Harga Satuan Pokok Kegiatan Pemerintah Kabupaten Sampang TAHUN 2016
Harga Satuan Pokok Kegiatan Pemerintah Kabupaten Sampang TAHUN 2016
Bahan:
Semen Portland 326.0000 kg 1,782.50 Rp 581,095.00
Pasir Beton 0.5428 m3 327,750.00 Rp 177,902.70
Kerikil (maksimum 30mm) 0.7622 m3 70,000.00 Rp 53,355.55
Air 215.0000 Liter #REF! #REF!
Jumlah: #REF!
Nilai HSPK : #REF!
1 m³ Pekerjaan Beton K-125 SNI 7394 : 2008
Tenaga:
Mandor 0.0830 O.H 81,000.00 Rp 6,723.00
Kepala Tukang Batu 0.0280 O.H 70,000.00 Rp 1,960.00
Tukang Batu 0.2750 O.H 37,620.00 Rp 10,345.50
Pekerja/Buruh Tak Terampil 1.6500 O.H 37,620.00 Rp 62,073.00
Jumlah: Rp 81,101.50
Bahan:
Semen Portland 276.0000 kg 1,782.50 Rp 491,970.00
Pasir Beton 0.5914 m3 327,750.00 Rp 193,831.35
Kerikil (maksimum 30mm) 0.7496 m3 70,000.00 Rp 52,472.00
Air 215.0000 Liter #REF! #REF!
Jumlah: #REF!
Nilai HSPK : #REF!
1 m² Pemasangan Paving Stone
(Blok) Tbl.8 cm abu-abu Segi enam
Tenaga:
Mandor 0.0250 O.H 81,000.00 2,025.00
Kepala Tukang Batu 0.0250 O.H 70,000.00 1,750.00
Tukang Batu 0.2500 O.H 37,620.00 9,405.00
Pekerja/Buruh Tak Terampil 0.5000 O.H 37,620.00 18,810.00
Jumlah: 31,990.00
Bahan:
Paving Stone Tb 8 cm Segi Enam Abu-abu 33.0000 buah #REF! #REF!
Jumlah: #REF!
Nilai HSPK : #REF!
1 m² Pemasangan Paving Stone
(Blok) Tbl.6 cm abu-abu Segi enam
Tenaga:
Mandor 0.0250 O.H 81,000.00 2,025.00
Kepala Tukang Batu 0.0250 O.H 70,000.00 1,750.00
Tukang Batu 0.2500 O.H 37,620.00 9,405.00
Pekerja/Buruh Tak Terampil 0.5000 O.H 37,620.00 18,810.00
Jumlah: 31,990.00
Bahan:
Paving Stone Abu-2 Tb 6 cm Segi Enam Abu-abu 33.0000 buah #REF! #REF!
Jumlah: #REF!
Nilai HSPK : #REF!
1 m² Pemasangan Paving Stone
(Blok) Tbl.8 cm Abu-2 Persegi Panjang
Tenaga:
Mandor 0.0250 kg 81,000.00 2,025.00
Kepala Tukang Batu 0.0250 O.H 70,000.00 1,750.00
Tukang Batu 0.2500 O.H 37,620.00 9,405.00
Pekerja/Buruh Tak Terampil 0.7500 O.H 37,620.00 28,215.00
Jumlah: 41,395.00
Bahan:
Paving Stone Abu-2 Tb 8 cm Persegi Panjang 43.0000 buah #REF! #REF!
Jumlah: #REF!
Nilai HSPK : #REF!
1 m² Pemasangan Paving Stone
(Blok) Tbl.6 cm Abu-2 Persegi Panjang
Tenaga:
Mandor 0.0250 O.H 81,000.00 2,025.00
Kepala Tukang Batu 0.0250 O.H 70,000.00 1,750.00
Tukang Batu 0.2500 O.H 37,620.00 9,405.00
Pekerja/Buruh Tak Terampil 0.5000 O.H 37,620.00 18,810.00
Jumlah: 31,990.00
Bahan:
Paving Stone Abu-2 Tb 6 cm Persegi Panjang 50.0000 buah #REF! #REF!
Jumlah: #REF!
Nilai HSPK : #REF!
