SL NO MATERIAL DESCRIPTION (AS PER BOQ Only) PVL LIST RFQ STATUS RFQ Ref DATE DAYS NAME

Q STATUS RFQ Ref DATE DAYS NAME (Rep.) PHONE NUMBER EMAIL ADDRESS FOLLOWUP DETAILS Communication Notes with Supplier
1 11KV Panels (By E&I Division)
Jaidha Galfar Proposal Sent 42 14/Mar/20 417 Days raja.j@jaidah.com.qa
Siemens Siemens Sent 5 14/Mar/20 417 Days biplab.paul@siemens.com
Qwave Galfar Proposal Sent 50/51 17/Mar/20 414 Days isaac@qwaveqatar.com By Mistake Subject entered as # 50
2 POWER GENERATOR SET (Quote Received) Available Not Applicable
Caterpillar (USA) Caterpillar Not Applicable mahesh.mullavithana@albahar.com
Cummins (UK) Cummins Not Applicable Shima.abdalla@cummins.com
SDMO (France) SDMO Not Applicable aalkhdour@qsp.com.qa
FG Wilson (UK) FG Wilson Not Applicable No Contact Details
Starline Galfar Proposal Not Applicable yatin.deo@wattsarty.com
Schneider Galfar Proposal Not Applicable Thomas Philip (Direct SE)
2 POWER GENERATOR ENGINE Available Not Applicable
Mitsubishi (France) Mitsubishi Not Applicable
MTU (France) MTU Not Applicable
Caterpillar (USA) Caterpillar Not Applicable
Cummins (UK) Cummins Not Applicable
2 POWER GENERATOR ALTERNATOR Available Not Applicable
Stamford (UK) Stamford Not Applicable
Leroy Somer (Europe) Leroy Somer Not Applicable
2 POWER GENERATOR VENTILLATION FAN Available Not Applicable
Not Applicable
Not Applicable
3 CB PANEL FOR GENERATOR Available
Schneider (BinGhalib PVL) Or Kahramaa Approved Schneider Sent 6 11/Mar/20 420 Days arumugham@binghalib.com
Schneider (Verger PVL) Or Kahramaa Approved Schneider Received 7 11/Mar/20 420 Days satish@vergerswitchgear.com.qa
ABB(Barakat) ABB Sent 8 11/Mar/20 420 Days sukesh@barakatengg.com
ABB(Qtec) Galfar Proposal Received 20 11/Mar/20 420 Days arundas@qtecswitchgear.com
Gazzoi Galfar Proposal Sent 21 11/Mar/20 420 Days azmal@gazzaoui.com.qa
