Entrance 4
NOTE: REVISION G
DATE REV. DESCRIPTION THE EMPLOYER / CHỦ ĐẦU TƯ THE ENGINEER / TƯ VẤN GIÁM SÁT THE CONTRACTOR / NHÀ THẦU PREPARED FULL NAME SIGNATURE SCALE / TỶ LỆ FORMAT / KHỔ BẢN VẼ PROJECT HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
NGÀY BẢN THUYẾT MINH NGƯỜI THỰC HIỆN HỌ VÀ TÊN CHỮ KÝ DỰ ÁN BEN THANH-SUOI TIEN SECTION (LINE 1) - PACKAGE: 1a
ENTRANCE 2
F B1
COP= Ø20
H/L O
HB
CW
CO CW
P=
H/ Ø20
LO
PLEASE REFER TO THE DRAWING NO. UMRTL1-CP1a-OT-MBS-DS-11030 FOR CONTINUATION
FB
1
COP=H/L OF B1
EA
CW Ø25
Signboard
EV-U2
Top Light on Top Slab
Free Concourse
Free Concourse
Paid Concourse
CW Ø65 CW Ø32 CW Ø25
COP=H/L OF B1 COP=H/L OF B1 COP=H/L OF B1
Display Window(3)
Gate Information Room
CW Ø65
EPS
Ticket Sale Room
COP=H/L OF B1
OA TVF
CW Ø25
Ticket Vending Machine Room &
Fee Adjustment Machine Room
Display Window(2)
Corridor(2)
PS EPS
Toilet(H) Toilet(H) PS
Meeting Room
Toilet(M) Cleaner Free Concourse
Cleaner
Store Room
Toilet(F) KEY PLAN - B1F
PS
DATE REV. DESCRIPTION THE EMPLOYER / CHỦ ĐẦU TƯ THE ENGINEER / TƯ VẤN GIÁM SÁT THE CONTRACTOR / NHÀ THẦU PREPARED FULL NAME SIGNATURE SCALE / TỶ LỆ FORMAT / KHỔ BẢN VẼ PROJECT HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
NGÀY BẢN THUYẾT MINH NGƯỜI THỰC HIỆN HỌ VÀ TÊN CHỮ KÝ DỰ ÁN BEN THANH-SUOI TIEN SECTION (LINE 1) - PACKAGE: 1a
Free Concourse
CO
CW /L O
P=
Ø2 F B
H
5 1
ENTRANCE 6
Entrance 6
HB
CW Ø20
COP=H/L OF B1
1
FB
P=H 20
/L O
Ø
CW
CO
HB
ENTRANCE 5
Entrance 5
DATE REV. DESCRIPTION THE EMPLOYER / CHỦ ĐẦU TƯ THE ENGINEER / TƯ VẤN GIÁM SÁT THE CONTRACTOR / NHÀ THẦU PREPARED FULL NAME SIGNATURE SCALE / TỶ LỆ FORMAT / KHỔ BẢN VẼ PROJECT HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
NGÀY BẢN THUYẾT MINH NGƯỜI THỰC HIỆN HỌ VÀ TÊN CHỮ KÝ DỰ ÁN BEN THANH-SUOI TIEN SECTION (LINE 1) - PACKAGE: 1a
RS EA duct
TEF TEF Room 1 on B1 Slab
EV Pit on B1 Slab
TEF
AHU Room TVF
TVF Room 1
RS EA
OA Duct on B1 Slab
Line 1 Platform
EV-U2
Platform Supervise Room
Opening Above
on B1 Slab
Line 1 Platform
EA RS
AHU Room TEF
OA TEF Room 2
Staff Toilet(M)
Corridor(1)
Station Meeting Room(1)
Store(1) Pump Room Shower Room(M)
Resting Room PS Shower
Water Tank Room Room
Fire Service Water Tank Room Station Meeting Room(2) Corridor(1)
Linen (F) Staff Locker Store
Closet (M) (〃) (〃) (〃) (M) (M) (M) Toilet(F) Room(F) (2) Store(3)
(F) (F)
DATE REV. DESCRIPTION THE EMPLOYER / CHỦ ĐẦU TƯ THE ENGINEER / TƯ VẤN GIÁM SÁT THE CONTRACTOR / NHÀ THẦU PREPARED FULL NAME SIGNATURE SCALE / TỶ LỆ FORMAT / KHỔ BẢN VẼ PROJECT HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
NGÀY BẢN THUYẾT MINH NGƯỜI THỰC HIỆN HỌ VÀ TÊN CHỮ KÝ DỰ ÁN BEN THANH-SUOI TIEN SECTION (LINE 1) - PACKAGE: 1a
CW
CW
CW
Ø100, Ø40, Ø80
FROM/TO B1 FL
Ø20
RS EA duct HB
TEF TEF Room 1 on B1 Slab
Ø32-CW, F/A TO H/L OF B2 EV Pit on B1 Slab
Ø20
CW Ø32
COP=H AHU Room
/L OF B2 CW Ø32
COP=H
/L OF B
2
OA Duct on B1 Slab HB HB
Line 1 Platform
CW Ø20
BASIN
CW Ø32 Platform Supervise Room
Opening COP= UNDER
on B1 Slab RISER OPENING REQUIRED 600x1600 PLATFORM
CW Ø32
BOP=H/L OF B1 COP=UNDER PL
ATFORM
CW Ø65
COP=H/L OF B2
COP=H/L OF B2
CW Ø100 CW Ø65
CW Ø20
COP=H/L OF B2
Ø20
CW Ø40 CW Ø50
BASIN Staff Toilet(M) CW Ø40
Ø20
CW Ø80 COP=H/L OF B2
Corridor(1) Ø40
SINK HB
FIRE WATER TANK Station Meeting Room(1)
Ø32
COP=H/L OF B2
CW Ø20
Ø50
Ø40
Store(1) Pump Room
HB 160 m3 Resting Room
Shower Room(M)
PS Shower
POTABLE WATER TANK (LINE 1+4) Water Tank Room (UNDER SLAB) HB Room
Fire Service Water Tank Room Station Meeting Room(2)
CAPACITY: 145 m3 Linen (F)
FV Ø100 Closet (M) (〃) (〃) (〃) (M) (M) (M)
10mL x 6mW x 3mH FOUL WATER (F) (F)
CW Ø100 SUMP PIT No.2
Corridor(1) EPS
COP=H/L OF B2 Corridor(2) Corridor(3)
AHU Room
Dining Room
Cylinder Store Locker Room(M)
(M) (〃) (〃) (〃) (〃) (〃) (〃) (〃) (M) (F) (〃) (〃) (F)
PS
SEE PUMP ROOM DETAIL AND SECTIONS ON DWG. UMRTL1-CP1a-OT-MBS-DS-13170 Station Staff Drivers dormitory Station Staff Drivers dormitory
SEE DETAIL OF TOILET AREA ON DWG. UMRTL1-CP1a-OT-MBS-DS-11110
CW
KEY PLAN - B2F NOTE: REVISION G HB Ø20 TO B3 FOUL WATER PIT NO.3
REFER: UMRTL1- CP1a-OT-MBS-DS-12120
DATE REV. DESCRIPTION THE EMPLOYER / CHỦ ĐẦU TƯ THE ENGINEER / TƯ VẤN GIÁM SÁT THE CONTRACTOR / NHÀ THẦU PREPARED FULL NAME SIGNATURE SCALE / TỶ LỆ FORMAT / KHỔ BẢN VẼ PROJECT HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
NGÀY BẢN THUYẾT MINH NGƯỜI THỰC HIỆN HỌ VÀ TÊN CHỮ KÝ DỰ ÁN BEN THANH-SUOI TIEN SECTION (LINE 1) - PACKAGE: 1a
TEF
TVF
TVF Room 1
RS EA
EV-U2
Platform Supervise Room BASIN
SINK Above
HB
HB Line 1 Platform
EA RS
AHU Room TEF
CW Ø20 OA TEF Room 2
COP=UNDER PL
ATFORM
CW Ø40 Ø40
Ø32
COP=H/L OF B2
Ø40
Shower
Room
(F) Staff Locker Store Corridor(1)
Toilet(F) Room(F) (2) Store(3)
Ancillary Room(1)
RTL1- CP1a-OT-MBS-DS-12120
DATE REV. DESCRIPTION THE EMPLOYER / CHỦ ĐẦU TƯ THE ENGINEER / TƯ VẤN GIÁM SÁT THE CONTRACTOR / NHÀ THẦU PREPARED FULL NAME SIGNATURE SCALE / TỶ LỆ FORMAT / KHỔ BẢN VẼ PROJECT HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
NGÀY BẢN THUYẾT MINH NGƯỜI THỰC HIỆN HỌ VÀ TÊN CHỮ KÝ DỰ ÁN BEN THANH-SUOI TIEN SECTION (LINE 1) - PACKAGE: 1a
U7
In Future U8
SUMP PIT FOR EL
V-U3 In Future
CW
Ø20-CW F/A, REFER: UMRT-CP1a-OT-MBS-DS-11070
T/B
1750
1750
TO FIRE TANK
WATER SUPPLY MAIN PIPE DN100 VENT PIPE
GV DN100 ACCESS DOOR TO COOLING TOWER
ACCESS DOOR GV Ø600
OVERFLOW PIPE DN100
Ø600
OVERFLOW
PIPE DN100
MESH
DWT-1
PRESSURE TANK BALL TAP COVER (SVS) DOMESTIC WATER TANK 145 M 3
3000
3000
DWT-1 BALL TAP 10mL x 6mW x 3mH FLEXIBLE CONNECTOR
FLEXIBLE CONNECTOR DOMESTIC WATER TANK 145 M3
10mL x 6mW x 3mH
DN 80
CW DN80
DN 80
600
600
DWP-L1 HOPPER GV50 DRAIN OF TANK 300 1000 1000 300 FOUNDATION HOPPER
FOUNDATION BUTTERFLY VALVE FOUNDATION (BY CIVIL) DRAIN PIPE DN 50
WP DN 100 U/S OF B2
(BY CIVIL) Y STRAINER (BY CIVIL)
FLEXIBLE CONNECTOR
WP DN100 U/S OF B2
PRESSURE TANK
DN100 MAKE UP WATER FROM CITY
WP DN100
U/S OF B2
DWP-L1
(GF)
CV GATE VALVE
BFV
CW DN40
25
CV DN100
DN
0
DN80
10
YST MH
DN
BFV VENT PIPE
HB DN80
EQUALIZING
PIPE DN100
20
GV DN100 GV DN50
DN
DRAIN OF TANK ACCESS DOOR BAL
Ø600 L TA
P
WA DOM CW-
DN1
BA T GV
GV DN50
DRAIN OF TANK
LL
TAP (10m ER TA ESTIC 00
Lx N DN4
6mW K 145 3
F
MH 0 MAK
O.
