HARGA SATUAN POKOK KEGIATAN

PEMERINTAH KABUPATEN SAMPANG


TAHUN 2016
65
NO. URAIAN KEGIATAN Koef. SATUAN HARGA SATUAN HARGA

Perkerasan Jalan raya


1 m' Pasangan Batu Tepi
Bahan
Batu Gunung 15 /20 0.03 m3 178,150.00 5,344.50
Jumlah: 5,344.50
Upah
Mandor 0.00 Oh 100,000.00 300.00
Pekerja Terampil 0.75 Oh 70,000.00 52,500.00
Pekerja Terampil 1.50 Oh 70,000.00 105,000.00
Mandor 0.08 Oh 100,000.00 7,500.00
Jumlah: 165,300.00
Upah/m' = 1/30 x Upah 0.03 165,300.00 5,510.00
Harga /m' 10,854.50
1 m³ Pekerjaan Konstruksi Lapis
Pondasi Bawah (LPB) Telford Analisa K - 516
Menggunakan Buruh
Tenaga:
Mandor 1.0000 O.H 100,000.00 100,000.00
Operator Terampil 1.0000 O.H 85,000.00 85,000.00
Pekerja / Buruh Tak Terampil 48.0000 O.H 65,000.00 3,120,000.00
Jumlah: 3,305,000.00
Bahan:
Batu Pecah 10-15 cm 180.0000 m3 141,600.00 25,488,000.00
Batu Pecah 5-7 cm 40.0000 m3 168,100.00 6,724,000.00
Sirtu 70.0000 m3 70,000.00 4,900,000.00
Jumlah: 37,112,000.00
Peralatan:
Sewa alat bantu 6.0000 Set 183,300.00 1,099,800.00
Mesin Gilas 3 Roda 8-10 T 5.0000 Jam 166,000.00 830,000.00
Jumlah: 1,929,800.00
Nilai HSPK : 42,346,800.00
Nilai HSPK per m3: 282,312.00
1 m³ Pekerjaan Konstruksi Lapis Analisa K - 523 (revisi)
Pondasi Atas (LPA) Kelas B
Menggunakan Buruh
Tenaga:
Mandor 2.0000 O.H 81,000.00 162,000.00
Operator Terampil 1.0000 O.H 62,700.00 62,700.00
Pembantu Operator 1.0000 O.H 50,160.00 50,160.00
Sopir Terampil 1.0000 O.H 62,700.00 62,700.00
Pembantu Sopir 1.0000 O.H 50,160.00 50,160.00
Pekerja / Buruh Tak Terampil 60.0000 O.H 37,620.00 2,257,200.00
Jumlah: 2,644,920.00
Bahan:
Batu Pecah 5-7 cm 18.0000 m3 168,100.00 3,025,800.00
Batu Pecah 3-5 cm 17.0000 m3 224,300.00 3,813,100.00
Batu Pecah 2-3 cm 2.5000 m3 250,700.00 626,750.00
Batu Pecah 0,5-1 cm 6.5000 m3 295,400.00 1,920,100.00
Sirtu 31.0000 m3 70,000.00 2,170,000.00
Jumlah: 11,555,750.00
Peralatan:
Sewa alat bantu 2.4000 Set 183,300.00 439,920.00
Mesin Gilas 3 Roda 6-8 T 5.0000 Jam 254,400.00 1,272,000.00
Truck Tangki air 115 HP 5.0000 Jam 149,040.00 745,200.00
Jumlah: 2,457,120.00
Nilai HSPK : 16,657,790.00
Nilai HSPK per m3: 277,629.83
1 m² Pekerjaan Lapisan Penetrasi
Makadam 5 cm (LAPEN)
Tenaga:
Mandor 6.0000 O.H 81,000.00 486,000.00
Operator Terampil 6.0000 O.H 62,700.00 376,200.00
Pembantu Operator 6.0000 O.H 50,160.00 300,960.00
Sopir Terampil 3.0000 O.H 62,700.00 188,100.00
Pembantu Sopir 3.0000 O.H 50,160.00 150,480.00
Pekerja / Buruh Tak Terampil 198.0000 O.H 37,620.00 7,448,760.00
Pekerja / Buruh Terampil 6.0000 O.H 58,000.00 348,000.00
Jumlah: 9,298,500.00
Bahan:
Batu Pecah 3-5 cm 56.0000 m3 224,300.00 12,560,800.00
Batu Pecah 2-3 cm 31.1100 m3 250,700.00 7,799,277.00
Batu Pecah 1-2 cm 15.5500 m3 281,050.00 4,370,327.50
Pasir Ayak untuk Beton 3.5000 m3 327,750.00 1,147,125.00
Aspal Drum AC. 60/70 6,270.00 Kg 13,200.00 82,764,000.00
minyak tanah 450.0000 Ltr 15,700.00 7,065,000.00
Jumlah: 115,706,529.50
Peralatan:
Sewa alat bantu 8.1600 Set 183,300.00 1,495,728.00
Mesin Gilas 3 Roda 6-8 T 15.0000 Jam 254,400.00 3,816,000.00
Jumlah: 5,311,728.00
Nilai HSPK : 130,316,757.50
Nilai HSPK per m2: 93,083.40
1 m² Pekerjaan Pemasangan Batu SNI 6897 : 2008
Merah tebal 1/2 bata (1 Pc : 3 Ps)
Tenaga:
Mandor 0.0150 O.H 81,000.00 Rp 1,215.00
Kepala Tukang Batu 0.0100 O.H 70,000.00 Rp 700.00
Tukang Batu 0.1000 O.H 37,620.00 Rp 3,762.00
Pekerja/Buruh Tak Terampil 0.3000 O.H 37,620.00 Rp 11,286.00
Jumlah: Rp 16,963.00
Bahan:
Semen Portland 14.3700 kg 1,782.50 Rp 25,614.53
Pasir Pasang 0.0400 m3 263,900.00 Rp 10,556.00
Bata Merah uk.5 x 11 x 22 70.0000 buah #REF! #REF!
Jumlah: #REF!
Nilai HSPK : #REF!
1 m² Pekerjaan Pemasangan Batu SNI 6897 : 2008
Merah tebal 1/2 bata (1 Pc : 4 Ps)
Tenaga:
Mandor 0.0150 O.H 81,000.00 Rp 1,215.00
Kepala Tukang Batu 0.0100 O.H 70,000.00 Rp 700.00
Tukang Batu 0.1000 O.H 37,620.00 Rp 3,762.00
Pekerja/Buruh Tak Terampil 0.3000 O.H 37,620.00 Rp 11,286.00
Jumlah: Rp 16,963.00
Bahan:
Semen Portland 11.5000 kg 1,782.50 Rp 20,498.75
Pasir Pasang 0.0430 m3 263,900.00 Rp 11,347.70
Bata Merah uk.5 x 11 x 22 70.0000 buah #REF! #REF!
Jumlah: #REF!
Nilai HSPK : #REF!
1 m² Pekerjaan Pemasangan Batu SNI 6897 : 2008
Merah Putih 1/2 bata (1 Pc : 6 Ps)
Tenaga:
Mandor 0.0150 O.H 81,000.00 1,215.00
Kepala Tukang Batu 0.0100 O.H 70,000.00 700.00
Tukang Batu 0.1000 O.H 37,620.00 3,762.00
Pekerja/Buruh Tak Terampil 0.3000 O.H 37,620.00 11,286.00
Jumlah: 16,963.00
Bahan:
Semen Portland 8.3200 kg 1,782.50 14,830.40
Pasir Pasang 0.0490 m3 263,900.00 12,931.10
Bata Putih Lokal 70.0000 buah #REF! #REF!
Jumlah: #REF!
Nilai HSPK : #REF!
1 m² Pekerjaan Pemasangan Bata SNI 6897 : 2008
Putih tebal 1/2 bata (1 Pc : 4 Ps)
Tenaga:
Mandor 0.0150 O.H 81,000.00 Rp 1,215.00
Kepala Tukang Batu 0.0100 O.H 70,000.00 Rp 700.00
Tukang Batu 0.1000 O.H 37,620.00 Rp 3,762.00
Pekerja/Buruh Tak Terampil 0.3000 O.H 37,620.00 Rp 11,286.00
Jumlah: Rp 16,963.00
Bahan:
Semen Portland 11.5000 kg 1,782.50 Rp 20,498.75
Pasir Jawa 0.0430 m3 263,900.00 Rp 11,347.70
Bata Putih Lokal 45.0000 buah #REF! #REF!
Jumlah: #REF!
Nilai HSPK : #REF!
1 m² Pekerjaan Pemasangan Bata SNI 6897 : 2008
Putih tebal 1/2 bata (1 Pc : 8 Ps)
Tenaga:
Mandor 0.0150 O.H 81,000.00 Rp 1,215.00
Kepala Tukang Batu 0.0100 O.H 70,000.00 Rp 700.00
Tukang Batu 0.1000 O.H 37,620.00 Rp 3,762.00
Pekerja/Buruh Tak Terampil 0.3000 O.H 37,620.00 Rp 11,286.00
Jumlah: Rp 16,963.00
Bahan:
Semen Portland 6.5000 kg 1,782.50 Rp 11,586.25
Pasir Jawa 0.0500 m3 263,900.00 Rp 13,195.00
Bata Putih Lokal 45.0000 buah #REF! #REF!
Jumlah: #REF!
Nilai HSPK : #REF!
1 m³ Pekerjaan Beton K-175 SNI 7394 : 2008
Tenaga:
Mandor 0.0830 O.H 81,000.00 Rp 6,723.00
Kepala Tukang Batu 0.0280 O.H 70,000.00 Rp 1,960.00
Tukang Batu 0.2750 O.H 37,620.00 Rp 10,345.50
Pekerja/Buruh Tak Terampil 1.6500 O.H 37,620.00 Rp 62,073.00
Jumlah: Rp 81,101.50