Schneider (Switchgear International) Galfar Proposal Sent 28 11/Mar/20 420 Days basith@switchgearinternational.com
Schneider (Direct) Galfar Proposal Sent 32 11/Mar/20 420 Days biju.mathew@se.com
Jaidha Galfar Proposal Sent 42 14/Mar/20 417 Days raja.j@jaidah.com.qa
Integra Galfar Proposal Sent 47 15/Mar/20 416 Days karthik@integraqatar.com
AMV Solutions Galfar Proposal Sent 48 16/Mar/20 415 Days santhosh@amv-solutions.in
Euro gulf Galfar Proposal Sent 54 17/Mar/20 414 Days engg@eurogulf-me.com
4 FUEL PIPING FOR GENERATOR(Under Mech Documents) Available
GASCO GASCO Sent xx
Jaber Electro Mechanical Co Jaber Sent 24 10/Mar/20 421 Days info@aljaber-em.com
Qatar Gas Group Qatar Gas Group Sent 33 11/Mar/20 420 Days s.khan@taqaqgg.com
Unigaz Qatar Unigaz Qatar Sent xx
Jamco Jamco Sent 27 10/Mar/20 421 Days info@jamcoqatar.com
Power Gas Power Gas Sent 25 10/Mar/20 421 Days INFO@POWERGAS.QA
NIGP NIGP Pending Unable to find the contact details - Called 44500008 from google . The person w
Petroserv LTD Petroserv LTD Sent 26 10/Mar/20 421 Days Info@Petroserv-limited.com
Jaidha Galfar Proposal Sent 42 14/Mar/20 417 Days raja.j@jaidah.com.qa
Galfar Proposal Sent xx
5 TRANSFORMER Available
ABB ABB Sent 29 11/Mar/20 420 Days Mahmoud.Rabei@jaidah.com.qa
Schneider SCHNEIDER Sent 32 11/Mar/20 420 Days biju.mathew@se.com
Siemens Siemens Sent 30 11/Mar/20 420 Days electrical@darwish-tdg.qa
Tesar Tesar (Italy) Sent xx sreejith@escqatar.com
Starline (Galfar Proposal) Galfar Proposal Sent 31 11/Mar/20 420 Days yatin.deo@wattsarty.com
Gazzaoui Galfar Proposal Sent 41 14/Mar/20 417 Days azmal@gazzaoui.com.qa
Jaidha Galfar Proposal Sent 42 14/Mar/20 417 Days raja.j@jaidah.com.qa
Qwave Galfar Proposal Sent 49 16/Mar/20 415 Days isaac@qwaveqatar.com
6 BUS DUCT Not Available
Starline Galfar Proposal Sent 1 7/Mar/20 424 Days yatin.deo@wattsarty.com
Siemens Galfar Proposal 2 7/Mar/20 424 Days azmal@gazzaoui.com.qa