E UP
x 3m M
DN100
MAINTENANCE TO C WAT
H) ER F
K
OOL ROM
AN
LADDER ING CITY
T
ET
OWE
R (G
FIR
40
F)
DN
TO
DWT-1 HB
DOMESTIC WATER TANK 145 M
460
CW DN100 H/L OF B1
280
WATER SUPPLY TO
80
DWP-L1
DN
BALL TAP UNDER SLAB FIRE
TANK DN100
L) N
IVI TIO
NK
Y C DA
TA
MH Ø25 GV Ø25 MH DN6
(B UN
ER
GV 5
FO
AT
MV MAINTENANCE LADDER
EW
GV DN100 GV DN100
HOPPER
FIR
B1F
,B2F
N
TO
IVI TIO
FLOAT VAVLE VENT PIPE
YC DA
L)
DN100 PARTITION
(B UN
300
FO
6300
DATE REV. DESCRIPTION THE EMPLOYER / CHỦ ĐẦU TƯ THE ENGINEER / TƯ VẤN GIÁM SÁT THE CONTRACTOR / NHÀ THẦU PREPARED FULL NAME SIGNATURE SCALE / TỶ LỆ FORMAT / KHỔ BẢN VẼ PROJECT HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
NGÀY BẢN THUYẾT MINH NGƯỜI THỰC HIỆN HỌ VÀ TÊN CHỮ KÝ DỰ ÁN BEN THANH-SUOI TIEN SECTION (LINE 1) - PACKAGE: 1a
1/100 A3 DỰ ÁN XÂY DỰNG TUYẾN ĐƯỜNG SẮT ĐÔ THỊ SỐ 1 TP HỒ CHÍ MINH
6-Nov-2017 A First Submission DESIGNER TUYẾN BẾN THÀNH-SUỐI TIÊN - GÓI THẦU: 1a
HISATOSHI MIZUSAKO
NGƯỜI THIẾT KẾ
19-Dec-2017 B Second Submission DATE OF ISSUE / NGÀY PHÁT HÀNH TITLE BEN THANH STATION
CHECKER TÊN BẢN VẼ NHÀ GA BẾN THÀNH
16-Apr-2018 C Third Submission
NGƯỜI KIỂM TRA
SHOJI MASAKI 15-Nov-2018
25-May-2018 D Fourth Submission
HCMC PEOPLE'S COMMITTE NJPT ASSOCIATION SMCC-CIENCO 4 JOINT VENTURE
PUMP ROOM DETAIL AND SECTIONS
DESIGN MANAGER STAGE / GIAI ĐOẠN
20-Jul-2018 E Fifth Submission SHINYA KONDO
MANAGEMENT AUTHORITY FOR URBAN RAILWAY LIÊN DANH NJPT LIÊN DANH SMCC-CIENCO 4 CHỦ NHIỆM THIẾT KẾ
15-Sep-2018 F Sixth Submission CONSTRUCTION DESIGN DRAWING NO REV. / BẢN
UBND TP HCM-BAN QUẢN LÝ ĐƯỜNG SẮT ĐÔ THỊ NK-JIC-PBJ-JTC-TEC-TEDI South-TRICC PROJECT MANAGER
KAZUMITSU TAHARA BẢN VẼ SỐ UMRTL1-CP1a-OT-MBS-DS-11100
15-Nov-2018 G Seventh Submission GIÁM ĐỐC DỰ ÁN BẢN VẼ THIẾT KẾ G
Ø65
Ø50 Ø32-CW Ø25-CW
COP=H/L OF B1 COP=H/L OF B1
Ø20 Ø25 Ø25
Ø65 Ø65
Ø50
Ø50
B B
COP=H/L OF B1 UR UR B COP=H/L OF B1 GV GV
B
Ø25
Ø20 Ø32-CW WC
Ø20-CW Ø25-CW
Ø25-CW
WC GV Ø32-CW Ø20
GV
COP= H/L OF B1
Ø32-CW
COP=H/L OF B1 B
GV GV
Ø50-CW
Ø20-CW SINK
SINK
Ø20-CW
Ø40-CW
B
Ø40-CW Ø40-CW
Ø50-CW
Ø20
Ø20
WC WC GV
B WC HB
Ø20-CW SK Ø20-CW
B
Ø25 Ø25
Ø32-CW Ø40-CW
Ø40-CW
B Ø20 WC
Ø40-CW Ø25-CW
ELECTRIC HOT WATER HEATER (EWH-03) Ø20 Ø25 Ø32
Ø32 COP=H/L OF B1
CAPACITY: 50 LITERS, 2.5kW B Ø32-CW
Ø20
Ø32-CW
WC
WC WC WC WC
Ø20-HW B Ø25-CW
Ø32-CW
EHW-03
SK WC
Ø40-CW
GV
Ø25-CW Ø25 Ø20-CW Ø20-CW Ø20-CW
B B B B
Ø20-CW
WC B WC
Ø20
Ø20-HW
UR UR UR UR UR Ø32-CW Ø25 Ø20
WC SINK
B
DETAIL OF TOILET B1F STORAGE WTS DETAIL OF TOILET B1F WC ROOM WTS STORE
SCALE: 1 : 100 SCALE: 1 : 100
Ø65-CW ELECTRIC HOT WATER HEATER (EWH-01) ELECTRIC HOT WATER HEATER (EWH-02)
COP=H/L OF B2 CAPACITY: 150 LITERS, 6 kW CAPACITY: 50 LITERS, 2.5kW
Ø20 Ø50-CW
Ø25 Ø50-CW
GV COP=H/L OF B2
WC WC WC Ø20 Ø25 Ø50-CW-H/L
COP=H/L OF B2
UNDER SLAB
H/L OF B2
Ø40-CW
Ø25
B B B
Ø20-CW
H/L OF B2
Ø32-CW
FOR WASHING MACHINE To B3F
Ø40-CW
FOUL WATER PIT
Ø40-CW
Ø32-HW
No.3
Ø20-CW
Ø32-CW
COP=H/L OF B2 Ø25-CW Ø40-CW
Ø25-CW Ø20 GV
HB HB WC
UR UR UR UR SK SHR Ø25-HW
Ø32-CW
Ø20-CW
WC
Ø20 Ø25 Ø32 Ø32 SHR SHR SHR SHR SHR SHR
STORAGE ROOM
SHR
WC ROOM
SHOWER UNIT BY ARCH, 8SET
Ø20-CW Ø25-CW Ø32-CW Ø20-CW
(C/W SHOWER HEAD & FLOOR DRAIN) B
Ø20-HW Ø25-HW Ø32-HW
Ø25
Ø20-HW
Ø20
KEY PLAN - TOILET B1F
SINK
WC ROOM
MH 03
Entrance-2
W
4-
150k
URE
W
3-
FUT
150k
URE
W
for
2-
150k
FUT
URE
for
1-
FUT
URE
for
FUT
for
MH 01
RS
WWTP
ROOM
Cooling Tower of
Line1
TEF
EA
OA
Top Light
UMRTL1-CP1a-OT-MBS-DS-12040
Entrance-6
Entrance-4
Entrance-5
NOTE: REVISION G
DATE REV. DESCRIPTION THE EMPLOYER / CHỦ ĐẦU TƯ THE ENGINEER / TƯ VẤN GIÁM SÁT THE CONTRACTOR / NHÀ THẦU PREPARED FULL NAME SIGNATURE SCALE / TỶ LỆ FORMAT / KHỔ BẢN VẼ PROJECT HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
NGÀY BẢN THUYẾT MINH NGƯỜI THỰC HIỆN HỌ VÀ TÊN CHỮ KÝ DỰ ÁN BEN THANH-SUOI TIEN SECTION (LINE 1) - PACKAGE: 1a
1/1000 A3 DỰ ÁN XÂY DỰNG TUYẾN ĐƯỜNG SẮT ĐÔ THỊ SỐ 1 TP HỒ CHÍ MINH
6-Nov-2017 A First Submission DESIGNER TUYẾN BẾN THÀNH-SUỐI TIÊN - GÓI THẦU: 1a
HISATOSHI MIZUSAKO
NGƯỜI THIẾT KẾ
19-Dec-2017 B Second Submission DATE OF ISSUE / NGÀY PHÁT HÀNH TITLE BEN THANH STATION
CHECKER TÊN BẢN VẼ NHÀ GA BẾN THÀNH
16-Apr-2018 C Third Submission
NGƯỜI KIỂM TRA
SHOJI MASAKI 15-Nov-2018
25-May-2018 D Fourth Submission GROUND FLOOR
HCMC PEOPLE'S COMMITTE NJPT ASSOCIATION SMCC-CIENCO 4 JOINT VENTURE DESIGN MANAGER STAGE / GIAI ĐOẠN WASTE / FOUL WATER DRAINAGE SYSTEM MASTER PLAN
20-Jul-2018 E Fifth Submission SHINYA KONDO
MANAGEMENT AUTHORITY FOR URBAN RAILWAY LIÊN DANH NJPT LIÊN DANH SMCC-CIENCO 4 CHỦ NHIỆM THIẾT KẾ
