Inspection Report: Cu Flexibles For SWGR and TRF End. (Qty. 36 Nos.)
Inspection Report: Cu Flexibles For SWGR and TRF End. (Qty. 36 Nos.)
B Dimension
Result Code :
A : Accepted ü
AD : Accepted with Deviation
RW : Rework QC Inspector
R : Reject Date :
INSPECTION REPORT
Project : M/s SAMAL BATTAN PHILLIPINES Client / Supplier : M/s THERMAX LIMITED, PUNE
B Dimension
Result Code :
A : Accepted ü
AD : Accepted with Deviation
RW : Rework QC Inspector
R : Reject Date :
INSPECTION REPORT
Project : M/s SAMAL BATTAN PHILLIPINES Client / Supplier : M/s THERMAX LIMITED, PUNE
Drg. No. : C-2268-0717-82539 Rev. 00 Product : 13.8 KV, 1600A/ 100A (SPBD)
Quantum Specified Value Observed Value
Sl. No. Description Result Code
of check in MM in MM
1 Cu Flexibles (Qty. 06 Nos.)
B Dimension
Result Code :
A : Accepted ü
AD : Accepted with Deviation
RW : Rework QC Inspector
R : Reject Date :
INSPECTION REPORT
B Dimension
Result Code :
A : Accepted ü
AD : Accepted with Deviation
RW : Rework QC Inspector
R : Reject Date :