AMAZON SORT CENTER - J A I Y, JAIPUR (RAJ.

ANNEXURE – IX

DESIGN BASIS FOR STORM WATER DRAINAGE SYSTEM:-

⇒ RUN – OFF [DISCHARGE]


Q =10CIA

Where

Q = run-off (discharge) in cubic meters per hour (m3/hour).

C = Co-efficient /Impermeability factor of the surface.

I = Intensity of rainfall.

=> Taking 25 mm/hour for JAIPUR

( As per Rainfall Profile of Jaipur By IMD) Maximum Single day


Rainfall in last 50 years except cloud burst conditions is 183 mm on
July 25,1992. Thus for 10 Hours of rain maximum intensity is 18.3
mm per hour. See Annexure for details

A = Total Drainage Area in Hectare.

⇒ Co-efficient of Runoff/Impermeability Factor [C] :

⇒ Coefficient of runoff for various surfaces may be taken as:-

National Building Code of India 2016 Plumbing Services Part 9 (Page-47)

Section -2 Drainage & Sanitation

Coefficient of
Type of Surface
Runoff

Concrete roof area/ Corrugated metal sheets* 0.9

Paved podium areas and asphalted roads 0.8

Unpaved ground 0.3

Lawns and parks 0.15


* As per CPWD –Rain water Harvesting & Conservation Manual 2019 Page 10

( See annexure for details)

ASHI ASSOCIATES, F 9/ 440, KESHAV MARG, CHITRAKOOT, AJMER ROAD JAIPUR PAGE - 21
AMAZON SORT CENTER - J A I Y, JAIPUR (RAJ.)

⇒ Conversion Factor

• 1 Hectare = 10,000 Sq.mt

• 1 Sq.mt = 1/10,000 Hectare

RUN OFF (DISCHARGE) CALCULATION

PROPOSED BTS SC AMAZON SORT CENTRE- JAID JAIPUR


RUN OFF (DISCHARGE) CALCULATION
Intensi Total
ty of (m3/hr)
Catchment Area [A] Run Discharge
rainfal Dischar
off
Type of l ge
S.No. Coeffi
Structure/Surface (Run off)
cient
[C] (mm/ [Q=10
Sq ft. Sq mtr. Hectare [Q]
hour) CIA]
m3/hr
1 Building (Terrace Area)
10 x 0.90 x
a Area [A] 129552.34 12040.18 1.204 0.9 25 270.90
25 x 1.204
Say of [1] 271.00
2 Hard Landscape Area (Paved Surface)
10 x 0.80 x
a Area [P] 200425.96 18626.95 1.863 0.8 25 372.54
25 x 1.863
Say of [2] 373.00
3 Soft Landscape Area (General Ground)
10 x 0.30 x
a Area [G] 66808.65 6208.98 0.621 0.3 25 46.57
25 x 0.621
Say of [3] 47.00
Grand Total (1-3) 691.00

Considering coefficient of Evaporation/spillage and first flush etc.


1.00
· =
Total Storm Water Flow = 691.00 1.00 m3/hr
= 691 m3/hr
Say = 691 m3/hr
Total Storm Water Flow = 691 m3/hr

VOLUME OF STORM WATER DRAINAGE

Total Storm Water Flow = 691 m3/hr

Considering 15 minutes (0.25 Hr) Retention Period.

Volume Required = 691 0.25


3
= 172.75 m
3
Volume = 173 m
ASHI ASSOCIATES, F 9/ 440, KESHAV MARG, CHITRAKOOT, AJMER ROAD JAIPUR PAGE - 22
AMAZON SORT CENTER - J A I Y, JAIPUR (RAJ.)

TYPE OF HARVESTING PITS :- CIRCULAR


Considering 01 No. Rain Water Harvesting Pit of size 3.0 m dia and 3.50 m effective
depth.
Volume of 01 No. Rain Water Harvesting Pit MTR
Diameter of Pit (d) = 3.00 m
Liquid Depth [D] = 3.50 m
1x ̟/4 x d2
Volume of 01 No. Rain Water Harvesting Pit = xD
= 24.72750 m3
Say = 25 m3

Total 07 No. of rain water Harvesting pit required


Total Volume/Volume of Rain Water Harvesting Pit
6.920 Nos.
Say 7 Nos.
Providing 07 No. Rain Water Harvesting pit of size 3.0 m dia x 3.50 m
effective depth with 160 (OD) UPVC slotted pipe upto a layer where
sandy acquifers/permeable layers exist.

ASHI ASSOCIATES, F 9/ 440, KESHAV MARG, CHITRAKOOT, AJMER ROAD JAIPUR PAGE - 23