2019-191-OOREDOO- RFQ Status - Electrical and ELV Page 1 of 6


SL NO MATERIAL DESCRIPTION (AS PER BOQ Only) PVL LIST RFQ STATUS RFQ Ref DATE DAYS NAME (Rep.) PHONE NUMBER EMAIL ADDRESS FOLLOWUP DETAILS Communication Notes with Supplier
Schneider Galfar Proposal Received 3 7/Mar/20 424 Days mohammed.sabha@se.com
Power plug bus duct Galfar Proposal Received 4 7/Mar/20 424 Days Siddiq@gulflights.com'
Siemens Galfar Proposal Received 5 7/Mar/20 424 Days biplab.paul@siemens.com
EAE Galfar Proposal Sent 53 17/Mar/20 414 Days sreejith@escqatar.com
GE Galfar Proposal Pending No Contact Details
Jaidha Galfar Proposal Sent 42 14/Mar/20 417 Days raja.j@jaidah.com.qa
7 SMSB-ATS-MCC-DBs Available
Schneider (BinGhalib PVL) Or Kahramaa Approved Schneider Sent 6 10/Mar/20 421 Days arumugham@binghalib.com
Schneider (Verger PVL) Or Kahramaa Approved Schneider Received 7 10/Mar/20 421 Days satish@vergerswitchgear.com.qa
ABB(Barakat) ABB Sent 8 10/Mar/20 421 Days sukesh@barakatengg.com
ABB(Qtec) Galfar Proposal Received 20 10/Mar/20 421 Days arundas@qtecswitchgear.com
Gazzoi Galfar Proposal Sent 21 10/Mar/20 421 Days azmal@gazzaoui.com.qa
Schneider (Switchgear International) Galfar Proposal Sent 28 11/Mar/20 420 Days basith@switchgearinternational.com
Schneider (Direct) Galfar Proposal Sent 32 11/Mar/20 420 Days biju.mathew@se.com
Jaidha Galfar Proposal Sent 42 14/Mar/20 417 Days raja.j@jaidah.com.qa
Siemens Galfar Proposal Sent 5 14/Mar/20 417 Days biplab.paul@siemens.com
Integra Galfar Proposal Sent 47 15/Mar/20 416 Days karthik@integraqatar.com
AMV Solutions Galfar Proposal Sent 48 16/Mar/20 415 Days santhosh@amv-solutions.in
Euro gulf Galfar Proposal Sent 54 17/Mar/20 414 Days engg@eurogulf-me.com
8 LIGHTING CONTROL SYSTEM Not Available
Gazzaoui Galfar Proposal Sent 41 14/Mar/20 417 Days azmal@gazzaoui.com.qa
Siemens Galfar Proposal Sent 5 14/Mar/20 417 Days biplab.paul@siemens.com
Integra Galfar Proposal Sent 47 15/Mar/20 416 Days karthik@integraqatar.com
Galfar Proposal Pending
Galfar Proposal Pending
Galfar Proposal Pending
Galfar Proposal Pending
9 UNINTERRUPTED POWER SUPPLY (Quote Received) Available Not Applicable
Vertiv Vertiv Not Applicable info@qsp.com.qa
Gutor Gutor Not Applicable latha@petrotec.com.qa
Socomec Socomec Not Applicable john@electrops.com
Starline Galfar Proposal Not Applicable yatin.deo@wattsarty.com
Schneider (Direct) Galfar Proposal Not Applicable Thomas Philip (Direct SE)
10 POWER CABLES & WIRING Available
Doha Cables Doha Cables Sent 22 m.muneer@dohacables.com
Nexans Nexans Sent 23 shamsudheen.javeedh@nexans.com'
Gulf Cable Gulf Cable Pending
Oman Cable Oman Cable Pending
10-A CABLE TERMINATIONS Available
Laffan Galfar Proposal Sent 34 11/Mar/20 420 Days laffanco@qatar.net.qa
Adastra Galfar Proposal Received 35 11/Mar/20 420 Days jassilt@adastrawll.com Incomplete Quote
Thunderbolt Galfar Proposal Sent 36 11/Mar/20 420 Days r.george@thunderboltltd.com
Trade House Galfar Proposal Sent 37 11/Mar/20 420 Days manojkumar@tradehouse-qatar.com
AAB Qatar Galfar Proposal Sent 38 11/Mar/20 420 Days John.Tesiorna@aabqatar.com
11 CABLE TRAYS Available
ICMS ICMS Pending
Delta Delta Pending
Or Approved Or Equivalent Pending
12 EARTHING BONDING& LP Available
WALLIS Wallis Sent 34 11/Mar/20 420 Days laffanco@qatar.net.qa
Adastra Galfar Proposal Received 35 11/Mar/20 420 Days jassilt@adastrawll.com Incomplte Quote
Thunderbolt Galfar Proposal Sent 36 11/Mar/20 420 Days r.george@thunderboltltd.com
WJ FURSE Furse Sent 37 11/Mar/20 420 Days manojkumar@tradehouse-qatar.com
AAB Qatar Galfar Proposal Sent 38 11/Mar/20 420 Days John.Tesiorna@aabqatar.com
Or Approved Galfar Proposal Pending
Gazzaoui Galfar Proposal Sent 41 14/Mar/20 417 Days azmal@gazzaoui.com.qa
Jaidha Galfar Proposal Sent 42 raja.j@jaidah.com.qa