Bahan:
Semen Portland 326.0000 kg 1,782.50 Rp 581,095.00
Pasir Beton 0.5428 m3 327,750.00 Rp 177,902.70
Kerikil (maksimum 30mm) 0.7622 m3 70,000.00 Rp 53,355.55
Air 215.0000 Liter #REF! #REF!
Jumlah: #REF!
Nilai HSPK : #REF!
1 m³ Pekerjaan Beton K-125 SNI 7394 : 2008
Tenaga:
Mandor 0.0830 O.H 81,000.00 Rp 6,723.00
Kepala Tukang Batu 0.0280 O.H 70,000.00 Rp 1,960.00
Tukang Batu 0.2750 O.H 37,620.00 Rp 10,345.50
Pekerja/Buruh Tak Terampil 1.6500 O.H 37,620.00 Rp 62,073.00
Jumlah: Rp 81,101.50
Bahan:
Semen Portland 276.0000 kg 1,782.50 Rp 491,970.00
Pasir Beton 0.5914 m3 327,750.00 Rp 193,831.35
Kerikil (maksimum 30mm) 0.7496 m3 70,000.00 Rp 52,472.00
Air 215.0000 Liter #REF! #REF!
Jumlah: #REF!
Nilai HSPK : #REF!
1 m² Pemasangan Paving Stone
(Blok) Tbl.8 cm abu-abu Segi enam
Tenaga:
Mandor 0.0250 O.H 81,000.00 2,025.00
Kepala Tukang Batu 0.0250 O.H 70,000.00 1,750.00
Tukang Batu 0.2500 O.H 37,620.00 9,405.00
Pekerja/Buruh Tak Terampil 0.5000 O.H 37,620.00 18,810.00
Jumlah: 31,990.00
Bahan:
Paving Stone Tb 8 cm Segi Enam Abu-abu 33.0000 buah #REF! #REF!
Jumlah: #REF!
Nilai HSPK : #REF!
1 m² Pemasangan Paving Stone
(Blok) Tbl.6 cm abu-abu Segi enam
Tenaga:
Mandor 0.0250 O.H 81,000.00 2,025.00
Kepala Tukang Batu 0.0250 O.H 70,000.00 1,750.00
Tukang Batu 0.2500 O.H 37,620.00 9,405.00
Pekerja/Buruh Tak Terampil 0.5000 O.H 37,620.00 18,810.00
Jumlah: 31,990.00
Bahan:
Paving Stone Abu-2 Tb 6 cm Segi Enam Abu-abu 33.0000 buah #REF! #REF!
Jumlah: #REF!
Nilai HSPK : #REF!
1 m² Pemasangan Paving Stone
(Blok) Tbl.8 cm Abu-2 Persegi Panjang