15-Sep-2018 F Sixth Submission CONSTRUCTION DESIGN DRAWING NO REV. / BẢN
UBND TP HCM-BAN QUẢN LÝ ĐƯỜNG SẮT ĐÔ THỊ NK-JIC-PBJ-JTC-TEC-TEDI South-TRICC PROJECT MANAGER
KAZUMITSU TAHARA BẢN VẼ SỐ UMRTL1-CP1a-OT-MBS-DS-12010
15-Nov-2018 G Seventh Submission GIÁM ĐỐC DỰ ÁN BẢN VẼ THIẾT KẾ G
MANHOLE No.1 PIPE SIZE PIPE SLOPE PIPE INVERT LEVL MANHOLE MANHOLE
EXSITING MANHOLE No.23 BOX SIZE COVER SIZE REMARKS
UPPER LOWER
Ø1 (mmØ) MANHOLE MANHOLE (mm) (mmØ)
i = 00-W
1% P, Ø80 1/75 GL-600 GL-650 600x600 Ø600
UN MH-01
DE
R MH-02 Ø100 1/100 GL-900 GL-950 600x600 Ø600
GR
FLANGE BOX FOR FUTURE OU
D MH-03 Ø100 1/100 GL-1100 GL-1150 600x600 Ø600
U/G
CAPACITY: 20 m3/DAY
i = 1 0 WP-
H = 3.4m
%
Ø10
MH
04
MH
02
Ø10 VENT CAP
U/G 0
PS
i=
0
1,6
Ø10
FW 7%
TP-
1 Ø8
FLA 0W Ladder
W
NG
150k
P-
W
EB
4-
U/G
150k
RE
OX
W
TU
3-
150k
FU
RE
F
0kW
for
TU
2-
OR
FU
RE
- 15
for
TU
1
FU
FUT
RE
Ø65 Ø50
for
TU
FU
UR
for
U/G U/G E
MH
Ø80 01
Ø65
U/G
Ø65,Ø50,Ø65,Ø65,Ø80,Ø50 RS
RAIN WATER DRAIN TO DISCHANGE ON GROUND
U/G CONNECT TO DRAIN PIPE OF COOLING TOWER BY CIVIL
CONNECT TO VENT CAP
WWTP
ROOM
Cooling Tower
of Line1
TEF
OA
BY CIVIL
EXSITING MANHOLE No.32A SEE DETAIL ON DWG : URMTL1-CP1a-OT-MBS-DS-01080
Ø65,50,65,65,80, 50,100,100,100, 100
FROM WASTE WATER PIT (No.07,No.01,No.08,No.02,FOUL WATER SUMP PIT No.2,No.3,No.1)
OIL INTERCEPTOR
F-1
(H=3.5m)
(W=3.4m)
F-2
(H=3.5m)
(W=3.5m)
Cooling Tower
for Line1
Ventilation Tower (EA)
for Line1
(H=3.5m)
F-5
(H=3.5m)
WPP
P
(W=3.0m)
WP
KEY PLAN - GF Ø50,65
FROM WASTE WATER PIT (NO.2),(NO.9)
NOTE: REVISION G
DATE REV. DESCRIPTION THE EMPLOYER / CHỦ ĐẦU TƯ THE ENGINEER / TƯ VẤN GIÁM SÁT THE CONTRACTOR / NHÀ THẦU PREPARED FULL NAME SIGNATURE SCALE / TỶ LỆ FORMAT / KHỔ BẢN VẼ PROJECT HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
NGÀY BẢN THUYẾT MINH NGƯỜI THỰC HIỆN HỌ VÀ TÊN CHỮ KÝ DỰ ÁN BEN THANH-SUOI TIEN SECTION (LINE 1) - PACKAGE: 1a
1/400 A3 DỰ ÁN XÂY DỰNG TUYẾN ĐƯỜNG SẮT ĐÔ THỊ SỐ 1 TP HỒ CHÍ MINH
6-Nov-2017 A First Submission DESIGNER TUYẾN BẾN THÀNH-SUỐI TIÊN - GÓI THẦU: 1a
HISATOSHI MIZUSAKO
NGƯỜI THIẾT KẾ
19-Dec-2017 B Second Submission DATE OF ISSUE / NGÀY PHÁT HÀNH TITLE BEN THANH STATION
CHECKER TÊN BẢN VẼ NHÀ GA BẾN THÀNH
16-Apr-2018 C Third Submission
NGƯỜI KIỂM TRA
SHOJI MASAKI 15-Nov-2018 GROUND FLOOR
25-May-2018 D Fourth Submission
HCMC PEOPLE'S COMMITTE NJPT ASSOCIATION SMCC-CIENCO 4 JOINT VENTURE
20-Jul-2018 E Fifth Submission
MANAGEMENT AUTHORITY FOR URBAN RAILWAY LIÊN DANH NJPT
DESIGN MANAGER
SHINYA KONDO
STAGE / GIAI ĐOẠN
WASTE / FOUL WATER DRAINAGE SYSTEM PLAN 1/3
LIÊN DANH SMCC-CIENCO 4 CHỦ NHIỆM THIẾT KẾ
15-Sep-2018 F Sixth Submission CONSTRUCTION DESIGN DRAWING NO REV. / BẢN
UBND TP HCM-BAN QUẢN LÝ ĐƯỜNG SẮT ĐÔ THỊ NK-JIC-PBJ-JTC-TEC-TEDI South-TRICC PROJECT MANAGER
KAZUMITSU TAHARA BẢN VẼ SỐ UMRTL1-CP1a-OT-MBS-DS-12020
15-Nov-2018 G Seventh Submission GIÁM ĐỐC DỰ ÁN BẢN VẼ THIẾT KẾ G
UND
ER GRO
P
P, UND
WP
Ø50
FROM WASTE WATER PIT (NO.5)
Ø50-WP
OIL INTERCEPTOR
THROUGH THE UNDERGROUND
F2
EXSITING MANHOLE No.89
Ø50,Ø50
WPP, U/G
P
WP
WP
Ø50,Ø50
FROM WASTE WATER PIT (NO.11,NO.6)
PLEASE REFER TO THE DRAWING NO. UMRTL1-CP1a-OT-MBS-DS-12020 FOR CONTINUATION
F-1
(H=3.5m)
(W=3.4m)
F-2
(H=3.5m)
(W=3.5m)
Cooling Tower
for Line1
Ventilation Tower (EA)
for Line1
(H=3.5m)
F-6
(H=3.5m)
(W=3.0m)
F-5
(H=3.5m)
(W=3.0m)
KEY PLAN - GF
DATE REV. DESCRIPTION THE EMPLOYER / CHỦ ĐẦU TƯ THE ENGINEER / TƯ VẤN GIÁM SÁT THE CONTRACTOR / NHÀ THẦU PREPARED FULL NAME SIGNATURE SCALE / TỶ LỆ FORMAT / KHỔ BẢN VẼ PROJECT HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
NGÀY BẢN THUYẾT MINH NGƯỜI THỰC HIỆN HỌ VÀ TÊN CHỮ KÝ DỰ ÁN BEN THANH-SUOI TIEN SECTION (LINE 1) - PACKAGE: 1a
1/400 A3 DỰ ÁN XÂY DỰNG TUYẾN ĐƯỜNG SẮT ĐÔ THỊ SỐ 1 TP HỒ CHÍ MINH
6-Nov-2017 A First Submission DESIGNER TUYẾN BẾN THÀNH-SUỐI TIÊN - GÓI THẦU: 1a
HISATOSHI MIZUSAKO
NGƯỜI THIẾT KẾ
19-Dec-2017 B Second Submission DATE OF ISSUE / NGÀY PHÁT HÀNH TITLE BEN THANH STATION
CHECKER TÊN BẢN VẼ NHÀ GA BẾN THÀNH
16-Apr-2018 C Third Submission
NGƯỜI KIỂM TRA
SHOJI MASAKI 15-Nov-2018 GROUND FLOOR
25-May-2018 D Fourth Submission
HCMC PEOPLE'S COMMITTE NJPT ASSOCIATION SMCC-CIENCO 4 JOINT VENTURE DESIGN MANAGER STAGE / GIAI ĐOẠN WASTE / FOUL WATER DRAINAGE SYSTEM PLAN 2/3
20-Jul-2018 E Fifth Submission SHINYA KONDO
MANAGEMENT AUTHORITY FOR URBAN RAILWAY LIÊN DANH NJPT LIÊN DANH SMCC-CIENCO 4 CHỦ NHIỆM THIẾT KẾ
15-Sep-2018 F Sixth Submission CONSTRUCTION DESIGN DRAWING NO REV. / BẢN
UBND TP HCM-BAN QUẢN LÝ ĐƯỜNG SẮT ĐÔ THỊ NK-JIC-PBJ-JTC-TEC-TEDI South-TRICC PROJECT MANAGER