2019-191-OOREDOO- RFQ Status - Electrical and ELV Page 2 of 6


SL NO MATERIAL DESCRIPTION (AS PER BOQ Only) PVL LIST RFQ STATUS RFQ Ref DATE DAYS NAME (Rep.) PHONE NUMBER EMAIL ADDRESS FOLLOWUP DETAILS Communication Notes with Supplier
13 LIGHTING INSTALLATION Available
Zumtobel Zumtobel Pending
Disano Disano Sent 43 14/Mar/20 417 Days nihal@alshulah.com
Iguzzini Iguzzini Sent 44 14/Mar/20 417 Days nnatesh@al-dhow.com
Thron Thron Sent Received quote during the tender stage
Philips (Technoq) Philips (Technoq) Pending
Polaris Galfar Proposal Received 50 16/Mar/20 415 Days sumesh@polarismep.com Ref - Prasad Sir
Gulf Lights Galfar Proposal Sent 46 14/Mar/20 417 Days dhinagar@gulflights.com
Zeeman Qatar Galfar Proposal Sent 45 14/Mar/20 417 Days hariprasad@zeemanqatar.com
GE Galfar Proposal Pending
Jaidha Galfar Proposal Sent 42 14/Mar/20 417 Days raja.j@jaidah.com.qa
14 SWITCHES Not Available
MK (Adastra) Galfar Proposal Sent 35 11/Mar/20 420 Days sales@adastrawll.com
Laffan Galfar Proposal Sent 34 11/Mar/20 420 Days laffanco@qatar.net.qa
Thunderbolt Galfar Proposal Sent 36 11/Mar/20 420 Days r.george@thunderboltltd.com
Trade House Galfar Proposal Sent 37 11/Mar/20 420 Days manojkumar@tradehouse-qatar.com
AAB Qatar Galfar Proposal Received 38 11/Mar/20 420 Days John.Tesiorna@aabqatar.com
Gazzaoui Galfar Proposal Sent 41 14/Mar/20 417 Days azmal@gazzaoui.com.qa
Jaidha Galfar Proposal Received 42 14/Mar/20 417 Days raja.j@jaidah.com.qa
15 ISOLATOR Not Available
Laffan Galfar Proposal Sent 34 11/Mar/20 420 Days laffanco@qatar.net.qa
Adastra Galfar Proposal Sent 35 11/Mar/20 420 Days jassilt@adastrawll.com
Thunderbolt Galfar Proposal Sent 36 11/Mar/20 420 Days r.george@thunderboltltd.com
Trade House Galfar Proposal Sent 37 11/Mar/20 420 Days manojkumar@tradehouse-qatar.com
AAB Qatar Galfar Proposal Received 38 11/Mar/20 420 Days John.Tesiorna@aabqatar.com
Gazzaoui Galfar Proposal Sent 41 14/Mar/20 417 Days azmal@gazzaoui.com.qa
Jaidha Galfar Proposal Received 42 14/Mar/20 417 Days raja.j@jaidah.com.qa
16 DUCT PIPE FOR UNDERGROUND Not Available
Galfar Proposal Pending
Galfar Proposal Pending
17 FIRE ALARM SYSTEM
Siemens Siemens
18 PA VA SYSTEM
Qsoft Sent 9 10/Mar/20 421 Days cazy@qsoft-corp.com
Zone Sent 10 10/Mar/20 421 Days rsaravanan@zonetec.net
Fusion Tech Sent 11 10/Mar/20 421 Days admin@fusiontech.qa
Mekadam Sent 12 10/Mar/20 421 Days abhishek@mekdamtech.com
Mannai Sent 13 10/Mar/20 421 Days Manish 66035314 Siju.Muthuparambil@mannai.com.qa
Connections (Ref Suhail) Sent 14 10/Mar/20 421 Days ranju@connections-me.com
Capital Security System (Ref Suhail) Sent 15 10/Mar/20 421 Days sales4@capitalsecuritysystems.com
Sibca Sent 16 10/Mar/20 421 Days justine.jose@sibca.qa
JBK Controls Sent 17 10/Mar/20 421 Days ali.shariff@jbkcontrols.com
Premier (Ref Aneesa) Sent 18 10/Mar/20 421 Days davisbensam@Premierqatar.net'
SOW Qatar Pending
Starline Pending
Schneider (Direct) Pending
GULF BD Group Sent 19 10/Mar/20 421 Days Sajad 30275426 vignesh@gulfbdgroup.com
Gazzaoui Sent 41 14/Mar/20 417 Days azmal@gazzaoui.com.qa
Jaidha Galfar Proposal Sent 42 14/Mar/20 417 Days raja.j@jaidah.com.qa
Siemens Galfar Proposal Sent 5 14/Mar/20 417 Days biplab.paul@siemens.com
19 IT & TELECOM
Qsoft Sent 9 10/Mar/20 421 Days cazy@qsoft-corp.com
Zone Sent 10 10/Mar/20 421 Days rsaravanan@zonetec.net
Fusion Tech Sent 11 10/Mar/20 421 Days admin@fusiontech.qa
Mekadam Sent 12 10/Mar/20 421 Days abhishek@mekdamtech.com
Mannai Received 13 10/Mar/20 421 Days Manish 66035314 Siju.Muthuparambil@mannai.com.qa
Connections (Ref Suhail) Sent 14 10/Mar/20 421 Days ranju@connections-me.com

