The document discusses the use of the Project Manager in AutoCAD Electrical for managing technical documentation projects. It describes how to create and open projects, add new and existing drawings to projects, configure drawing properties and display settings, copy and delete entire projects, and organize drawings within a project. The Project Manager allows grouping related wiring diagrams, setting project defaults, and managing project metadata.
The document discusses the use of the Project Manager in AutoCAD Electrical for managing technical documentation projects. It describes how to create and open projects, add new and existing drawings to projects, configure drawing properties and display settings, copy and delete entire projects, and organize drawings within a project. The Project Manager allows grouping related wiring diagrams, setting project defaults, and managing project metadata.
The document discusses the use of the Project Manager in AutoCAD Electrical for managing technical documentation projects. It describes how to create and open projects, add new and existing drawings to projects, configure drawing properties and display settings, copy and delete entire projects, and organize drawings within a project. The Project Manager allows grouping related wiring diagrams, setting project defaults, and managing project metadata.
Instructor : PhD, Associate Professor Leyla Muradkhanli
Objectives • Create new projects and drawings • Edit the properties of projects and drawings • Working with drawings • Working with project drawings • Copying and deleting a project Project File AutoCAD Electrical is a project-based software in which wiring diagrams related to each other are grouped under a project. A project is a set of electrical wiring diagrams that form a project file <project_name>.wdp Project File A project file is an ASCII text file with a .wdp extension that stores information about a project. A project file contains some of the following information: • Project description lines • Project default settings • Project drawing list, including: • Complete path information • Drawing description lines • Section and subsection assignments • Other miscellaneous catalog and symbol library settings Project Manager The Project Manager is used to create new projects, open existing projects, add new drawings to a project, re-order drawing files, access existing projects, and modify existing information in a project. Project Manager Project Manager Project Manager Opening a Project Use Open Project button from the Project Manager to open an existing project. Creating a New Project Use New Project button from the Project Manager to create a new project. Project Description Creating a New Drawings The New Drawing button is used to create a new drawing file. Choose the New Drawing button from the Project Manager; The Create New Drawing dialog box will be displayed. Drawing Properties Adding a New Drawing to the Current Project • Choose the New Drawing button from the Project Manager; • The Create New Drawing dialog box will be displayed; • Enter the required information and choose the OK button. A new drawing will be created. This drawing will automatically be added to the active project. Adding a New Drawing to the Current Project • To add this drawing to an inactive project, right-click on the inactive project name and choose the Add Active Drawing option from the shortcut menu displayed; • The Apply Project Defaults to Drawing Setting message box will be displayed; • Choose the Yes button. • If you choose the No button, the new drawing will retain its existing settings. Apply Project Defaults to Drawing Settings Adding Existing Drawing to the Current Project
• Right-click on the project name
in the Projects rollout of the Project Manager; • Choose the Add Drawings option from the shortcut menu; Adding Existing Drawing to the Current Project • The Select Files to Add dialog box will be displayed; • Select the drawing to be added to the project from dialog box; • Choose the Add button; Adding Existing Drawing to the Current Project • The Apply Project Defaults to Drawing Settings message box will be displayed; Creating the Order of Drawings in a Project • Right-click on the project name and choose the Sort option from the shortcut menu displayed; • If the project contains subfolder(s), the Sort Options message box will be displayed showing four different combinations of options; Creating the Order of Drawings in a Project Creating the Order of Drawings in a Project • Choose one of these options as per your requirement; • The Sort Fields dialog box will be displayed; • Select the required option from the Primary sort, Secondary sort, Third sort, and Fourth sort drop-down lists.
• REF (reference status)
• SEC (section code) • SUBSEC (sub-section) • FILEPATHANDNAME (file path and name) Removing a Drawing from a Project First Method : • Right-click on the drawing name in the Project Manager; • Choose the Remove option from the shortcut menu; • The Project Manager-Remove Files message box will be displayed; • Choose the Yes button from the message box. Removing a Drawing from a Project Second Method : • Right-click on a project name; • Choose the Remove Drawings option from the shortcut menu; • the Select Drawing to Process dialog box will be displayed. Removing a Drawing from a Project Assigning a Description to a Drawing • Right-click on the name of a drawing in the project; • Choose Properties > Drawing Properties from the shortcut menu; • The Drawing Properties dialog box will be displayed. Drawing Properties dialog box Configuring the Drawing List Display • The Drawing List Display Configuration button is used to display the required information such as drawing number, description, and so on. • By default, only the name of the drawing is displayed in the Projects rollout of the Project Manager. Configuring the Drawing List Display Configuring the Drawing List Display • Choose the Drawing List Display Configuration button the Project Manager. • The Drawing List Display Configuration dialog box will be displayed. Configuring the Drawing List Display
• Choose the OK button;
• The entire information related to drawings will be displayed in the Projects rollout. Copying a Project • The Copy tool is used to copy the entire project. • Choose the Copy tool from the Project Tools panel of the Project tab; • The Copy Project : Step 1 – Select Existing Project to Copy wizard will be displayed. Copying a Project • Choose the OK button; • The Copy Project : Step 2 – Select path and name for new project wizard will be displayed. Copying a Project • Choose the Save button; • The Select Drawings to Process dialog box will be displayed. Copying a Project • Select the drawing files that you want to copy; • Choose the Process button; Choose the OK button. Copying a Project • Copy Project : Step 4 – Enter Bath Path for Project Drawings wizard will be displayed. Copying a Project • Copy Project : Step 5 – Adjust new drawing file names wizard will be displayed. Deleting a Project • Choose the Delete button from the Project Tools panel of the Project tab; • The Select Existing Project to Delete dialog box will be displayed. Deleting a Project • The Project File Delete Utility dialog box will be displayed. Project Manager Components 40 41 Buttons Publish/Plot button Project Selection Drop-down list Project Rollout Title Block Update Publish Properties Exception List Properties Exception List Project Properties Project Manager Copy To dialog box Replace Settings Compare Details/Preview Rollout