KAZUMITSU TAHARA BẢN VẼ SỐ UMRTL1-CP1a-OT-MBS-DS-12030
15-Nov-2018 G Seventh Submission GIÁM ĐỐC DỰ ÁN BẢN VẼ THIẾT KẾ G
PLEASE REFER TO THE DRAWING NO. UMRTL1-CP1a-OT-MBS-DS-12030 FOR CONTINUATION
OIL INTERCEPTOR
Ø50,Ø50,Ø65
WPP,U/G
P
WP WP WP
Ø50
P
FROM WASTE WATER PIT (NO.3)
Ø50
P
FROM WASTE WATER PIT (NO.4)
Ø65
FROM WASTE WATER PIT (NO.10)
F-1
(H=3.5m)
(W=3.4m)
F-2
(H=3.5m)
(W=3.5m)
Cooling Tower
for Line1
Ventilation Tower (EA)
for Line1
(H=3.5m)
F-6
(H=3.5m)
(W=3.0m)
F-5
(H=3.5m)
(W=3.0m)
KEY PLAN - GF
DATE REV. DESCRIPTION THE EMPLOYER / CHỦ ĐẦU TƯ THE ENGINEER / TƯ VẤN GIÁM SÁT THE CONTRACTOR / NHÀ THẦU PREPARED FULL NAME SIGNATURE SCALE / TỶ LỆ FORMAT / KHỔ BẢN VẼ PROJECT HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
NGÀY BẢN THUYẾT MINH NGƯỜI THỰC HIỆN HỌ VÀ TÊN CHỮ KÝ DỰ ÁN BEN THANH-SUOI TIEN SECTION (LINE 1) - PACKAGE: 1a
1/400 A3 DỰ ÁN XÂY DỰNG TUYẾN ĐƯỜNG SẮT ĐÔ THỊ SỐ 1 TP HỒ CHÍ MINH
6-Nov-2017 A First Submission DESIGNER TUYẾN BẾN THÀNH-SUỐI TIÊN - GÓI THẦU: 1a
HISATOSHI MIZUSAKO
NGƯỜI THIẾT KẾ
19-Dec-2017 B Second Submission DATE OF ISSUE / NGÀY PHÁT HÀNH TITLE BEN THANH STATION
CHECKER TÊN BẢN VẼ NHÀ GA BẾN THÀNH
16-Apr-2018 C Third Submission
NGƯỜI KIỂM TRA
SHOJI MASAKI 15-Nov-2018 GROUND FLOOR
25-May-2018 D Fourth Submission
HCMC PEOPLE'S COMMITTE NJPT ASSOCIATION SMCC-CIENCO 4 JOINT VENTURE
20-Jul-2018 E Fifth Submission
MANAGEMENT AUTHORITY FOR URBAN RAILWAY LIÊN DANH NJPT LIÊN DANH SMCC-CIENCO 4
DESIGN MANAGER
CHỦ NHIỆM THIẾT KẾ
SHINYA KONDO
STAGE / GIAI ĐOẠN
WASTE / FOUL WATER DRAINAGE SYSTEM PLAN 3/3
15-Sep-2018 F Sixth Submission CONSTRUCTION DESIGN DRAWING NO REV. / BẢN
UBND TP HCM-BAN QUẢN LÝ ĐƯỜNG SẮT ĐÔ THỊ NK-JIC-PBJ-JTC-TEC-TEDI South-TRICC PROJECT MANAGER
KAZUMITSU TAHARA BẢN VẼ SỐ UMRTL1-CP1a-OT-MBS-DS-12040
15-Nov-2018 G Seventh Submission GIÁM ĐỐC DỰ ÁN BẢN VẼ THIẾT KẾ G
UMRTL1-CP1a-OT-MBS-DS-12070
Entrance 3
Entrance 2
UMRTL1-CP1a-OT-MBS-DS-12060
Pump Room Entrance 1
Signboard
Ancillary
Room(3)
Front
OA Room(1) Corridor(1) Station Control Room
Ancillary Room(2) Free Concourse
Substation Room Electric Supply Room Signaling Telecommunication
Equipment Room Station Master
EA Station Control Room
Room
Control Panel Space Paid Concourse
Staff Toilet(M)
EPS
Reception Supervisor Window &
Ancillary Room Display Window(3)
Service Substation Room Room(1) Gate Information Room
DPS
EPS
Pantry Ticket Sale Room
(F) Staff Toilet OA TVF
Display Window(2)
Corridor(2)
PS EPS
Toilet(H) Toilet(H) PS
Meeting Room
Toilet(M) Cleaner Free Concourse
Cleaner
Store Room
Toilet(F)
PS
Entrance 4
Entrance 6
Entrance 5
DATE REV. DESCRIPTION THE EMPLOYER / CHỦ ĐẦU TƯ THE ENGINEER / TƯ VẤN GIÁM SÁT THE CONTRACTOR / NHÀ THẦU PREPARED FULL NAME SIGNATURE SCALE / TỶ LỆ FORMAT / KHỔ BẢN VẼ PROJECT HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
NGÀY BẢN THUYẾT MINH NGƯỜI THỰC HIỆN HỌ VÀ TÊN CHỮ KÝ DỰ ÁN BEN THANH-SUOI TIEN SECTION (LINE 1) - PACKAGE: 1a
P
P
P
P
P
WWP-01-2 : Q=70L/min, H=12mAq
WP
VP
WP
VP
VP
VP
WP
WP
WP
WP
PP
PP
W
W
Ø65,50, 65,65,80,50,100,100,100, 100 Ø50,Ø65
CHP-B1-01 H/L OF B1 TO GF FD(C) T/A,T/A
CHP-B1-02
CWP-B1- CO Ø50 WP FD(C)
CWP-B1- 01 HP Ø50-WP,U/S OF
02 B1
HP CHILER Pump Room Entrance 1 Ø50-WP,U/S OF Ø50 WP FD(C)
B1
Ø65-WP Ø65-WPP, H/L OF B1 Ø50 WP
P, H Ø50-WP,U/S Ticket
/L OF B
1 OF B1Vending Machine Room &
Fee Adjustment Area
HP F.D FOR ESCALATOR PIT Supervisor Window &
CO Gate Information Room
CHILER
FD Ø50-WP,U/S OF
RS ECS Plant Room B1
TEF Ø50-WP EV-U1 Ø50-WP,U/S OF EPS
HP B1
Ø50 WP
CHILER FD Ø50-WP,U/S OF
EA Equipment Hatch Ø50 WP B1
on Top Slab FD Ticket Sales Room
P
WP
OA Ø50 WP CO
WP Ø50 WP CO
FD FOR EV PIT HP Ø50 WP
Ø65,Ø80 Ø50-WP FD FD(C)
CO
FROM WASTE WATER PIT NO.7, T/A AHU Ø50 WP
FD(C)
Ø80-WPP HP FD(C)
,H/L OF B
1 Ancillary
Room(3)
Ø100-VP
,H
Ø50-WPP /L OF B1 Free Concourse
Ø100-VP ,H/L OF B1 AHU Top Light on Top Slab
Ø100-V ,H/L OF B1
Ø100-VPP,H/L OF B1 Station Control Room
Ø80-WPP,H/L OF B1 Corridor(3) Storage First Aid Room
Ø50-WP ,H/L OF B1 FD(CO) (1) Front Room(2)
Ø65-WP P,H/L OF B1 Ø50-VP, U/S OF B1
P,H/L OF SEE DWG No: UMRTL1-CP1a-OT-MBS-DS-12110
B1
Ø50 WP Front
OA Room(1) Corridor(1) Station Control Room
CO Ancillary Room(2)
Substation Room Electric Supply Room Signaling Telecommunication BASIN
Equipment Room Ø50-WP FD(CO) Station Master
EA Station Control Room
Room
Ø50-WP FD(C) Control Panel Space
WP
RISER OPENING REQUIRED600x1600 Ø100-WP,U/S OF B1
Ø50 WP Staff Toilet(M)
P
SEE DETAIL OF RISER 1 ON DWG.