1 m² Pekerjaan Plesteran
1 Pc : 4 Ps tebal 15 mm SNI 2837 : 2008
Tenaga:
Mandor 0.0150 O.H 81,000.00 1,215.00
Kepala Tukang Batu 0.0150 O.H 75,000.00 1,125.00
Tukang Batu 0.1500 O.H 70,000.00 10,500.00
Pekerja/Buruh Tak Terampil 0.3000 O.H 37,620.00 11,286.00
Jumlah: 24,126.00
Bahan:
Semen Portland 6.2400 kg 1,782.50 11,122.80
Pasir Pasang 0.0240 m3 263,900.00 6,333.60
Jumlah: 17,456.40
Nilai HSPK : 41,582.40
1 m³ Pekerjaan Galian tanah biasa SNI 2835 : 2008
sedalam 1 meter
Tenaga:
Mandor 0.0250 O.H 81,000.00 2,025.00
Pekerja/Buruh Tak Terampil 0.7500 O.H 37,620.00 28,215.00
Jumlah: 30,240.00
Nilai HSPK : 30,240.00
1 m² Pekerjaan Pembersihan Lapangan SNI 03-2835-2002 Analisa Biaya
dan Perataan Konstruksi Bangunan Gedung dan
Perumahan Pek. Persiapan (6.8)
Tenaga:
Mandor 0.0500 O.H 81,000.00 4,050.00
Pekerja/Buruh Tak Terampil 0.1000 O.H 37,620.00 3,762.00
Jumlah: Rp 7,812.00
Nilai HSPK : Rp 7,812.00
HARGA (Rp)
NO URAIAN PEKERJAAN VOLUME
SATUAN JUMLAH
1 2 3 4 5
I PEKERJAAN PERSIAPAN
2 Pembersihan Lokasi 24.00 M2 25,000.00 600,000.00
1 Pek. Bowplank dan Pengukuran 20.00 M 50,000.00 1,000,000.00
Jumlah : Sub Total : 1,600,000.00
II PEKERJAAN TANAH DAN URUGAN
1 Galian Tanah Pondasi 8.00 M3 55,000.00 440,000.00
2 Urugan Pasir Bawah Pondasi 2.00 M3 175,000.00 350,000.00
3 Urugan Pasir Bawah Lantai 1.00 M3 175,000.00 175,000.00
4 Urugan Tanah Kembali 2.00 M3 20,000.00 40,000.00
Sub Total : 1,005,000.00
III PEKERJAAN PASANGAN
1 Pas. Pondasi Batu Kali 1:8 11.00 M3 612,784.00 6,740,624.00
2 Pas. Bt Merah 1:4 6.00 M3 87,798.00 526,788.00
Sub Total 7,267,412.00
IV PEKERJAAN BETON
1 Pas Beton Sloof 15/15 1.00 M¹ 7,467,312.00 7,467,312.00
2 Pas Beton Kolom 15/15 1.00 M³ 7,467,312.00 7,467,312.00
3 Pas Ring Balk 15/15 1.00 M¹ 7,467,312.00 7,467,312.00
4 Rabat Beton t = 7 Cm 1.00 M³ 557,951.00 557,951.00
Sub Total 22,959,887.00
V PLESTERAN DINDING
1 Plesretan dinding 1:4 90.03 M2 30,032.00 2,703,780.96
Sub Total 2,703,780.96
VI PEKERJAAN PINTU DAN ROSTER
1 Pas Pintu PVC 2.00 bhn 400,000.00 800,000.00
2 Pas Roster 1.00 M2 32,035.00 32,035.00
Sub Total 832,035.00
VII PEKERJAAN KERAMIK
1 Pas Keramik Lantai 20/20 18.00 M2 485,187.00 8,733,366.00
2 Pas Keramik Dinding 20/25 32.00 M2 415,710.00 13,302,720.00
Sub Total 22,036,086.00
VIII PEKERJAAN RANGKA ATAP
1 Pas Gording Kayu Kruing 6/12 1.00 M3 6,419,560.00 6,419,560.00
2 Pas Usuk Kayu Meranti 4/6 1.00 M3 57,000.00 57,000.00
3 Pas Lisplank 3/30 Kayu Meranti 1.00 M3 300,000.00 300,000.00
4 Pas Konsol Kayu Kruing 1.00 M3 6,419,560.00 6,419,560.00
5 Pas Penampung Air 1.00 M3 3,400,000.00 3,400,000.00
Sub Total 16,596,120.00
Total : 75,000,320.96
Dibulatkan : 75,000,000.00
Sampang, 29 Maret 2021
SARBAN
HARGA SATUAN POKOK KEGIATAN
PEMERINTAH KABUPATEN SAMPANG
TAHUN 2016
65
NO. URAIAN KEGIATAN Koef. SATUAN HARGA SATUAN HARGA
Tenaga:
Mandor 0.2830 O.H 95,000.00 26,885.00
