Industrial Engineering Batch 16-17 Re Exam

You might also like

Download as pdf
Download as pdf
You are on page 1of 2
SVKM’s NMIMS MUKESH PATEL SCHOOL OF TECHNOLOGY MANAGEMENT & ENGINEERING Programme: B. Tech (MECHATRONICS) Year: V Semester: VI Batch: 2016-17 Zi Academic Year: 2016-2017 a ir —— Subject: Industrial Engineering (#f arse Ti Marks: 60 sIDRARY JE Date: 27 May 2017 Time: 2.00 pi 4 No. of Pages: -2 Re-Examination Instructions: Candidates should read carefully the instructions printed on the question paper and on the cover of the Answer Book, which is provided for their use. 1) Question No. 1 is compulsory. 2) Out of remaining questions, attempt any 4 questions. 3) In all 5 questions to be attempted. 4) All questions carry equal marks. 5) Answer to each new quest 6) Figures in brackets on the right hand side i 7) Assume Suitable data if necessary. Q1_ Answer any 4 questions (Each carry 3 marks) (2) a) What is motion economy related to use of human body? b). Write on Techniques of work study. ©) What are the tools which are used for Recording of facts? 4) Mention the objectives of plant layout. ) Plant layout is an integral and important part in Industrial Engineering — Justify this. f) What are the benefits of Value Engineering. Q2 _ (@) “Productivity is an important factor in present day society” ~ justify this with reason. How productivity is measured in dynamic situation? Write the principles of scientific management. (6) (©) Ina company, in week 19%, it was observed that 620 activities were carried out in 1550 hours by the total workforce. Same workforce in week 20" carried out 595 activities in 1700 hours. Which productivity measures should be used? Is productivity increasing or decreasing? Justify your answer through calculation. © Q3 What are the basic procedures of work study? What considerations one has to do to select a job for work study procedure? American Society of Mechanical Engineers (ASME) has recommended standard symbols for process chart. Write these with their main activities. 2) Q4 What are the reasons for a re-layout of plant? What are the symptoms that would allow you to detect the need for a re-layout? What are the factors which affect plant layout designs? Mention these in ‘order and briefly explain these factors. (12) Q.5 (a) What is the significance of work measurement? What is the need of work sampling technique? Write advantages and disadvantages of sampling technique. (6) (b) The work shift at the Axlo Manufacturing Corporation runs from 7:00 am. to 3:45 p.m. with a 45 min break for lunch from 11:00 a.m. to 11:45 p.m, that does not count as part of the work shift (workers are not paid for this time). The company provides two 12-min rest breaks during working hours (paid time), one personal needs (paid time). In addition, a work sampling study has shown that on average, unavoidable delays in the plant result in 20 min lost time per worker per day (paid time). Determine the PFD allowance factor for the following two management policies on allowances: (a) the two 12-min breaks are both scheduled breaks that all workers take at the same time and (b) the two 12-min breaks are included in the allowance factor so that workers can take their breaks whenever they please. © the morning and one in the afternoon. The company also allows 25 min per day for Q.6 (a) What are the principles of ergonomics? Why anthropometry is important for ergonomics? ‘What does 5" percentile or 95 percentile means? © (b) What are the principles in applications of anthropometric data? What suggestions one can give for using anthropometric data? © Q7 How value analysis and productivity are connected? How do you define value ratio from producer perspective and customer perspective? What are types of values defined by Miles? Define each of them with examples. If scrap value is also considered, how can you relate all the values? 2)

You might also like