WP
EPS
WP
VP
WP
Ø100-WP
Ø50 UMRTL1-CP1a-OT-MBS-DS-T12230 Reception Ø50-WP,U/S OF B1
Ancillary FD(CO) Room
Ø50 Service Substation Room Room(1)
P
FD(CO) DPS
H/L OF B1
T/B B2 F/B TO H/L FROM FOUL WATER PIT No.1 FROM FOUL WATER PIT No.1 H/L OF B1
Ø50-VP
Ø50-WP Ø50 SINK
Pantry
Ø65 (F) Staff Toilet
U/S OF B1
FROM FOUL WATER SUMP PIT No.2
Entrance 4
ABOVE CELLING
P
P
WP
WP
P
P
Ø50,65
-WP
-WP
P
P
WP
WP
VP
VP
VP
WP
WP
H/L OF B1 TO GL
Ø65
Ø50
Ø50,Ø65 Ø100, Ø50
FROM/TO WASTE WATER PIT(No.9 B2F) TO FOUL WATER SUMP PIT No.2
ENTRANSE-4
NOTE: REVISION G
P
WP
NOTE: REVISION G
Ø50
H/L OF B1 TO GL
P
WP
WP
B1
Ø50,50
OF
H/L OF B1
, H/L
WWP
PUMP PIT FOR WASTE WATER (NO.5)
CAPACITY TANK: 1.9 m3 BY CIVIL
Ø65-
SIZE TANK: 3.7mL x 1mW x 0.3mH Entrance 3
WWP-05-1 : Q=50L/min, H=12mAq
WWP-05-2 : Q=50L/min, H=12mAq
Entrance 2
Ø1
00
-W
W
P
FD(C)
H/L OF B1
Ø50-WPP
Supervisor Window & Free Concourse FD(C)
CO Gate Information Room Ø50 WP
FD(C)
CO Ø50-WP,U/S OF
EPS B1 Ø50 WP
(INSIDE OF CONC FD
RETE DUCT)
Display Window(1) AHU Room
HP AHU
Ticket Sales Room
CO
EA CO
Ø50-WP,U/S OF
B1
Signboard
Ø50 WP
P
FD(C)
WP
WP
Ø50-WP,U/S OF
Ø50 WP B1
Ø80 Ø50
EV-U2 Ø50-WP,U/S OF TO B2 F/B TO H/L OF B1
Top Light on Top Slab FD(C) B1 FD(C)
Ø50 WP Free Concourse Ø50 WP
CO
CO
Ø50-VP, U/S OF B1 FD(C)
SEE DWG No: UMRTL1-CP1a-OT-MBS-DS-12110
WP
Free Concourse
Ø50-VP, U/S OF B1 Ø50
TO B2
Control Panel Space Paid Concourse Ø100-WP, U/S OF B1 CO
Ø100-WP, U/S OF B1
EPS
Ø50-VP, U/S OF B1
Ticket Sale Room
Ø50-WP OA TVF
U/S OF B1
Ø50-WP
Ticket Vending Machine Room & U/S OF B1
Fee Adjustment Machine Room
CO Ø50-WP
U/S OF B1
Ø65-WPP Display Window(2)
SEE DETAIL Corridor(2)
OF TOILET AREA ON DWG: UMRTL1-CP1a-OT-MBS-DS-12190 H/L OF B1
PS EPS
Toilet(H) Toilet(H) PS
CO Meeting Room
FD(C) FD(C)
Toilet(M) Cleaner Free Concourse
Cleaner
Store Room Ø50-WP, U/S OF B1
Toilet(F)
CO
PS
Free Concourse
WP P
P
P
WP
WP
Ø65,50,50
H/L OF B1 TO GL
Ø6
5-W
PP
,A
BO
VE
CE
L
LIN
G
P
WP
WP
Ø65 Ø50-WP
F/B TO H/L OF B1 Ø50-WWP,H/L OF B1
TO WASTE WATER PIT No.10
Entrance 6
Ø65-WPP,ABOVE CELLING
Ø50-WPP,ABOVE CELLING
P
-WP
PUMP PIT FOR WASTE WATER (NO.4)
Ø50
CAPACITY TANK: 2.84 m3 BY CIVIL
SIZE TANK: 1.7mL x 5.6mW x 0.3mH
WWP-04-1 : Q=50L/min H=12mAq
WWP-04-2 : Q=50L/min H=12mAq
NOTE: REVISION G
DATE REV. DESCRIPTION THE EMPLOYER / CHỦ ĐẦU TƯ THE ENGINEER / TƯ VẤN GIÁM SÁT THE CONTRACTOR / NHÀ THẦU PREPARED FULL NAME SIGNATURE SCALE / TỶ LỆ FORMAT / KHỔ BẢN VẼ PROJECT HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
NGÀY BẢN THUYẾT MINH NGƯỜI THỰC HIỆN HỌ VÀ TÊN CHỮ KÝ DỰ ÁN BEN THANH-SUOI TIEN SECTION (LINE 1) - PACKAGE: 1a
RS EA duct
TEF TEF Room 1 on B1 Slab
EV Pit on B1 Slab
TEF
AHU Room TVF
TVF Room 1
RS EA
OA Duct on B1 Slab
Line 1 Platform
EV-U2
Platform Supervise Room
Opening Above
on B1 Slab
Line 1 Platform
EA RS
AHU Room TEF
OA TEF Room 2
Staff Toilet(M)
Corridor(1)
Station Meeting Room(1)
Store(1) Pump Room Shower Room(M)
Resting Room PS Shower
Water Tank Room Room
Fire Service Water Tank Room Station Meeting Room(2) Corridor(1)
Linen (F) Staff Locker Store
Closet (M) (〃) (〃) (〃) (M) (M) (M) Toilet(F) Room(F) (2) Store(3)
(F) (F)
DATE REV. DESCRIPTION THE EMPLOYER / CHỦ ĐẦU TƯ THE ENGINEER / TƯ VẤN GIÁM SÁT THE CONTRACTOR / NHÀ THẦU PREPARED FULL NAME SIGNATURE SCALE / TỶ LỆ FORMAT / KHỔ BẢN VẼ PROJECT HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
NGÀY BẢN THUYẾT MINH NGƯỜI THỰC HIỆN HỌ VÀ TÊN CHỮ KÝ DỰ ÁN BEN THANH-SUOI TIEN SECTION (LINE 1) - PACKAGE: 1a
WP
P
WP
WP
WP
WP
P
P
WP
WP
VP
VP
VP
VP
Ø65,Ø80 Ø50-WP
Ø50-WP Ø100 Ø50 Ø100, Ø100, Ø100, Ø80 Ø50-WP Ø100-WP
T/A,F/A FROM EV PIT
F/A T/A T/A T/A FROM FD(C) OF B1 FROM STAFF TOILET OF B1
WP
Ø50-WP
UNDER SLAB FOR LINE 1 (1) ,UNDER DRAIN FOR ELV-U1
CAPACITY TANK: 2.3m3 BYCIVIL RS Ø80-WP PLATFO
, i=1.67% RM EA duct
SIZE TANK: 1.7mL x 4.5mW x 0.3mH TEF , UNDER on B1 Slab AHU CO Ø100
PLATFO TEF RoomFD
1
CO EV Pit on B1 Slab P/A
WWP-07-1 : Q=50L/min, H=18mAq RM Ø50-WP,i=1.67%,
UNDER PLATFO
WWP-07-2 : Q=50L/min, H=18mAq AHU Room RM CO
FD
HP
Ø100-WP
Ø100-VP, UNDER FD(C) Ø100-WP, UNDE
PLATFORM GV CV R PLATFORM
3 Ø50-WPP ,U GV CV CO
OA Duct on B1Ø5
Slab ND ER PLATFORM
CO 0-WP UNDE FD Line 1 Platform FD(CO)
R PLATFORM ESCALATOR SU CO
RISER OPENING REQUIRED 600x1600 MP PIT FD
Ø50-WPP, T/A BY CIVIL WORK
Ø50
BASIN Ø50-WP
Ø65-WPP, T/A WATER DISCHAG Platform Supervise Room BASIN
E TO
Opening UNDER SLAB FIRE TANK UNDER FLATFORM SINK FD(C)
on B1 Slab
PUMP PIT FOR WASTE WATER (NO.08) CO
WP
P
CAPACITY TANK: 0.46 m3 BY CIVIL
WP
SIZE TANK: 1.7mL x 0.9mW x 0.3mH Ø100-WP, U/S OF B2(FROM B1 TOILET)
WWP-08-1 : Q=50L/min, H=18mAq Ø50-WPP, H/L OF B2 Ø65-WPP, H/L OF Ø65 Ø50 Ø50-VP, H/L OF B2(FROM B2 TOILET)
B2
WWP-08-2 : Q=50L/min, H=18mAq FD T/A F/A Ø100-VP, H/L OF B2(FROM B2 FOUL WATER TANK-2)
O.F FD(CO) Ø50-WP Ø65-WPP, H/L OF Ø65-WPP, H/L SEE
OF B2
CO DETAIL ON DWG UMRTL1-CP1a-OT-MBS-DS-12200
Ø100 B2
CO Ø100-WP,FROM B2 TOILET
CO
Ø50-WP BASIN BASIN Staff Toilet(M) CO
Ø100-WP
Ø50-WP
HP Fire Service Water Tank Room Ø65-WPP, U/S OF B2
CO Ø50-WP , U/S OF B2 Linen (F) Staff Locker