Kepala Tukang Batu 0.3230 O.H 88,500.00 28,585.50
Tukang Besi 1.4000 O.H 82,500.00 115,500.00
Tukang Kayu 1.5600 O.H 82,500.00 128,700.00
Tukang Batu 0.2750 O.H 82,500.00 22,687.50
Pekerja / Buruh Tak Terampil 5.6500 O.H 76,500.00 432,225.00
Jumlah: 754,583.00
Bahan:
Kayu meranti 0.2700 m3 102,500.00 27,675.00
Paku 5cm-12cm 2.0000 Kg 18,950.00 37,900.00
Minyak Bekesting (solar) 0.6000 Ltr 7,500.00 4,500.00
Besi Beton Polos 210.0000 Kg 123,450.00 25,924,500.00
Kawat Beton 3.0000 Kg 19,800.00 59,400.00
Semen Portland 336.0000 kg 1,890.00 635,040.00
Pasir Beton 0.5400 m3 345,800.00 186,732.00
Kerikil 0.8100 m3 333,000.00 269,730.00
Jumlah: 27,145,477.00
Nilai HSPK : 27,900,060.00
HARGA SATUAN POKOK KEGIATAN
PEMERINTAH KABUPATEN SAMPANG
TAHUN 2016
Sampang, 2017
Kelompok Masyarakat Pokmas
"HARAPAN KITA "
Ketua
SAHIDI
#NAME?
KELOMPOK MASYARAKAT (POKMAS)
#NAME?
“KENARI”
#NAME?
DESA RAGUNG KECAMATAN PENGARENGAN KABUPATEN SAMPANG
Jumlah Rencana #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Rencana Komulatif #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Realisasi
Deviasi
Sampang, 2017
0
0.00
0
PANITIA RENOVASI MUSHOLLA MIFTAHUL FALAH
Sekertariat : Dusun Ragung Utara Desa Ragung
Kec. Pangarengan Kab. Sampang
HP 087849818588
KETUA PANITIA
MOH. ARIF
0
HARGA JUMLAH
NO URAIAN BAHAN VOLUME SAT.
SATUAN HARGA
1 Batu pecah 5/7 358 M3 135,000 48,330,000
2 Batu Pecah 10/15 297 M3 110,000 32,670,000
3 Batu Pecah 15/20 165 M 3
125,000 20,625,000
4 Sewa walles 25 Hr 500,000 12,500,000
5 Mobilisasi walles 1 Ls 1,500,000 1,500,000
6 Sirtu 481 M3 70,000 33,649,000
7 Benang nilon 18 Rol 10,000 176,000
8 Gerobak dorong / Argo 7 Bh 450,000 3,150,000
9 Skrup 8 Bh 65,000 520,000
10 Prasasti 1 Ls 750,000 750,000
11 Ongkos Tukang 1 Ls 46,130,000 46,130,000
JUMLAH 200,000,000
0
10,000 176,000
450,000 3,150,000
65,000 520,000
Jumlah : 3,846,000 AINUL YAQIN
70,000 5,608,167
125,000 6,875,000
110,000 4,667,143
Jumlah : 17,150,310 MIRUDDIN
70,000 5,608,167
110,000 4,667,143
Jumlah : 10,275,310 MIRUDDIN 3000
70,000 5,608,167 2500
125,000 6,875,000 2000
110,000 4,667,143
Jumlah : 17,150,310 MIRUDDIN
70,000 5,608,167
110,000 4,667,143
Jumlah : 10,275,310 MIRUDDIN
70,000 5,608,167
135,000 24,165,000
110,000 4,667,143
Jumlah : 34,440,310 MIRUDDIN
135,000 24,165,000
110,000 4,667,143
Jumlah : 28,832,143 MIRUDDIN
125,000 6,875,000
110,000 4,667,143
70,000 5,608,167
Jumlah : 17,150,310 MIRUDDIN
500,000 12,500,000
1,500,000 1,500,000
Jumlah : 14,000,000 IDRIS EFENDI
750,000 750,000
Jumlah : 750,000 HERIYANTO
46,130,000 46,130,000
Jumlah : 46,130,000 MAWARDI
JUMLAH TOTAL : 200,000,000
HARGA JUMLAH
500,000 12,500,000
1,500,000 1,500,000
Jumlah : 14,000,000
750,000 750,000
Jumlah : 750,000
46,130,000 46,130,000
Jumlah : 46,130,000
JUMLAH TOTAL : 200,000,000
NO NAMA UPAH/hr VOLUME JUMLAH KET. Ttd.