2019-191-OOREDOO- RFQ Status - Electrical and ELV Page 3 of 6


SL NO MATERIAL DESCRIPTION (AS PER BOQ Only) PVL LIST RFQ STATUS RFQ Ref DATE DAYS NAME (Rep.) PHONE NUMBER EMAIL ADDRESS FOLLOWUP DETAILS Communication Notes with Supplier
Capital Security System (Ref Suhail) Sent 15 10/Mar/20 421 Days sales4@capitalsecuritysystems.com
Sibca Sent 16 10/Mar/20 421 Days justine.jose@sibca.qa
JBK Controls Sent 17 10/Mar/20 421 Days ali.shariff@jbkcontrols.com
Premier (Ref Aneesa) Sent 18 10/Mar/20 421 Days davisbensam@Premierqatar.net'
SOW Qatar Pending
Starline Pending yatin.deo@wattsarty.com
Schneider (Direct) Pending Thomas Philip (Direct SE)
GULF BD Group Sent 19 10/Mar/20 421 Days Sajad 30275426 vignesh@gulfbdgroup.com
Gazzaoui Sent 41 14/Mar/20 417 Days azmal@gazzaoui.com.qa
Jaidha Galfar Proposal Sent 42 14/Mar/20 417 Days raja.j@jaidah.com.qa
Siemens Galfar Proposal Sent 5 14/Mar/20 417 Days biplab.paul@siemens.com
20 ACCESS CONTROL SYSTEM
Qsoft Sent 9 10/Mar/20 421 Days cazy@qsoft-corp.com
Zone Sent 10 10/Mar/20 421 Days rsaravanan@zonetec.net
Fusion Tech Sent 11 10/Mar/20 421 Days admin@fusiontech.qa
Mekadam Sent 12 10/Mar/20 421 Days abhishek@mekdamtech.com
Mannai Received 13 10/Mar/20 421 Days Manish 66035314 Siju.Muthuparambil@mannai.com.qa
Connections (Ref Suhail) Sent 14 10/Mar/20 421 Days ranju@connections-me.com
Capital Security System (Ref Suhail) Sent 15 10/Mar/20 421 Days sales4@capitalsecuritysystems.com
Sibca Sent 16 10/Mar/20 421 Days justine.jose@sibca.qa
JBK Controls Sent 17 10/Mar/20 421 Days ali.shariff@jbkcontrols.com
Premier (Ref Aneesa) Sent 18 10/Mar/20 421 Days davisbensam@Premierqatar.net'
SOW Qatar Pending
Starline Pending yatin.deo@wattsarty.com
Schneider (Direct) Pending Thomas Philip (Direct SE)
GULF BD Group Sent 19 10/Mar/20 421 Days Sajad 30275426 vignesh@gulfbdgroup.com
Gazzaoui Sent 41 14/Mar/20 417 Days azmal@gazzaoui.com.qa
Jaidha Galfar Proposal Sent 42 14/Mar/20 417 Days raja.j@jaidah.com.qa
Siemens Galfar Proposal Sent 5 14/Mar/20 417 Days biplab.paul@siemens.com
21 CCTV SYSTEM
Qsoft Sent 9 10/Mar/20 421 Days cazy@qsoft-corp.com
Zone Sent 10 10/Mar/20 421 Days rsaravanan@zonetec.net
Fusion Tech Sent 11 10/Mar/20 421 Days admin@fusiontech.qa
Mekadam Sent 12 10/Mar/20 421 Days abhishek@mekdamtech.com
Mannai Received 13 10/Mar/20 421 Days Manish 66035314 Siju.Muthuparambil@mannai.com.qa
Connections (Ref Suhail) Sent 14 10/Mar/20 421 Days ranju@connections-me.com
Capital Security System (Ref Suhail) Sent 15 10/Mar/20 421 Days sales4@capitalsecuritysystems.com
Sibca Sent 16 10/Mar/20 421 Days justine.jose@sibca.qa
JBK Controls Sent 17 10/Mar/20 421 Days ali.shariff@jbkcontrols.com
Premier (Ref Aneesa) Sent 18 10/Mar/20 421 Days davisbensam@Premierqatar.net'
SOW Qatar Pending
Starline Pending yatin.deo@wattsarty.com
Schneider (Direct) Pending Thomas Philip (Direct SE)
GULF BD Group Sent 19 10/Mar/20 421 Days Sajad 30275426 vignesh@gulfbdgroup.com
Gazzaoui Sent 41 14/Mar/20 417 Days azmal@gazzaoui.com.qa
Jaidha Galfar Proposal Sent 42 14/Mar/20 417 Days raja.j@jaidah.com.qa
Siemens Galfar Proposal Sent 5 14/Mar/20 417 Days biplab.paul@siemens.com
22 ELECTRICAL POWER MONITORING SYSTEM
Not Applicable as instructed by Client/ Consultant
23 BUILDING MANAGEMENT SYSTEM
Pending
Pending
Pending
24 LIFT AND ELEVATORS
Mtbshi Sent 39 12/Mar/20 419 Days gopi@arabiangulfmelco.com
Kone Received 40 12/Mar/20 419 Days Maricar.Gaviola@kone.com
Otis Sent 52 17/Mar/20 414 Days Otis.Qatar@otis.com