Tenaga:
Mandor 0.0250 kg 81,000.00 2,025.00
Kepala Tukang Batu 0.0250 O.H 70,000.00 1,750.00
Tukang Batu 0.2500 O.H 37,620.00 9,405.00
Pekerja/Buruh Tak Terampil 0.7500 O.H 37,620.00 28,215.00
Jumlah: 41,395.00
Bahan:
Paving Stone Abu-2 Tb 8 cm Persegi Panjang 43.0000 buah #REF! #REF!
Jumlah: #REF!
Nilai HSPK : #REF!
1 m² Pemasangan Paving Stone
(Blok) Tbl.6 cm Abu-2 Persegi Panjang

Tenaga:
Mandor 0.0250 O.H 81,000.00 2,025.00
Kepala Tukang Batu 0.0250 O.H 70,000.00 1,750.00
Tukang Batu 0.2500 O.H 37,620.00 9,405.00
Pekerja/Buruh Tak Terampil 0.5000 O.H 37,620.00 18,810.00
Jumlah: 31,990.00
Bahan:
Paving Stone Abu-2 Tb 6 cm Persegi Panjang 50.0000 buah #REF! #REF!
Jumlah: #REF!
Nilai HSPK : #REF!
1 m² Pekerjaan Plesteran
1 Pc : 4 Ps tebal 15 mm SNI 2837 : 2008
Tenaga:
Mandor 0.0150 O.H 81,000.00 1,215.00
Kepala Tukang Batu 0.0150 O.H 75,000.00 1,125.00
Tukang Batu 0.1500 O.H 70,000.00 10,500.00
Pekerja/Buruh Tak Terampil 0.3000 O.H 37,620.00 11,286.00
Jumlah: 24,126.00
Bahan:
Semen Portland 6.2400 kg 1,782.50 11,122.80
Pasir Pasang 0.0240 m3 263,900.00 6,333.60
Jumlah: 17,456.40
Nilai HSPK : 41,582.40
1 m³ Pekerjaan Galian tanah biasa SNI 2835 : 2008
sedalam 1 meter
Tenaga:
Mandor 0.0250 O.H 81,000.00 2,025.00
Pekerja/Buruh Tak Terampil 0.7500 O.H 37,620.00 28,215.00
Jumlah: 30,240.00
Nilai HSPK : 30,240.00
1 m² Pekerjaan Pembersihan Lapangan SNI 03-2835-2002 Analisa Biaya
dan Perataan Konstruksi Bangunan Gedung dan
Perumahan Pek. Persiapan (6.8)

Tenaga:
Mandor 0.0500 O.H 81,000.00 4,050.00
Pekerja/Buruh Tak Terampil 0.1000 O.H 37,620.00 3,762.00
Jumlah: Rp 7,812.00
Nilai HSPK : Rp 7,812.00

1 m³ Pekerjaan Pengurugan Pasir Urug SNI 2835 : 2008


Tenaga:
Mandor 0.0100 O.H 81,000.00 810.00
Pekerja Terampil 0.3000 O.H 37,620.00 11,286.00
Jumlah: 12,096.00
Bahan:
Pasir Urug Lokal 1.2000 m3 #REF! #REF!
Jumlah: #REF!
Nilai HSPK : #REF!
1 m³ Pekerjaan Pasangan Pondasi SNI 2836 : 2008
Batu Gunung Belah 15/20 cm,
(1 Pc : 4 PP)
Tenaga:
Mandor 0.0750 O.H 81,000.00 6,075.00
Kepala Tukang Batu 0.0750 O.H 75,000.00 5,625.00
Tukang Batu 0.7500 O.H 70,000.00 52,500.00
Pekerja/Buruh Tak Terampil 1.5000 O.H 37,620.00 56,430.00
Jumlah: 120,630.00
Bahan:
Semen Portland 163.0000 kg 1,782.50 290,547.50
Pasir Hitam/Pasir Jawa 0.5200 m3 395,800.00 205,816.00
Batu Gunung Pecah 15/20 cm 1.1000 m3 178,150.00 195,965.00
Jumlah: 692,328.50
Nilai HSPK : 812,958.50
1 m³ Pengurugan Sirtu Padat SNI 2835 : 2008
Tenaga:
Mandor 0.0250 O.H 100,000.00 2,500.00
Pekerja / Buruh Tak Terampil 0.2500 O.H 65,000.00 16,250.00
Jumlah: 18,750.00
Bahan:
Sirtu 1.2000 m3 70,000.00 84,000.00
Jumlah: 84,000.00
Nilai HSPK : 102,750.00
A B C D E F G H I J K L M N
1
2
KELOMPOK MASYARAKAT (POKMAS)
3 “KUASA BAROKAH”
4 DESA PATAPAN KECAMATAN TORJUN KABUPATEN SAMPANG
5
6 Back up volume
7 Nama Kegiatan : PEMBANGUNAN JALAN MAKADAM
8 Lokasi : DESA PATAPAN KECAMATAN TORJUN KABUPATEN SAMPANG
9 Tahun Anggaran : 2016
10
11 DIMENSI
RUSAK VOLUME /
12 NO. URAIAN PEKERJAAN Panjang Lebar Tinggi KOEF. LUAS JUMLAH SAT.
% %
13 (m¹) (m¹) (m¹)
14
15 I PEKERJAAN PENDAHULUAN
16 1 Pembersihan semak 350.00 1.00 1.00 K - 422 350.00 350.00 m2
17
18 II PEKERJAAN KONSTRUKSI JALAN
19 a STA 0+000 s/d STA 1+000
20 1 Pek. Batu Tepi 700.00 2.00 K - 516 1,400.00 m'
21
22 2 Pek. Telford 700.00 2.50 0.15 K - 618 262.50 262.50 m2
23
24 3 Pek. Urugan Sirtu 700.00 2.50 0.05 K - 618 87.50 87.50 m2
25
26 b STA 0+000 s/d STA 0+100
27 1 Pek. Batu Tepi #NAME? 2.00 K - 516 #NAME? m'
28
29 2 Pek. Telford #NAME? 2.50 0.15 K - 618 #NAME? #NAME? m2
30