1 Mawardi 100,000 42 hari 4,200,000 Mandor
2 Mat Rawi 85,000 42 hari 3,570,000 Kep. Tukang
3 Suja'i 80,000 41 hari 3,280,000 Operator sopir
4 Marsuki 60,000 41 hari 2,460,000 Pembantu sopir
5 Mattingwar 80,000 41 hari 3,280,000 Tukang batu
6 Hamdani 80,000 41 hari 3,280,000 Tukang batu
7 Sujali 80,000 41 hari 3,280,000 Tukang batu
8 Arofek 80,000 41 hari 3,280,000 Tukang batu
9 Syamsul 60,000 40 hari 2,400,000 Pekerja
10 Baydewi 60,000 40 hari 2,400,000 Pekerja
11 Arifin 60,000 40 hari 2,400,000 Pekerja
12 Dulhamit 60,000 40 hari 2,400,000 Pekerja
13 Badrus 60,000 42 hari 2,520,000 Pekerja
14 Halimi 60,000 42 hari 2,520,000 Pekerja
15 Kader 60,000 42 hari 2,520,000 Pekerja
16 Sapek 60,000 39 hari 2,340,000 Pekerja
JUMLAH 46,130,000
Sampang, 23 Januari 2017
REKAP ONGKOS TUKANG MINGGUAN
MINGGU KE : I (Satu)
NO NAMA UPAH/hr VOLUME JUMLAH KET.
1 Mawardi 100,000 7 hari 700,000 Mandor
2 Mat Rawi 85,000 7 hari 595,000 Kep. Tukang
3 Suja'i 80,000 7 hari 560,000 Operator sopir
4 Marsuki 60,000 7 hari 420,000 Pembantu sopir
5 Mattingwar 80,000 7 hari 560,000 Tukang batu
6 Hamdani 80,000 7 hari 560,000 Tukang batu
7 Sujali 80,000 7 hari 560,000 Tukang batu
8 Arofek 80,000 7 hari 560,000 Tukang batu
9 Syamsul 80,000 7 hari 560,000 Tukang batu
10 Baydewi 80,000 7 hari 560,000 Tukang batu
11 Arifin 60,000 7 hari 420,000 Pekerja
12 Dulhamit 60,000 7 hari 420,000 Pekerja
13 Badrus 60,000 7 hari 420,000 Pekerja
14 Halimi 60,000 7 hari 420,000 Pekerja
15 Kader 60,000 7 hari 420,000 Pekerja
16 Sapek 60,000 7 hari 420,000 Pekerja
JUMLAH 8,155,000
Sampang, 19 Desember 2016
REKAP ONGKOS TUKANG MINGGUAN
MINGGU KE : II (Dua)
NO NAMA UPAH/hr VOLUME JUMLAH KET.
1 Mawardi 100,000 7 hari 700,000 Mandor
2 Mat Rawi 85,000 7 hari 595,000 Kep. Tukang
3 Suja'i 80,000 7 hari 560,000 Operator sopir
4 Marsuki 60,000 7 hari 420,000 Pembantu sopir
5 Mattingwar 80,000 7 hari 560,000 Tukang batu
6 Hamdani 80,000 7 hari 560,000 Tukang batu
7 Sujali 80,000 7 hari 560,000 Tukang batu
8 Arofek 80,000 7 hari 560,000 Tukang batu
9 Syamsul 80,000 7 hari 560,000 Tukang batu
10 Baydewi 80,000 7 hari 560,000 Tukang batu
11 Arifin 60,000 7 hari 420,000 Pekerja
12 Dulhamit 60,000 7 hari 420,000 Pekerja
13 Badrus 60,000 7 hari 420,000 Pekerja
14 Halimi 60,000 7 hari 420,000 Pekerja
15 Kader 60,000 7 hari 420,000 Pekerja
16 Sapek 60,000 5 hari 300,000 Pekerja
JUMLAH 8,035,000
Sampang, 26 Desember 2016
REKAP ONGKOS TUKANG MINGGUAN
MINGGU KE : III (Tiga)
NO NAMA UPAH/hr VOLUME JUMLAH KET.
