TRACTABLE

SWPC

WSP

ILF
MOTT MC
DONALD

Comments/Conclusion: After having glance on all the proposals sub


shown very high ,
Since ILF is being planned to do the report without any personal v
SWPC ( saudi water partership comapny) with YAS engineers whic
Myah Gulf Oman Desa
Technical Due Diligen

Breifing about company No of visits Rqd


Tractebel is home to five of the world’s leading water
engineering companies:
Over 100 years of experience in Water
Over 1000 ongoing water projects in all continents
Involved in O&M of desalination plants 2 site visits

Saudi Water partership company estblished in 2003,


involve water business with the objective tendering of 1 visit 5 days
plants and projects of desalination. Water transmission

WSP is recognised as a leading technical and project


management consultant on seawater desalination
projects based on Thermal (MSF/MED) and Membrane
(SWRO) desalination technologies as well as Hybrid
technology utilizing a combination of these. 
Worked on prestigious projects such as Shuweihat S1
5 days visit
IWPP & Fujairah F2 IWPP in UAE, Ras Laffan C
IWPP in Qatar, Shuaiba Phase 3 IWPP & Shuaiba
Phase 3 Expansion II IWP in Saudi Arabia, Al Hidd
IWPP in Bahrain, Barka, Sohar & Salalah IWPs in
Oman, Al Dur Phase II IWPP and other many projects
in the region.

The ILF Group is an international engineering and


consulting firm that helps its clients successfully
execute technically demanding industrial and no vists due to
infrastructure projects covid
500,000 m³/d world’s largest RO plant (Magtaa
IWPP, Algeria)
operating in Oman for over 40 years providing design
engineering and consultancy services.
Projects completed range from small village water
3 to 5 days
supplies, to water supply for the whole of capital area.
MM were the owner’s engineer for the 42 MIGD
Ghubrah Independent Water Project, in Muscat.

ments/Conclusion: After having glance on all the proposals submitted by the parties technically Mott MC Donald is
n very high ,
ce ILF is being planned to do the report without any personal visit & not requesting any special documents , Accura
C ( saudi water partership comapny) with YAS engineers which is the part of ILF who is providing similar services
Myah Gulf Oman Desalination Company, S.A.O.C.
Technical Due Diligence Proposals Review Report

Team size Method of review & data reqd

Project documents ,
Plant Technical specification
Design report of various process units
team of 6 RO Membranes gaurantees and replacement
Annual performance test reports

site visit will be by local YAS


engineering(sub contractor) . Plant design data, Review of RCAs
(A team of 5 will work on project Actual wear & tear of equipment,
(YAS Consulting Engineers LLC (YAS CE) corrosion,
established in 1983 and it is part of the ILF Membrane historical trends,
Group which consists of several international Frequency of CIPS,
and independent engineering and consulting Membrane flux and recovery
companies with more than 45 years of Pretreatment system performance history
experience in various fields of competence.

Last 6 months O&M reports, Interation with


1 engineerwill visit site .
O&M team, Desktop review , project
agreements,EPC contract,As built drawings,
Team of 10 will work on project
performance parameter,O&M Reports

Not specially enclosed


team of7
Operation data for last 6 months,
O&M Logs and scada history
team of 6
etc

parties technically Mott MC Donald is much aligned with requirement and though it is having past assosiation with

uesting any special documents , Accuracy of the report cannot be justified,


f ILF who is providing similar services at Optimum cost can be considered /awarded.
Time for report Cost Cost in USD

1 month after data room 41917


access USDexcluding 41917
2 weeks after accepting draft VAT

79000 AED
Excluding covid
6 weeks 21507
requirement and
taxes

4 weeks for draft


25000 excluding
2 weeks for final report aftr 25000
taxes
accepting draft

44716 excluding
10 weeks to provide draft 44716
taxes
draft will be 6 weeks after
reciving all documens. 18985 OMR 49361
Final will be 2 weeks after excluding taxes
accepting the draft