31 3 Pek. Urugan Sirtu #NAME? 2.50 0.05 K - 618 #NAME? #NAME? m2


32
33
34
35
RENCANA ANGGARAN BIAYA
(RAB)

KEGIATAN : PEMBANGUNAN TEMPAT MANDI, CUCI DAN KAKUS ( MCK )

LOKASI : MASJID DARUL ISLAM

ALAMAT : DESA RABASAN KECAMATAN CAMPLONG KABUPATEN SAMPANG

HARGA (Rp)
NO URAIAN PEKERJAAN VOLUME
SATUAN JUMLAH
1 2 3 4 5
I PEKERJAAN PERSIAPAN
2 Pembersihan Lokasi 24.00 M2 25,000.00 600,000.00
1 Pek. Bowplank dan Pengukuran 20.00 M 50,000.00 1,000,000.00
Jumlah : Sub Total : 1,600,000.00
II PEKERJAAN TANAH DAN URUGAN
1 Galian Tanah Pondasi 8.00 M3 55,000.00 440,000.00
2 Urugan Pasir Bawah Pondasi 2.00 M3 175,000.00 350,000.00
3 Urugan Pasir Bawah Lantai 1.00 M3 175,000.00 175,000.00
4 Urugan Tanah Kembali 2.00 M3 20,000.00 40,000.00
Sub Total : 1,005,000.00
III PEKERJAAN PASANGAN
1 Pas. Pondasi Batu Kali 1:8 11.00 M3 612,784.00 6,740,624.00
2 Pas. Bt Merah 1:4 6.00 M3 87,798.00 526,788.00
Sub Total 7,267,412.00
IV PEKERJAAN BETON
1 Pas Beton Sloof 15/15 1.00 M¹ 7,467,312.00 7,467,312.00
2 Pas Beton Kolom 15/15 1.00 M³ 7,467,312.00 7,467,312.00
3 Pas Ring Balk 15/15 1.00 M¹ 7,467,312.00 7,467,312.00
4 Rabat Beton t = 7 Cm 1.00 M³ 557,951.00 557,951.00
Sub Total 22,959,887.00
V PLESTERAN DINDING
1 Plesretan dinding 1:4 90.03 M2 30,032.00 2,703,780.96
Sub Total 2,703,780.96
VI PEKERJAAN PINTU DAN ROSTER
1 Pas Pintu PVC 2.00 bhn 400,000.00 800,000.00
2 Pas Roster 1.00 M2 32,035.00 32,035.00
Sub Total 832,035.00
VII PEKERJAAN KERAMIK
1 Pas Keramik Lantai 20/20 18.00 M2 485,187.00 8,733,366.00
2 Pas Keramik Dinding 20/25 32.00 M2 415,710.00 13,302,720.00
Sub Total 22,036,086.00
VIII PEKERJAAN RANGKA ATAP
1 Pas Gording Kayu Kruing 6/12 1.00 M3 6,419,560.00 6,419,560.00
2 Pas Usuk Kayu Meranti 4/6 1.00 M3 57,000.00 57,000.00
3 Pas Lisplank 3/30 Kayu Meranti 1.00 M3 300,000.00 300,000.00
4 Pas Konsol Kayu Kruing 1.00 M3 6,419,560.00 6,419,560.00
5 Pas Penampung Air 1.00 M3 3,400,000.00 3,400,000.00
Sub Total 16,596,120.00
Total : 75,000,320.96

Dibulatkan : 75,000,000.00
Sampang, 29 Maret 2021

Ketua Takmir Masjid

SARBAN
HARGA SATUAN POKOK KEGIATAN
PEMERINTAH KABUPATEN SAMPANG
TAHUN 2016
65
NO. URAIAN KEGIATAN Koef. SATUAN HARGA SATUAN HARGA