Closet (M) GV (〃)
GV (〃) (〃) (M) (M) (M) Toilet(F) Room(F)
FD(CO)
Ø50-WP CV CV Ø50 - VP, H/L OF B2 (F) (F) Ø40 - VP
FD HP FD H/L OF B2
Corridor(1) FD(CO) EPS
Ø80-WP (U/S B2) AHU Ø100-WP FD(CO) Corridor(2) Corridor(3) FD(CO)
WATER TANK FD AHU Room Ø65-WPP, U/S OF B2
CO CO U/S OF B2 Dining Room Ø100 - VP, H/L OF B2 CO
ROOM OF LINE 1 Cylinder Store Locker
Ø65-WPP, U/SRoom(M)
OF B2 (M) (〃) (〃) (〃) Ø100 - VP,
(〃) (〃) H/L (〃)
OF B2 (〃) (M) (F) (〃) (〃) (F) Linen DPS
PS Closet
Ø50 DRAIN PIPE OF SPRINKLER SYSTEM Ø65-WPP, U/S OF B2
Ø50-WP, U/S OF B2 Ø80 - WPP, H/L OF B2
Ø100-VP, H/L OF B2
FROM B2 FOUL WATER SUMP PIT No.2 THROUGH THE D WALL Ø80 - WP, U/S OF B2
PUMP PIT FOR WASTE WATER (NO.09) FOUL WATER SUMP PIT No.2
Station
CAPACITY TANK: 6.5Staff
m3 BYDrivers dormitory
CIVIL VOLUME : 0.6 m3 BY CIVIL Station Staff Drivers dormitory
SIZE TANK: 1.7mL x 12.7mW x 0.3mH FWP-02-1 :Q=50L/min, H=18mAq
WWP-09-1 : Q=90L/min, H=19mAq FWP-02-2 :Q=50L/min, H=18mAq
WWP-09-2 : Q=90L/min, H=19mAq
P
WP
WP
WP
DISCHARGE TO
VP
GUTTER IN PIT B2
NOTE: REVISION G
WP
P
WP
P
WP
WP
Ø80 Ø50
F/A T/A Ø65 Ø50
T/A
F/A
PUMP PIT FOR WASTE WATER (NO.11)
CAPACITY TANK: 2.5 m3 BY CIVIL
SIZE TANK: 1.7mL x 4.9mW x 0.3mH
WWP-11-1 : Q=50L/min, H=20mAq
WWP-11-2 : Q=50L/min, H=20mAq
WP
Ø100
TO FOUL WATER P/A TEF
SUMP PIT No.1 TVF
Ø50-WP U/S OF B2 TVF Room 1
Ø100-WP, UNDE
R PLATFORM SUMP PIT FOR ELV-U2 RS EA FD
BY CIVIL WORK
FD(CO) CO (NO PUMP)
CO Ø50-WP, UNDE
R PLATFORM i
EV-U2 = 1.67%
Ø50-WP FD(C)
Platform Supervise Room BASIN
SINK FD(C) Above
CO Line 1 Platform
ESCALATOR SUMP PIT Ø50-WP, i=1%, U/S
OF B2 EA RS
BY CIVIL WORK AHU Room TEF
AHU OA TEF Room 2
Ø65-WPP, H/L
SEEOF B2 ON DWG UMRTL1-CP1a-OT-MBS-DS-12200
DETAIL
Ø100-VP, H/L OF B2 Ø50-WP FD
HP
FROM B3 FOUL WATER SUMP PIT No.3 U/S OF B2
Corridor(1) FD
CO Ø50-VP, H/L OF B2 FROM TOILET B1 SLEEVE SYMBOL
(CO) Ø100-WP, H/L OF B2 FROM TOILET B1
Ø50
Shower - VP
Room(M) THROUGH THE D WALL
H/L OF B2 PS Shower SEE DWG No: UMRTL1-CP1a-OT-MBS-DS-12070
CO FD(CO)
Room
Ø65-WPP, U/S OF B2 (F) Staff Locker Store Corridor(1) Ø50-WPP U/S OF B2
(M) (M) Toilet(F) Room(F)
FD(CO) (2) Store(3)
Ø50 - VP, H/L OF B2 (F) (F) Ø40 - VP FD
H/L OF B2 FD(CO) CO
Ancillary Room(1) Ø80-WP, i=1%, U/S OF B2 Ø50-WP FD
Corridor(3) FD(CO) Ø80-WP, i=1%, U/S OF B2
Ancillary Room(2) TVF Room 2 U/S OF B2
Store(4) Store(5)
CO
EV-U3
(〃) (M) (F) (〃) (〃) (F) Linen DPS
Closet
OA TVF
THROUGH THE D WALL Ø80 - WP, U/S OF B2
Ø65-WPP
Ø65-WPP, U/S OF B2
Station Staff Drivers dormitory
Ø50-WPP, U/S OF B2
DISCHARGE TO
DISCHARGE TO GUTTER IN PIT B2
GUTTER IN PIT B2
P
WP
DATE REV. DESCRIPTION THE EMPLOYER / CHỦ ĐẦU TƯ THE ENGINEER / TƯ VẤN GIÁM SÁT THE CONTRACTOR / NHÀ THẦU PREPARED FULL NAME SIGNATURE SCALE / TỶ LỆ FORMAT / KHỔ BẢN VẼ PROJECT HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
NGÀY BẢN THUYẾT MINH NGƯỜI THỰC HIỆN HỌ VÀ TÊN CHỮ KÝ DỰ ÁN BEN THANH-SUOI TIEN SECTION (LINE 1) - PACKAGE: 1a
1/400 A3 DỰ ÁN XÂY DỰNG TUYẾN ĐƯỜNG SẮT ĐÔ THỊ SỐ 1 TP HỒ CHÍ MINH
6-Nov-2017 A First Submission DESIGNER TUYẾN BẾN THÀNH-SUỐI TIÊN - GÓI THẦU: 1a
HISATOSHI MIZUSAKO
NGƯỜI THIẾT KẾ
19-Dec-2017 B Second Submission DATE OF ISSUE / NGÀY PHÁT HÀNH TITLE BEN THANH STATION
CHECKER TÊN BẢN VẼ NHÀ GA BẾN THÀNH
16-Apr-2018 C Third Submission
NGƯỜI KIỂM TRA
SHOJI MASAKI 15-Nov-2018
25-May-2018 D Fourth Submission BASEMENT 2
HCMC PEOPLE'S COMMITTE NJPT ASSOCIATION SMCC-CIENCO 4 JOINT VENTURE
20-Jul-2018 E Fifth Submission
MANAGEMENT AUTHORITY FOR URBAN RAILWAY LIÊN DANH NJPT
DESIGN MANAGER
SHINYA KONDO
STAGE / GIAI ĐOẠN
WASTE / FOUL WATER DRAINAGE SYSTEM PLAN 2/2
LIÊN DANH SMCC-CIENCO 4 CHỦ NHIỆM THIẾT KẾ
15-Sep-2018 F Sixth Submission CONSTRUCTION DESIGN DRAWING NO REV. / BẢN
UBND TP HCM-BAN QUẢN LÝ ĐƯỜNG SẮT ĐÔ THỊ NK-JIC-PBJ-JTC-TEC-TEDI South-TRICC PROJECT MANAGER
KAZUMITSU TAHARA BẢN VẼ SỐ UMRTL1-CP1a-OT-MBS-DS-12110
15-Nov-2018 G Seventh Submission GIÁM ĐỐC DỰ ÁN BẢN VẼ THIẾT KẾ G
U9
P
U7
WP
In Future
P
WP
WP
VP
Ø50
TO WASTE WATER PIT Ø100, Ø100, Ø80
P
WP
No.9 (B2F) T/A, F/A, T/A
Ø50
TO WASTE WATER PIT No.10 (B2F)
P
WP
VOLUME: 3 m3 BY CIVIL
SIZE: 1.7m x 2.0m x 0.9mH
Ø50
FWP-03-1 :Q=80L/min, H=26.6mAq
FWP-03-2 :Q=80L/min, H=26.6mAq FROM WASTE WATER PIT No.13 (B4F)
NOTE: REVISION G
PP 4
5 0-W F B
TEMPORARY PUMP PIT FOR WASTE WATER (NO.13) Ø SO
UNDER SLAB FOR LINE 2 (1) U/
CAPACITY TANK: 0.8 m3 BY CIVIL
SIZE TANK: 1.7mL x 1.5mW x 0.3mH
WWP-13-1 : Q=50L/min, H=16mAq
WWP-13-2 : Q=50L/min, H=16mAq
NOTE: REVISION G
Ø1
00
i= -
1% WP,
UN
DE
R
GR
OU
D
FOR FUTURE
U/G
FOUL WATER TREATMENT PLANT - LINE 1
i = 1 0 WP-
CAPACITY: 20 m3/DAY
FLANGE BOX (FOR FUTURE) H = 3.4m
%
Ø10
MH
04
MH
Ø10 02
0
i=
0
1,2
Ø10
5%
Ø8
0W
W
Ø80,Ø65,Ø50
150k
P-
W
4-
U/G
150k
RE
W
TU
3-
FROM FOUL WATER
150k
FU
RE
W
for
TU
2-
150k
FU
RE
for
SUMP PIT No.1,No.2, No.3
TU
1-
FU
RE
for
TU
FU
for
MH
01
Ø65
Ø15,Ø15,Ø40,Ø25
U/G RS
WWTP
ROOM
Cooling Tower of
Line1
TEF
EA
OA
F-1
(H=3.5m)
(W=3.4m)
F-2
(H=3.5m)
(W=3.5m)
Cooling Tower
for Line1
Ventilation Tower (EA)
for Line1
(H=3.5m)
F-6
(H=3.5m)
(W=3.0m)