2019-191-OOREDOO- RFQ Status - Electrical and ELV Page 4 of 6


SL NO MATERIAL DESCRIPTION (AS PER BOQ Only) PVL LIST RFQ STATUS RFQ Ref DATE DAYS NAME (Rep.) PHONE NUMBER EMAIL ADDRESS FOLLOWUP DETAILS Communication Notes with Supplier
25 Fire Detection & Alarm System
Siemens Sent 11/Mar/20 420 Days
Qatar Factory Siemens Received 23/Jan/20 468 Days Proposed VESDA-Xtralis, Deviation from PVL
G4s Sent 1/Jan/20 490 Days
26 Fire Fighting systems
Qatar Factory Qatar Factory Received 23/Jan/20 468 Days Proposed VESDA-Xtralis, Deviation from PVL
Al Majeed Technology Sent 23/Jan/20 468 Days
G4s Sent 1/Jan/20 490 Days
SFS Sent 17/Mar/20 414 Days
27 Pre-Action System
Thompson Galfar Proposal Received 10/Mar/20 421 Days Reliable or HD Fire Proposed
G4s Sent 1/Jan/20 490 Days
Qatar Factory Qatar Factory Received 23/Jan/20 468 Days
28 NOVEC 1230 System
Siemens Sent 15/Mar/20 416 Days
Qatar Factory Qatar Factory Received 23/Jan/20 468 Days Proposed VESDA-Xtralis, Deviation from PVL
G4S Sent 1/Jan/20 490 Days
Thompson Ansul Received 10/Mar/20 421 Days Advised to revise by including Reserve Cylinder
Quoted for Supply & Commissioing only. Requested for Oprional
Defensa Kidde Received 10/Mar/20
Price for SITC.
Chubb Kidde USA Received 10/Mar/20 421 Days
29 Aerosol System
Thompson Firepro Received 10/Mar/20 421 Days Proposed Fire-Pro
Chubb Firepro Sent 10/Mar/20 421 Days
Qatar Factory Firepro Received 23/Jan/20 468 Days
30 Aspirated Smoke Detection System
Qatar Factory Received 23/Jan/20 468 Days Proposed VESDA-Xtralis, Deviation from PVL
Pending
Pending

2019-191-OOREDOO- RFQ Status - Electrical and ELV Page 5 of 6


049. Woqod LPG Plant Facilities Security System Upgrade and Miscellaneous Works
SL NO MATERIAL DESCRIPTION (AS PER BOQ Only) BRAND OFFERED PVL LIST RFQ STATUS RFQ Ref DATE DAYS NAME (Rep.) PHONE NUMBER EMAIL ADDRESS FOLLOWUP DETAILS Communication Notes with Supplier 5/5/2021
Fire Alarm, Telecom, CCTV & ACS
1 Vignesh (GBDG) Sent 1 13/Jan/21 112 Days
2 Karthikeyan (Almana) Sent 2 13/Jan/21 112 Days
3 Seema (Fusion) Sent 3 13/Jan/21 112 Days
4 Liju (Jumbo) Sent 4 13/Jan/21 112 Days
5 Absheer Ali (SIBCA) Sent 5 13/Jan/21 112 Days
6 Sateesh (Mekdam) Sent 6 13/Jan/21 112 Days
7 Eurotech(Presales) Sent 7 13/Jan/21 112 Days
8 Eshhrholding Sent 8 13/Jan/21 112 Days
9 Adaxbs Sent 9 13/Jan/21 112 Days
Light Fixtures
10 nihal@alshulah.com Sent 10 14/Jan/21 111 Days
11 nnatesh@al-dhow.com Sent 11 14/Jan/21 111 Days
12 sumesh@polarismep.com Sent 12 14/Jan/21 111 Days
13 dhinagar@gulflights.com Sent 13 14/Jan/21 111 Days
14 siyad@petroconecc.com Sent 14 14/Jan/21 111 Days
44321 Days
44321 Days
44321 Days
44321 Days
44321 Days
44321 Days

2019-191-OOREDOO- RFQ Status - Electrical and ELV Page 6 of 6