Perkerasan Jalan raya


1 m' Pasangan Batu Tepi
Bahan
Batu Gunung 15 /20 0.03 m3 211,350.00 6,340.50
Jumlah: 6,340.50
Upah
Mandor 0.00 Oh 95,000.00 285.00
Pekerja Terampil 0.75 Oh 88,500.00 66,375.00
Pekerja Terampil 1.50 Oh 88,500.00 132,750.00
Mandor 0.08 Oh 95,000.00 7,125.00
Jumlah: 206,535.00
Upah/m' = 1/30 x Upah 0.03 206,535.00 6,884.50
Harga /m' 13,225.00
1 m³ Pekerjaan Konstruksi Lapis
Pondasi Bawah (LPB) Telford Analisa K - 516
Menggunakan Buruh
Tenaga:
Mandor 1.0000 O.H 95,000.00 95,000.00
Operator Terampil 1.0000 O.H 88,500.00 88,500.00
Pekerja / Buruh Tak Terampil 48.0000 O.H 76,500.00 3,672,000.00
Jumlah: 3,855,500.00
Bahan:
Batu Gunung 10-15 cm 180.0000 m3 211,350.00 38,043,000.00
Batu Pecah 5-7 cm 40.0000 m3 224,150.00 8,966,000.00
Sirtu 70.0000 m3 140,900.00 9,863,000.00
Jumlah: 56,872,000.00
Peralatan:
Sewa alat bantu 6.0000 Set 183,300.00 1,099,800.00
Mesin Gilas 3 Roda 8-10 T 5.0000 Jam 254,400.00 1,272,000.00
Jumlah: 2,371,800.00
Nilai HSPK : 63,099,300.00
Nilai HSPK per m3: 420,662.00
1 m³ Pengurugan Sirtu Padat SNI 2835 : 2008
Tenaga:
Mandor 0.0250 O.H 95,000.00 2,375.00
Pekerja / Buruh Tak Terampil 0.2500 O.H 76,500.00 19,125.00
Jumlah: 21,500.00
Bahan:
Sirtu 1.2000 m3 140,900.00 169,080.00
Jumlah: 169,080.00
Nilai HSPK : 190,580.00
1 m² Pekerjaan Plesteran
1 Pc : 4 Ps tebal 15 mm SNI 2837 : 2008
Tenaga:
Mandor 0.0150 O.H 95,000.00 1,425.00
Kepala Tukang Batu 0.0150 O.H 88,500.00 1,327.50
Tukang Batu 0.1500 O.H 82,500.00 12,375.00
Pekerja/Buruh Tak Terampil 0.3000 O.H 76,500.00 22,950.00
Jumlah: 38,077.50
Bahan:
Semen Portland 6.2400 kg 1,890.00 11,793.60
Pasir Pasang 0.0240 m3 15,700.00 376.80
Jumlah: 12,170.40
Nilai HSPK : 50,247.90
1 m³ Pekerjaan Galian tanah biasa SNI 2835 : 2008
sedalam 1 meter
Tenaga:
Mandor 0.0250 O.H 95,000.00 2,375.00
Pekerja/Buruh Tak Terampil 0.7500 O.H 76,500.00 57,375.00
Jumlah: 59,750.00
Nilai HSPK : 59,750.00
1 m³ Pekerjaan Pasangan Pondasi SNI 2836 : 2008
Batu Gunung Belah 15/20 cm,
(1 Pc : 4 PP)
Tenaga:
Mandor 0.0750 O.H 95,000.00 7,125.00
Kepala Tukang Batu 0.0750 O.H 88,500.00 6,637.50
Tukang Batu 0.7500 O.H 82,500.00 61,875.00
Pekerja/Buruh Tak Terampil 1.5000 O.H 76,500.00 114,750.00
Jumlah: 190,387.50
Bahan:
Semen Portland 163.0000 kg 1,890.00 308,070.00
Pasir Hitam/Pasir Jawa 0.5200 m3 345,800.00 179,816.00
Batu Gunung Pecah 15/20 cm 1.1000 m3 211,350.00 232,485.00
Jumlah: 720,371.00
Nilai HSPK : 910,758.50
1 m² Pekerjaan Plesteran
1 Pc : 4 Ps tebal 15 mm SNI 2837 : 2008
Tenaga:
Mandor 0.0150 O.H 95,000.00 1,425.00
Kepala Tukang Batu 0.0150 O.H 88,500.00 1,327.50
Tukang Batu 0.1500 O.H 82,500.00 12,375.00
Pekerja/Buruh Tak Terampil 0.3000 O.H 76,500.00 22,950.00
Jumlah: 38,077.50
Bahan:
Semen Portland 6.2400 kg 1,890.00 11,793.60
Pasir Pasang 0.0240 m3 345,800.00 8,299.20
Jumlah: 20,092.80
Nilai HSPK : 58,170.30
1 m³ Membuat Lantai Beton Bertulang (150 Kg Besi + Bekisting) SNI 7394 : 2008

Tenaga:
Mandor 0.2830 O.H 95,000.00 26,885.00
Kepala Tukang Batu 0.3230 O.H 88,500.00 28,585.50
Tukang Besi 1.4000 O.H 82,500.00 115,500.00
Tukang Kayu 1.5600 O.H 82,500.00 128,700.00
Tukang Batu 0.2750 O.H 82,500.00 22,687.50
Pekerja / Buruh Tak Terampil 5.6500 O.H 76,500.00 432,225.00
Jumlah: 754,583.00

Bahan:
Kayu meranti 0.2700 m3 102,500.00 27,675.00
Paku 5cm-12cm 2.0000 Kg 18,950.00 37,900.00
Minyak Bekesting (solar) 0.6000 Ltr 7,500.00 4,500.00
Besi Beton Polos 210.0000 Kg 123,450.00 25,924,500.00
Kawat Beton 3.0000 Kg 19,800.00 59,400.00
Semen Portland 336.0000 kg 1,890.00 635,040.00
Pasir Beton 0.5400 m3 345,800.00 186,732.00
Kerikil 0.8100 m3 333,000.00 269,730.00
Jumlah: 27,145,477.00
Nilai HSPK : 27,900,060.00
HARGA SATUAN POKOK KEGIATAN
PEMERINTAH KABUPATEN SAMPANG
TAHUN 2016