F-5
(H=3.5m)
(W=3.0m)
KEY PLAN - GF
NOTE: REVISION G
DATE REV. DESCRIPTION THE EMPLOYER / CHỦ ĐẦU TƯ THE ENGINEER / TƯ VẤN GIÁM SÁT THE CONTRACTOR / NHÀ THẦU PREPARED FULL NAME SIGNATURE SCALE / TỶ LỆ FORMAT / KHỔ BẢN VẼ PROJECT HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
NGÀY BẢN THUYẾT MINH NGƯỜI THỰC HIỆN HỌ VÀ TÊN CHỮ KÝ DỰ ÁN BEN THANH-SUOI TIEN SECTION (LINE 1) - PACKAGE: 1a
SLUDGE RETURN
DISCHARGE PUMP
PUMP 1&2
RAW WW
A PUMP
A
CIRCULATION
PUMP MIXING PUMP
C B
DATE REV. DESCRIPTION THE EMPLOYER / CHỦ ĐẦU TƯ THE ENGINEER / TƯ VẤN GIÁM SÁT THE CONTRACTOR / NHÀ THẦU PREPARED FULL NAME SIGNATURE SCALE / TỶ LỆ FORMAT / KHỔ BẢN VẼ PROJECT HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
NGÀY BẢN THUYẾT MINH NGƯỜI THỰC HIỆN HỌ VÀ TÊN CHỮ KÝ DỰ ÁN BEN THANH-SUOI TIEN SECTION (LINE 1) - PACKAGE: 1a
DATE REV. DESCRIPTION THE EMPLOYER / CHỦ ĐẦU TƯ THE ENGINEER / TƯ VẤN GIÁM SÁT THE CONTRACTOR / NHÀ THẦU PREPARED FULL NAME SIGNATURE SCALE / TỶ LỆ FORMAT / KHỔ BẢN VẼ PROJECT HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
NGÀY BẢN THUYẾT MINH NGƯỜI THỰC HIỆN HỌ VÀ TÊN CHỮ KÝ DỰ ÁN BEN THANH-SUOI TIEN SECTION (LINE 1) - PACKAGE: 1a
A A
Ø15,Ø15,Ø40,Ø25
TO FWTP-1,UNDER GROUND
F-1
(H=3.5m)
(W=3.4m)
Cooling Tower
of Line1
Cooling Tower
RS
for Line1
WWTP
ROOM
TEF
EA
OA
Top Light
(H=4.0m)
F-6
CONTROL ROOM
(H=3.5m)
(W=3.0m)
F-4
(H=3.5m)
(W=3.0m)
F-5
(H=3.5m)
(W=3.0m)
KEY PLAN - GF
DATE REV. DESCRIPTION THE EMPLOYER / CHỦ ĐẦU TƯ THE ENGINEER / TƯ VẤN GIÁM SÁT THE CONTRACTOR / NHÀ THẦU PREPARED FULL NAME SIGNATURE SCALE / TỶ LỆ FORMAT / KHỔ BẢN VẼ PROJECT HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
NGÀY BẢN THUYẾT MINH NGƯỜI THỰC HIỆN HỌ VÀ TÊN CHỮ KÝ DỰ ÁN BEN THANH-SUOI TIEN SECTION (LINE 1) - PACKAGE: 1a
Ø100-WP
Ø65-VP AT H/L OF B1
Ø65-WP, i=1.67% Ø125-WP, i=1.67%
Reception Room
Ø50-WP, i=1.67% CO
CO B SINK
ToiletO SINK Ø65-VP AT HL OF B1
B B FD B Ø100-WP, i=1.67% FD
UR UR Ø100-WP, i=1.67% FD FD DIS CHANGE TO GUTTER
FD
FD Toilet Ø50-VP Ø65-WP, i=1.67% Toilet Ø100-WP
Ø65-WP, i=1.67% Ø50-VP AT HL Ø40-VP AT HL Ø50-VP H/L OF B1 Ø50-VP U/S OF B1
Ø65-WP Toilet(H)
Ø50-WP, i=1.67% Toilet(H)
Staff Toilet(M) i=1.67%
CO CO CO
B
Ø65-WP, i=1.67% FD Ø65-WP, i=1.67% Ø100-WP
Ø100-WP, i=1.67% Ø100-WP, i=1.67%
Ø50-VP AT HL Ø100-WP, i=1.67% Ø50-WP Ø100-WP, i=1.67% SINK
Toilet Ø65-WP, i=1.67% SINK FD B
Ø100-WP, i=1.67% FD Toilet U/S OF B1 Ø50-WP
Toilet FD
Ø65-VP
FD B Ø50-VP AT H/L OF B1 U/S OF B1
Toilet(M)
Ø65-WP, i=1.67% Cleaning Tool Store Cleaner's Store FD(CO)
CO Ø100-WP, i=1.67% FD(CO)
Passage Way
FD Toilet
Ø50-VP
B Ø50-WP Ø65-WP
Ø50-VP AT HL OF B1 Ø100-WP, i=1.67%
Ø100-WP, i=1.67% U/S OF B1
Corridor CO
Ø100-WP, i=1.67% Corridor(2)
B FD FD Toilet Cleaner's Room
Ø50-VP AT HL
Ø65-WP, i=1.67% Toilet(F)
Ø50-VP AT H/L Toilet Toilet Toilet Toilet
B Ø100-WP, i=1.67% Ø50-WP
Ø100-WP, i=1.67% SK CO Ø50-WP
FD FD(CO) Ø50-VP AT HL Toilet U/S OF B1
Ø65-WP, i=1.67%
CO B B B B Ø65-VP
CO Ø65-WP, i=1.67% Ø50-WP, i=1.67% Ø50-WP Toilet FD
Toilet FD FROM SINK OF PANTRY Ø50-VP AT H/L OF B1 Ø65-WP
CO
Ø100-WP, i=1.67% B U/S OF B1
FD Ø65-WP Ø50-WP, i=1.67% UR UR UR UR UR
Toilet FD CO
CO CO
B CO CB
Ø100-WP, i=1.67%
NOTES:
Ø50, Ø100
F/A 1. REFER TO DWG BTS-EM-PL-T1100 FOR PIPE SIZE
CONNECT TO EACH SANITARY FIXTURE
Ø50-WP, U/S OF B2 CO Ø100-WP, i=1.67%
Ø50-WP, U/S OF B2 2. REFER TO DWG BTS-EM-PL- T1304 FOR TYPICAL
TO WASTE WATER PIT No.9 FROM FD CO DETAIL OF INSTALLATION OF SANITARY FIXTURES
Ø100-WP, i=1.67% 3. WASTE WATER PIPE ABOVE SLAB
Ø50-WP, i=1.67% B B CO FD(CO) Corridor WASTE WATER PIPE UNDER SLAB
Ø100-WP, U/S OF B2 FD
B Ø50-WP VENT PIPE AT H/L
Ø80-WP, U/S OF B2 Toilet Toilet Toilet FD Ø50-VP, U/S OF B2 U/S OF B2 4. WALL MOUNTED TYPE WATER CLOSET IS TO PROVIDE
FROM DINNING ROOM Ø50-WP, i=1.67%
Ø50-VP AT H/L WITH BRACKET/ SUPPORT
Staff Toilet(M) CO FD(CO)
Shower Room(M) Ø100-WP, i=1.67%
Ø100-VP H/L OF B2 Ø50-VP H/L OF B2 Ø50-VP H/L OF B2 CO
FD COS FD FD FD FD FD FD
FROM B1 TO FOUL
UR UR Ø50-WP FD Shower Room (F)
UR UR PS Toilet FD WATER SUMP
CO FD FD COS Ø65-WP
Ø50-WP, U/S OF B2 CO PIT No.3 (B3F)
SK Ø100-WP, i=1.67% Ø100-WP, i=1.67% Ø100-WP, i=1.67% Toilet
TO WASTE WATER PIT No.9 FOR WASHING MACHINE
Ø100-WP, i=1.67% Corridor
FD
U/S OF B2 Ø80-WP Ø65-WP
FD CO
Ø50-VP AT H/L OF B2 B
CO Shower Room (F) Ø40-VP U/S OF B2
STORAGE ROOM
Ø50-VP AT H/L OF B2 Ø50-VP AT H/L OF B2 Staff Toilet(F)
EPS Ø65-WP, i=1.67%
Toilet ROOM
FOUL WATER SUMP PIT No.2 Ø65-WP, i=1.67% FD
VOLUME : 0.6m3 BY CIVIL SHOWER UNIT BY ARCH, 8SET Ø100-VP AT H/L OF B2
SB-FWP-02-1 : Q=50L/min, H=18mAq SHOWER:INCLUDING PART OF UNIT CO B
FD:INCLUDING PART OF UNIT Ø50-WP, i=1.67%
SB-FWP-02-2 : Q=50L/min, H=18mAq
Toilet ROOM
Corridor
VP
KEY PLAN - TOILET B2
Toilet (M) & Toilet (F) B2F
SCALE:1/100
DATE REV. DESCRIPTION THE EMPLOYER / CHỦ ĐẦU TƯ THE ENGINEER / TƯ VẤN GIÁM SÁT THE CONTRACTOR / NHÀ THẦU PREPARED FULL NAME SIGNATURE SCALE / TỶ LỆ FORMAT / KHỔ BẢN VẼ PROJECT HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
