Material Take-Off List: Remarks
Material Take-Off List: Remarks
ARAMCO 6228(03/06)
SAMS TEMP. SAP PER DWG.
REV. CODE DESCRIPTION QTY I/U STATUS REMARKS
STOCK NUMBER NUMBER REQ. CODE
BGCS-5- OFFICE AREA
EXCAVATION 1661 M3
NOTES: 1. CONSTRUCTION CONTRACTOR SHALL VERIFY AND PROVIDE ALL QUANTITIES OF CONTRACTOR SUPPLIED MATERIAL
REQUIRED TO PERFORM THE WORK, AS DETAILED, ON THE CONSTRUCTION DRAWINGS.
APPROVAL
COMPILED BY REV. REFERENCE DRAWING
CHECKED DATE PROJECT ENGR DATE
SASEC 00 FOM 6/15/2015 FDB 6/15/2015 SK-5-S-003 & SK-5-S-005
CONTRACT NO. PHASE ENG. ITEM AREA START-UP DATE PRELIMINARY REVISION
CIVIL FINAL X REVISION 00
INDEX Material Take-Off for SHEET 1 OF 2
S
CIVIL WORKS ON BGCS-5-OFFICE AREA
PLANT SK-5-S-009
K53 YANBU SAUDI ARABIA
MATERIAL TAKE-OFF LIST
ARAMCO 6228(03/06)
SAMS TEMP. SAP PER DWG.
REV. CODE DESCRIPTION QTY I/U STATUS REMARKS
STOCK NUMBER NUMBER REQ. CODE
BGCS-5- ACCOMMODATION AREA
EXCAVATION 3779 M3
NOTES: 1. CONSTRUCTION CONTRACTOR SHALL VERIFY AND PROVIDE ALL QUANTITIES OF CONTRACTOR SUPPLIED MATERIAL
REQUIRED TO PERFORM THE WORK, AS DETAILED, ON THE CONSTRUCTION DRAWINGS.
APPROVAL
COMPILED BY REV. REFERENCE DRAWING
CHECKED DATE PROJECT ENGR DATE
SASEC 00 FOM 6/15/2015 FDB 6/15/2015 SK-5-S-002 & SK-5-S-004
CONTRACT NO. PHASE ENG. ITEM AREA START-UP DATE PRELIMINARY REVISION
CIVIL FINAL X REVISION 00
INDEX Material Take-Off for SHEET 2 OF 2
S
CIVIL WORKS ON BGCS-5-ACCOMMODATION AREA
PLANT SK-5-S-009
K53 YANBU SAUDI ARABIA