NO NAMA BARANG/MERK/UKURAN SATUAN HARGA SATUAN

1 Mandor O.H 95,000.00


2 Pekerja Terampil O.H 88,500.00
3 Operator Terampil O.H 88,500.00
4 Pekerja / Buruh Tak Terampil O.H 76,500.00
5 Batu Gunung 15 /20 m3 211,350.00
6 Batu Gunung 10-15 cm m3 211,350.00
7 Batu Pecah 5-7 cm m3 224,150.00
8 Sirtu m3 140,900.00

Sampang, 2017
Kelompok Masyarakat Pokmas
"HARAPAN KITA "
Ketua

SAHIDI
#NAME?
KELOMPOK MASYARAKAT (POKMAS)
#NAME?
“KENARI”
#NAME?
DESA RAGUNG KECAMATAN PENGARENGAN KABUPATEN SAMPANG

JADWAL RENCANA PELAKSANAAN PEKERJAAN

KEGIATAN : PEMBANGUNAN TEMPAT MANDI, CUCI DAN KAKUS ( MCK )


LOKASI : MASJID DARUL ISLAM
VOLUME #NAME?
TAHUN ANGGARAN #NAME?

Masa Pelaksanaan (60 Hari) Kalender


NO URAIAN PEKERJAAN Bobot Skala
H1 H2 H3 H4 H5 H6 H7 H8

A PEKERJAAN PERSIAPAN #REF! #REF! 100

BI #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? 50

B II #NAME? #NAME? #NAME? #NAME? #NAME? 50

Jumlah Rencana #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Rencana Komulatif #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Realisasi
Deviasi

Sampang, 2017

0
0.00

0
PANITIA RENOVASI MUSHOLLA MIFTAHUL FALAH
Sekertariat : Dusun Ragung Utara Desa Ragung
Kec. Pangarengan Kab. Sampang
HP 087849818588

KEGIATAN : PEMBANGUNAN TEMPAT MANDI, CUCI DAN KAKUS ( MCK )


LOKASI : MASJID DARUL ISLAM

NO URAIAN PEKERJAAN JUMLAH BIAYA


I PEKERJAAN PERSIAPAN 1,600,000.00
II PEKERJAAN PEMASANGAN DINDING 1,005,000.00
III PEKERJAAN ATAP 24,650,000.00
IV PEKERJAAN LANTAI 8,800,000.00
V PEKERJAAN PINTU DAN JENDELA 8,920,000.00
VI PENGECETAN 6,925,000.00
VII PENGUPAHAN 17,850,000.00
Total : 69,750,000.00

KETUA PANITIA

MOH. ARIF

0
HARGA JUMLAH
NO URAIAN BAHAN VOLUME SAT.
SATUAN HARGA
1 Batu pecah 5/7 358 M3 135,000 48,330,000
2 Batu Pecah 10/15 297 M3 110,000 32,670,000
3 Batu Pecah 15/20 165 M 3
125,000 20,625,000
4 Sewa walles 25 Hr 500,000 12,500,000
5 Mobilisasi walles 1 Ls 1,500,000 1,500,000
6 Sirtu 481 M3 70,000 33,649,000
7 Benang nilon 18 Rol 10,000 176,000
8 Gerobak dorong / Argo 7 Bh 450,000 3,150,000
9 Skrup 8 Bh 65,000 520,000
10 Prasasti 1 Ls 750,000 750,000
11 Ongkos Tukang 1 Ls 46,130,000 46,130,000
JUMLAH 200,000,000
0

Batu pecah 5/7 358 358 0 394.7


Batu Pecah 10/15 297 297 0 327.5
Batu Pecah 15/20 165 165 0 181.9
Sewa walles 25 25 0 27.6
Mobilisasi walles 1 1 0 1.1
Sirtu 481 481 0 530.0
Benang nilon 18 18 0 19.4
Gerobak dorong / Argo 7 7 0 7.7
Skrup 8 8 0 8.8
Prasasti 1 1 0 1.1
Ongkos Tukang 1 1 0 1.1
Batu pecah 5/7 koef vol M3 hspk
Telford 0 0 0 0.00

Batu pecah 10/15 koef vol M3 hspk


Telford 0 0 0 0.00

Batu pecah 15/20 koef vol M3


Batu tepi - 0 0.00

Sirtu koef vol M3 hspk


Urugan sirtu 0 1,208 0
Urugan berem 0 227 0
Telford 180 0 0 0
0.00
NO TANGGAL URAIAN BAHAN VOLUME

179.00 1 19 Desember 2016 Benang nilon 18 Rol


42.43 Gerobak dorong / Argo 7 Bh
55.00 Skrup 8 Bh
Jumlah :
2 20 Desember 2016 Sirtu 80 M 3

80.12 Batu Pecah 15/20 55 M3


Batu Pecah 10/15 42 M3
Jumlah :
3 28 Desember 2016 Sirtu 80 M 3

Batu Pecah 10/15 42 M3


Jumlah :
4 2 Januari 2017 Sirtu 80 M 3

Batu Pecah 15/20 55 M3


Batu Pecah 10/15 42 M3
Jumlah :
5 6 Januari 2017 Sirtu 80 M 3

Batu Pecah 10/15 42 M3


Jumlah :
6 10 Januari 2017 Sirtu 80 M3
Batu Pecah 5/7 179 M3
Batu Pecah 10/15 42 M3
Jumlah :
7 16 Januari 2017 Batu Pecah 5/7 179 M3
Batu Pecah 10/15 42 M3
Jumlah :
8 20 Januari 2017 Batu Pecah 15/20 55 M 3

Batu Pecah 10/15 42 M3


Sirtu 80 M3
Jumlah :
9 30 Desember 2016 Sewa walles 25 Hr
Mobilisasi walles 1 Ls
Jumlah :
10 20 Januari 2017 Prasasti 1 Ls
Jumlah :
11 23 Januari 2017 Ongkos Tukang 1 Ls
Jumlah :
JUMLAH TOTAL :