1 Mawardi 100,000 7 hari 700,000 Mandor
2 Mat Rawi 85,000 7 hari 595,000 Kep. Tukang
3 Suja'i 80,000 7 hari 560,000 Operator sopir
4 Marsuki 60,000 7 hari 420,000 Pembantu sopir
5 Mattingwar 80,000 7 hari 560,000 Tukang batu
6 Hamdani 80,000 7 hari 560,000 Tukang batu
7 Sujali 80,000 7 hari 560,000 Tukang batu
8 Arofek 80,000 7 hari 560,000 Tukang batu
9 Syamsul 80,000 7 hari 560,000 Tukang batu
10 Baydewi 80,000 7 hari 560,000 Tukang batu
11 Arifin 60,000 7 hari 420,000 Pekerja
12 Dulhamit 60,000 7 hari 420,000 Pekerja
13 Badrus 60,000 7 hari 420,000 Pekerja
14 Halimi 60,000 7 hari 420,000 Pekerja
15 Kader 60,000 7 hari 420,000 Pekerja
16 Sapek 60,000 7 hari 420,000 Pekerja
JUMLAH 8,155,000
Sampang, 02 Januari 2017
MINGGU KE : V (Lima)
NO NAMA UPAH/hr VOLUME JUMLAH KET.
1 Mawardi 100,000 7 hari 700,000 Mandor 35
2 Mat Rawi 85,000 7 hari 595,000 Kep. Tukang 35
3 Suja'i 80,000 7 hari 560,000 Operator sopir 35
4 Marsuki 60,000 7 hari 420,000 Pembantu sopir 35
5 Mattingwar 80,000 6 hari 480,000 Tukang batu 34
6 Hamdani 80,000 6 hari 480,000 Tukang batu 34
7 Sujali 80,000 6 hari 480,000 Tukang batu 34
8 Arofek 80,000 6 hari 480,000 Tukang batu 34
9 Syamsul 80,000 6 hari 480,000 Tukang batu 34
10 Baydewi 80,000 6 hari 480,000 Tukang batu 34
11 Arifin 60,000 5 hari 300,000 Pekerja 33
12 Dulhamit 60,000 5 hari 300,000 Pekerja 33
13 Badrus 60,000 7 hari 420,000 Pekerja 35
14 Halimi 60,000 7 hari 420,000 Pekerja 35
15 Kader 60,000 7 hari 420,000 Pekerja 35
16 Sapek 60,000 7 hari 420,000 Pekerja 33
JUMLAH 7,435,000
Sampang, 16 Januari 2017
39,935,000
REKAP ONGKOS TUKANG MINGGUAN
MINGGU KE : V1 (Empat)
NO NAMA UPAH/hr VOLUME JUMLAH KET.
1 Syamsul 100,000 7 hari 700,000 Mandor
2 Baydewi 85,000 7 hari 595,000 Kep. Tukang
3 Suja'i 80,000 6 hari 480,000 Operator sopir
4 Marsuki 60,000 6 hari 360,000 Pembantu sopir
5 Mattingwar 80,000 7 hari 560,000 Tukang batu
6 Hamdani 80,000 7 hari 560,000 Tukang batu
7 Sujali 80,000 7 hari 560,000 Tukang batu
8 Arofek 80,000 7 hari 560,000 Tukang batu
9 Syamsul 80,000 6 hari 480,000 Tukang batu
10 Baydewi 80,000 6 hari 480,000 Tukang batu
11 Arifin 60,000 7 hari 420,000 Pekerja
12 Dulhamit 60,000 7 hari 420,000 Pekerja
13 Badrus 60,000 7 hari 420,000 Pekerja
14 Halimi 60,000 7 hari 420,000 Pekerja
15 Kader 60,000 7 hari 420,000 Pekerja
16 Sapek 60,000 6 hari 360,000 Pekerja
JUMLAH 7,795,000