REKAPITULASI TOTAL HM & SOLAR PERIODE JUNI-AGUSTUS 2020

PT. NAGA SAKTI ASIA JOB SITE SEBUHUR

JUNI JULI AGUSTUS TOTAL PER UNIT RATA-RATA PER UNIT


NO UNIT
HM Solar Prod. HM Solar Prod. HM Solar Prod. HM Solar Prod. HM Solar Prod.
Exca. SY 215 (NST-07) 294.4 6,090 184.0 3,845 163.5 3,395 641.9 13,330 214.0 4,443.3
Exca. SY 245 (NST-82) 55.4 1,188 140.4 3,110 255.6 7,047 451.4 11,345 150.5 3,781.7
1

CG : 14.027 Ton

CG : 24.152 Ton
Exca. SY 365 (NST-102) 284.3 9,131 123.2 3,588 372.0 11,873 779.5 24,592 259.8 8,197.3

CG : 7.395 Ton

CG : 2.730 Ton

CG : 8.051 Ton
Exca. SY 365 (NST-134) 402.1 12,018 236.4 6,420 341.4 10,799 979.9 29,237 326.6 9,745.7
2 Grader NST-111 146.9 1,793 125.5 2,039 67.4 900 339.8 4,732 113.3 1,577.3
Dozer NST-139 368.3 9,161 212.9 5,586 69.7 1,675 650.9 16,422 217.0 5,474.0
3
Dozer NST-141 24.6 797 27.9 640 392.6 8,383 445.1 9,820 148.4 3,273.3
SANY DT-13 27.9 287 27.9 287 27.9 287.0
SANY DT-14 224.7 1,842 224.7 1,842 224.7 1,842.0
SANY DT-17 62.3 870 125.1 499 187.4 1,369 93.7 684.5
SANY DT-18 5.5 185 84.1 1,045 236.4 1,884 326.0 3,114 108.7 1,038.0
SANY DT-19 186.1 2,221 107.4 1,075 63.3 665 356.8 3,961 118.9 1,320.3

OB : 153.022 BCM
SANY DT-36 171.3 1,091 171.3 1,091 171.3 1,091.0
OB : 49.104 BCM

OB : 39.851 BCM

OB : 64.067 BCM

OB : 51.007 BCM
4 SANY DT-37 257.4 1,882 257.4 1,882 257.4 1,882.0
SANY DT-40 168.2 1,805 148.8 1,695 245.0 1,961 562.0 5,461 187.3 1,820.3
SANY DT-41 236.6 2,382 138.0 1,527 374.6 3,909 187.3 1,954.5
SANY DT-42 134.9 1,400 137.6 1,240 312.9 2,591 585.4 5,231 195.1 1,743.7
SANY DT-43 225.5 2,185 377.1 2,827 602.6 5,012 301.3 2,506.0
SANY DT-44 275.9 3,183 174.9 1,714 369.7 3,064 820.5 7,961 273.5 2,653.7
SANY DT-45 271.7 2,667 149.8 1,748 275.5 1,965 697.0 6,380 232.3 2,126.7
TOTAL 3,108 56,493 2,053 36,142 4,321 64,343 9,482 156,978 3,809.0 57,442.3
RATA-RATA 194.3 3,531 136.9 2,409 240.0 3,575 474.1 7,849 190.5 2,872
Item Juni Juli Agustus
Hour Meter (jam) 3,108 2,053 9,482 Akumulasi Pema
Solar (liter) 56,493 36,142 64,343 Periode Juni-Agu
Over Burden (bcm 49,104 39,851 64,067
Coal Getting (ton) 7,395 2,730 24,152

Bulan Hour Meter (j Solar (liter) Over Burden ( Coal Getting (ton)
56,493
Juni 3,108 56,493 49,104 7,395
Juli 2,053 36,142 39,851 2,730
49,104
Agustus 9,482 156,978 64,067 24,152
Total 14,643 249,613 153,022 34,277

7,395
3,108

Juni
kumulasi Pemakaian HM-Solar-Produksi All Unit
eriode Juni-Agustus 2020

64,343 64,067

6,493

49,104

Hour Meter (jam)


39,851 Solar (liter)
36,142 Over Burden (bcm)
Coal Getting (ton)

24,152

9,482
7,395
2,053 2,730

Juni Juli Agustus