NO TANGGAL URAIAN BAHAN VOLUME


9 30-Jan-16 Sewa walles 25 Hr
Mobilisasi walles 1 Ls
Jumlah :
10 2-Feb-2016 Prasasti 1 Ls
Jumlah :
11 5-Feb-2016 Ongkos Tukang 1 Ls
Jumlah :
JUMLAH TOTAL :
HARGA JUMLAH

10,000 176,000
450,000 3,150,000
65,000 520,000
Jumlah : 3,846,000 AINUL YAQIN
70,000 5,608,167
125,000 6,875,000
110,000 4,667,143
Jumlah : 17,150,310 MIRUDDIN
70,000 5,608,167
110,000 4,667,143
Jumlah : 10,275,310 MIRUDDIN 3000
70,000 5,608,167 2500
125,000 6,875,000 2000
110,000 4,667,143
Jumlah : 17,150,310 MIRUDDIN
70,000 5,608,167
110,000 4,667,143
Jumlah : 10,275,310 MIRUDDIN
70,000 5,608,167
135,000 24,165,000
110,000 4,667,143
Jumlah : 34,440,310 MIRUDDIN
135,000 24,165,000
110,000 4,667,143
Jumlah : 28,832,143 MIRUDDIN
125,000 6,875,000
110,000 4,667,143
70,000 5,608,167
Jumlah : 17,150,310 MIRUDDIN
500,000 12,500,000
1,500,000 1,500,000
Jumlah : 14,000,000 IDRIS EFENDI
750,000 750,000
Jumlah : 750,000 HERIYANTO
46,130,000 46,130,000
Jumlah : 46,130,000 MAWARDI
JUMLAH TOTAL : 200,000,000

HARGA JUMLAH
500,000 12,500,000
1,500,000 1,500,000
Jumlah : 14,000,000
750,000 750,000
Jumlah : 750,000
46,130,000 46,130,000
Jumlah : 46,130,000
JUMLAH TOTAL : 200,000,000
NO NAMA UPAH/hr VOLUME JUMLAH KET. Ttd.
1 Mawardi 100,000 42 hari 4,200,000 Mandor
2 Mat Rawi 85,000 42 hari 3,570,000 Kep. Tukang
3 Suja'i 80,000 41 hari 3,280,000 Operator sopir
4 Marsuki 60,000 41 hari 2,460,000 Pembantu sopir
5 Mattingwar 80,000 41 hari 3,280,000 Tukang batu
6 Hamdani 80,000 41 hari 3,280,000 Tukang batu
7 Sujali 80,000 41 hari 3,280,000 Tukang batu
8 Arofek 80,000 41 hari 3,280,000 Tukang batu
9 Syamsul 60,000 40 hari 2,400,000 Pekerja
10 Baydewi 60,000 40 hari 2,400,000 Pekerja
11 Arifin 60,000 40 hari 2,400,000 Pekerja
12 Dulhamit 60,000 40 hari 2,400,000 Pekerja
13 Badrus 60,000 42 hari 2,520,000 Pekerja
14 Halimi 60,000 42 hari 2,520,000 Pekerja
15 Kader 60,000 42 hari 2,520,000 Pekerja
16 Sapek 60,000 39 hari 2,340,000 Pekerja
JUMLAH 46,130,000
Sampang, 23 Januari 2017
REKAP ONGKOS TUKANG MINGGUAN
MINGGU KE : I (Satu)
NO NAMA UPAH/hr VOLUME JUMLAH KET.
1 Mawardi 100,000 7 hari 700,000 Mandor
2 Mat Rawi 85,000 7 hari 595,000 Kep. Tukang
3 Suja'i 80,000 7 hari 560,000 Operator sopir
4 Marsuki 60,000 7 hari 420,000 Pembantu sopir
5 Mattingwar 80,000 7 hari 560,000 Tukang batu
6 Hamdani 80,000 7 hari 560,000 Tukang batu
7 Sujali 80,000 7 hari 560,000 Tukang batu
8 Arofek 80,000 7 hari 560,000 Tukang batu
9 Syamsul 80,000 7 hari 560,000 Tukang batu
10 Baydewi 80,000 7 hari 560,000 Tukang batu
11 Arifin 60,000 7 hari 420,000 Pekerja
12 Dulhamit 60,000 7 hari 420,000 Pekerja
13 Badrus 60,000 7 hari 420,000 Pekerja
14 Halimi 60,000 7 hari 420,000 Pekerja
15 Kader 60,000 7 hari 420,000 Pekerja
16 Sapek 60,000 7 hari 420,000 Pekerja
JUMLAH 8,155,000
Sampang, 19 Desember 2016
REKAP ONGKOS TUKANG MINGGUAN
MINGGU KE : II (Dua)
NO NAMA UPAH/hr VOLUME JUMLAH KET.
1 Mawardi 100,000 7 hari 700,000 Mandor
2 Mat Rawi 85,000 7 hari 595,000 Kep. Tukang
3 Suja'i 80,000 7 hari 560,000 Operator sopir
4 Marsuki 60,000 7 hari 420,000 Pembantu sopir
5 Mattingwar 80,000 7 hari 560,000 Tukang batu
6 Hamdani 80,000 7 hari 560,000 Tukang batu
7 Sujali 80,000 7 hari 560,000 Tukang batu
8 Arofek 80,000 7 hari 560,000 Tukang batu
9 Syamsul 80,000 7 hari 560,000 Tukang batu
10 Baydewi 80,000 7 hari 560,000 Tukang batu
11 Arifin 60,000 7 hari 420,000 Pekerja
12 Dulhamit 60,000 7 hari 420,000 Pekerja
13 Badrus 60,000 7 hari 420,000 Pekerja
14 Halimi 60,000 7 hari 420,000 Pekerja
15 Kader 60,000 7 hari 420,000 Pekerja
16 Sapek 60,000 5 hari 300,000 Pekerja
JUMLAH 8,035,000
Sampang, 26 Desember 2016
REKAP ONGKOS TUKANG MINGGUAN
MINGGU KE : III (Tiga)
NO NAMA UPAH/hr VOLUME JUMLAH KET.
1 Mawardi 100,000 7 hari 700,000 Mandor
2 Mat Rawi 85,000 7 hari 595,000 Kep. Tukang
3 Suja'i 80,000 7 hari 560,000 Operator sopir
4 Marsuki 60,000 7 hari 420,000 Pembantu sopir
5 Mattingwar 80,000 7 hari 560,000 Tukang batu
6 Hamdani 80,000 7 hari 560,000 Tukang batu
7 Sujali 80,000 7 hari 560,000 Tukang batu
8 Arofek 80,000 7 hari 560,000 Tukang batu
9 Syamsul 80,000 7 hari 560,000 Tukang batu
10 Baydewi 80,000 7 hari 560,000 Tukang batu
11 Arifin 60,000 7 hari 420,000 Pekerja
12 Dulhamit 60,000 7 hari 420,000 Pekerja
13 Badrus 60,000 7 hari 420,000 Pekerja
14 Halimi 60,000 7 hari 420,000 Pekerja
15 Kader 60,000 7 hari 420,000 Pekerja
16 Sapek 60,000 7 hari 420,000 Pekerja
JUMLAH 8,155,000
Sampang, 02 Januari 2017