NGÀY BẢN THUYẾT MINH NGƯỜI THỰC HIỆN HỌ VÀ TÊN CHỮ KÝ DỰ ÁN BEN THANH-SUOI TIEN SECTION (LINE 1) - PACKAGE: 1a
Ø40-VP
Ø20-CW
Ø25-CW
Ø50-VP
STAFF WC(F) STAFF WC(M)
Ø50-VP
STAFF WC(F)
Ø20-CW
Ø20-CW
Ø20-CW
Ø50-WP
Ø50-WP
CO
Ø50-VP
Ø40
Ø40
Ø100 Ø100-VP FD
B1F B1F Ø65-WP Ø65-WP B1F
Ø100-VP
Ø100-VP
SLEEVE SLEEVE SLEEVE
Ø50-VP
SLEEVE
Ø65-WP
Ø100-WP
Ø65-WP
CO
i=1%
CO Ø100-VP
I=1% I=1%
Ø100-VP
Ø100-WP
BEAM Ø100-WP
SECTION 1-1 SECTION 2-2 SECTION 3-3
SCALE : 1/50 SCALE : 1/50 SCALE : 1/50
Ø40-CW
Ø50-VP
Ø50VP
Ø40-CW
WC (F) WC (M) WC (M)
Ø32-CW
Ø20-CW Ø25-CW Ø32-CW Ø32-CW Ø40-CW
Ø20-CW Ø25-CW Ø32-CW Ø25-CW Ø20-CW
Ø20-CW
Ø20-CW
Ø50-WP
Ø50-WP
Ø50-WP
CO
Ø50-WP
Ø50-WP
CO
Ø50-WP
Ø100-WP
Ø100-WP
Ø100-WP
Ø100-WP
Ø100-WP
I=1% Ø65-WP
B1F B1F Ø65-WP Ø65-WP B1F
Ø100-WP
SLEEVE
Ø100-WP
Ø100-WP
Ø100-WP
Ø100-WP
Ø100-WP
SLEEVE SLEEVE
Ø50-WP
Ø65-WP
Ø100-WP
CO
Ø100-WP I=1%
Ø100WP
BEAM BEAM
Ø100-WP
SECTION 4-4 SECTION 5-5 SECTION 6-6
SCALE : 1/50 SCALE : 1/50 SCALE : 1/50
DATE REV. DESCRIPTION THE EMPLOYER / CHỦ ĐẦU TƯ THE ENGINEER / TƯ VẤN GIÁM SÁT THE CONTRACTOR / NHÀ THẦU PREPARED FULL NAME SIGNATURE SCALE / TỶ LỆ FORMAT / KHỔ BẢN VẼ PROJECT HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
NGÀY BẢN THUYẾT MINH NGƯỜI THỰC HIỆN HỌ VÀ TÊN CHỮ KÝ DỰ ÁN BEN THANH-SUOI TIEN SECTION (LINE 1) - PACKAGE: 1a
GATE VALVE-DN65
GATE VALVE-DN65
From B1F Staff toilet VP PVC.DN100
CHECK VALVE-DN65
From B2F Platform SV room
CHECK VALVE-DN65
From B2F Platform SV room FILL BY SIKA GROUT
WP PVC.DN100 WP PVC.DN100 120 120
WP PVC.DN100
WP PVC.DN100 WP PVC.DN100
VP PVC.DN100 SUBMERSIBLE PUMP
120
200 200
WP PVC.DN100
???
200
WP PVC.DN100
SUS ANCHOR SHACKLE LADDER SUBMERSIBLE PUMP LADDER
400
100 VP - PVC.DN100 150
GI.DN65
300
SUS WIRE ROPE
GI.DN65
1200
TANK Depth 1.4m
200
SUS WIRE ROPE
CONCRETE BALANCE WEIGHT LADDER HIGH ALARM
700
FLOAT SENSOR
2 PUMP ON
HIGH ALARM
1 PUMP ON
2 PUMP ON
FILL BY SIKA GROUT 1 PUMP ON VP PVC.DN100
PUMP OFF
B B
500
500
PUMP OFF
A A Pump Pit
???
???
LADDER
Pump Pit
200
130
WP GI.DN100
150
H = - XX.XXX
WP GI.DN80
GI.DN80 540 380 200
H = - XX.XXX CONCRETE BALANCE WEIGHT
200
FOUL WATER PUMP PIT - NO.1 SECTION A-A FOUL WATER PUMP PIT - NO.2 SUBMERSIBLE PUMP
SECTION B-B
UPPER SLAB
TYPICAL DRAWING
MANHOLE Ø600x1 FOR
2
MAINTENANCE BY CIVIL
HIGH ALAM
SUS ANCHOR SHACKLE PUMP 2 ON
SPSP1
CONCRETE BALANCE WEIGHT PUMP 1 ON L1
PUMP OFF UNDER SLAB i=1
1
% 1
GATE VALVE-DN65
WP PVC.DN100
CHECK VALVE-DN65
WP GI.DN80 120 120
% DN65
WARNING-LIGHT i=1
H = - XX.XXX
2
2 PUMP ON
1 PUMP ON
CONCRETE FOUNDATION TYPICAL OF WASTE WATER PUMP PIT (NO.2)
LADDER MANHOLE BY CIVIL 450x450x150
SCALE: 1/50
PUMP OFF Ø600x1
Pump Pit
UPPER SLAB UPPER SLAB
A A
???
GATE VALVE-DN65
GATE VALVE-DN65
CHECK VALVE-DN65
MANTENANCE
VP PVC.DN100 WP PVC.DN100 PIPE DN65
LADDER BY CIVIL
INSIDE PIT
BOTTOM SLAB UNDER SLAB INSIDE PIT
UNDER SLAB
i=1% WL PIPE DN65 WL
SUMP PIT 2-INSIDE VIEW CABLE TO CONTROL PANEL
ALARM LEVEL
PUMP START UP LEVEL
FOUL WATER PUMP PIT - NO.3 SECTION 1-1 SECTION 2-2
SCALE: 1/50 LOW LEVEL-PUMP OFF
SCALE: 1/50 SCALE: 1/50
SECTION B-B
DATE REV. DESCRIPTION THE EMPLOYER / CHỦ ĐẦU TƯ THE ENGINEER / TƯ VẤN GIÁM SÁT THE CONTRACTOR / NHÀ THẦU PREPARED FULL NAME SIGNATURE SCALE / TỶ LỆ FORMAT / KHỔ BẢN VẼ PROJECT HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
NGÀY BẢN THUYẾT MINH NGƯỜI THỰC HIỆN HỌ VÀ TÊN CHỮ KÝ DỰ ÁN BEN THANH-SUOI TIEN SECTION (LINE 1) - PACKAGE: 1a
SHOWER
CH
DN15 CW &HW HEAD
TAPWARE DN20-CW
FAUCET
SCREWED DROP ROD
FAUCET
DN15-CW & HW SIZE'B'
BASIN
DN40-WP
ANGLE VALVE PIPESIZE MAX.RECOMMENDED DROPRODSIZE
DN15-CW & HW LOAD 'B'
ANGLE VALVE DN20-CW RUBBER CAP (MM DIA)
& DN15-HW KG. (LBS) MM DIA INCH. DIA
ANGLE VALVE
STEEL BALL CAP 40 136 300 10 3/8"
WATERPROOFING RUBBER PACKING DN40-WP DN50-WP
50 136 300 10 3/8"
FD
P-TRAP SLEEVE 75 227 500 13 1/2"
CONCRETE FLOOR SHOWER
FAUCET 100 409 900 16 5/8"
FFL. FFL. PIPE CLIP
DN50-WP 125 409 900 16 5/8"
150 590 1300 20 3/4
FFL.
200 818 1800 23 7/8"
WASTE WATER PIPE- DN65
PIPE, SIZE 'A'
BASIN WP CONNECT TO FLOOR DRAIN TYPICAL BASIN INSTALLATION TYPICAL STAINLESS STEEL SINK INSTALLATION
SCALE: NTS SCALE: NTS TYPICAL PIPE HANGER DETAIL
SCALE: NTS TYPICAL URINAL INSTALATION DETAILS
NOTE: - HOT WATER CONNECTION ON THE LEFT HAND TYPICAL SHOWER UNIT INSTALLATION SCALE: NTS
SCALE: NTS
- COLD WATER CONNECTION ON THE RIGHT HAND SCALE: NTS
SHOWER UNIT BY ARCH
STAINLESS STEAL COUVER R.C.SLAB
FROM ABOVE CLEAN OUT COUVER
BY ARC WORK WATERPROOFING (SEE NOTE)
FINSHED FLOOR MORTAR FINSHED FLOOR MORTAR SCREED + WIRE NET
STEAL CLEAN OUT 150x150 NICKEL BRONZE GRATING
CERAMIC/QUARRYTILES
DN15-CW
FD(C)
HOSE BIB
150
500
SIKA SIKA
STAINLESS MESH COUVER
FLOOR DRAIN BODY DISCHARGE TO
Ø80-CW WATER SUPPLY TO DRAIN OUTLET DRAIN OUTLET
DN100-WP
NOTE: REVISION G
DATE REV. DESCRIPTION THE EMPLOYER / CHỦ ĐẦU TƯ THE ENGINEER / TƯ VẤN GIÁM SÁT THE CONTRACTOR / NHÀ THẦU PREPARED FULL NAME SIGNATURE SCALE / TỶ LỆ FORMAT / KHỔ BẢN VẼ PROJECT HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
NGÀY BẢN THUYẾT MINH NGƯỜI THỰC HIỆN HỌ VÀ TÊN CHỮ KÝ DỰ ÁN BEN THANH-SUOI TIEN SECTION (LINE 1) - PACKAGE: 1a