REKAP ONGKOS TUKANG MINGGUAN


MINGGU KE : IV (Empat)
NO NAMA UPAH/hr VOLUME JUMLAH KET.
1 Mawardi 100,000 7 hari 700,000 Mandor
2 Mat Rawi 85,000 7 hari 595,000 Kep. Tukang
3 Suja'i 80,000 7 hari 560,000 Operator sopir
4 Marsuki 60,000 7 hari 420,000 Pembantu sopir
5 Mattingwar 80,000 7 hari 560,000 Tukang batu
6 Hamdani 80,000 7 hari 560,000 Tukang batu
7 Sujali 80,000 7 hari 560,000 Tukang batu
8 Arofek 80,000 7 hari 560,000 Tukang batu
9 Syamsul 80,000 7 hari 560,000 Tukang batu
10 Baydewi 80,000 7 hari 560,000 Tukang batu
11 Arifin 60,000 7 hari 420,000 Pekerja
12 Dulhamit 60,000 7 hari 420,000 Pekerja
13 Badrus 60,000 7 hari 420,000 Pekerja
14 Halimi 60,000 7 hari 420,000 Pekerja
15 Kader 60,000 7 hari 420,000 Pekerja
16 Sapek 60,000 7 hari 420,000 Pekerja
JUMLAH 8,155,000
Sampang, 09 Februari 2017
REKAP ONGKOS TUKANG MINGGUAN

MINGGU KE : V (Lima)
NO NAMA UPAH/hr VOLUME JUMLAH KET.
1 Mawardi 100,000 7 hari 700,000 Mandor 35
2 Mat Rawi 85,000 7 hari 595,000 Kep. Tukang 35
3 Suja'i 80,000 7 hari 560,000 Operator sopir 35
4 Marsuki 60,000 7 hari 420,000 Pembantu sopir 35
5 Mattingwar 80,000 6 hari 480,000 Tukang batu 34
6 Hamdani 80,000 6 hari 480,000 Tukang batu 34
7 Sujali 80,000 6 hari 480,000 Tukang batu 34
8 Arofek 80,000 6 hari 480,000 Tukang batu 34
9 Syamsul 80,000 6 hari 480,000 Tukang batu 34
10 Baydewi 80,000 6 hari 480,000 Tukang batu 34
11 Arifin 60,000 5 hari 300,000 Pekerja 33
12 Dulhamit 60,000 5 hari 300,000 Pekerja 33
13 Badrus 60,000 7 hari 420,000 Pekerja 35
14 Halimi 60,000 7 hari 420,000 Pekerja 35
15 Kader 60,000 7 hari 420,000 Pekerja 35
16 Sapek 60,000 7 hari 420,000 Pekerja 33
JUMLAH 7,435,000
Sampang, 16 Januari 2017
39,935,000
REKAP ONGKOS TUKANG MINGGUAN
MINGGU KE : V1 (Empat)
NO NAMA UPAH/hr VOLUME JUMLAH KET.
1 Syamsul 100,000 7 hari 700,000 Mandor
2 Baydewi 85,000 7 hari 595,000 Kep. Tukang
3 Suja'i 80,000 6 hari 480,000 Operator sopir
4 Marsuki 60,000 6 hari 360,000 Pembantu sopir
5 Mattingwar 80,000 7 hari 560,000 Tukang batu
6 Hamdani 80,000 7 hari 560,000 Tukang batu
7 Sujali 80,000 7 hari 560,000 Tukang batu
8 Arofek 80,000 7 hari 560,000 Tukang batu
9 Syamsul 80,000 6 hari 480,000 Tukang batu
10 Baydewi 80,000 6 hari 480,000 Tukang batu
11 Arifin 60,000 7 hari 420,000 Pekerja
12 Dulhamit 60,000 7 hari 420,000 Pekerja
13 Badrus 60,000 7 hari 420,000 Pekerja
14 Halimi 60,000 7 hari 420,000 Pekerja
15 Kader 60,000 7 hari 420,000 Pekerja
16 Sapek 60,000 6 hari 360,000 Pekerja
JUMLAH 7,795,000
Sampang, 07 Februari 2015
40
6.00
29
29
29
28
29
29
29
29
29
28
28
29
29
29
29
29

You might also like