Note: Copyright Salzgitter Maschinenbau AG 2010. This publication has been prepared as an aid and should not be regarded as a substitute for the competent person. The competent person should also be familiar, as appropriate, with the latest version of related International, European and National standards. The contents of this documents are based on
the needs of SMAG and the conditions under which it operates. It shall not therefore be assumed that the contents stated therein necessarily meet the particular circumstances and requirements of other organisations. The principles set out in this document are for information only and therefore SMAG is not liable to any third party for any loss or damage
resulting from reliance on the contents. It is the responsibility of such external organisations to check that the document is the latest version and is appropriate for their purposes.
Repair operations planning and scheduling:
Following tools and equipment and tools have to be available:
1 Crane operator
2 skilled workers
1 open spanner 30 mm
Note: Copyright Salzgitter Maschinenbau AG 2010. This publication has been prepared as an aid and should not be regarded as a substitute for the competent person. The competent person should also be familiar, as appropriate, with the latest version of related International, European and National standards. The contents of this documents are based on
the needs of SMAG and the conditions under which it operates. It shall not therefore be assumed that the contents stated therein necessarily meet the particular circumstances and requirements of other organisations. The principles set out in this document are for information only and therefore SMAG is not liable to any third party for any loss or damage
resulting from reliance on the contents. It is the responsibility of such external organisations to check that the document is the latest version and is appropriate for their purposes.
1. Connect the Crane and place the Grab in OPEN Position on
the ground and lower the MOBILE TRAVERSE completely.
Note: Copyright Salzgitter Maschinenbau AG 2010. This publication has been prepared as an aid and should not be regarded as a substitute for the competent person. The competent person should also be familiar, as appropriate, with the latest version of related International, European and National standards. The contents of this documents are based on
the needs of SMAG and the conditions under which it operates. It shall not therefore be assumed that the contents stated therein necessarily meet the particular circumstances and requirements of other organisations. The principles set out in this document are for information only and therefore SMAG is not liable to any third party for any loss or damage
resulting from reliance on the contents. It is the responsibility of such external organisations to check that the document is the latest version and is appropriate for their purposes.
2. Open the box and disassemble the accumulator
and receiver
Note: Copyright Salzgitter Maschinenbau AG 2010. This publication has been prepared as an aid and should not be regarded as a substitute for the competent person. The competent person should also be familiar, as appropriate, with the latest version of related International, European and National standards. The contents of this documents are based on
the needs of SMAG and the conditions under which it operates. It shall not therefore be assumed that the contents stated therein necessarily meet the particular circumstances and requirements of other organisations. The principles set out in this document are for information only and therefore SMAG is not liable to any third party for any loss or damage
resulting from reliance on the contents. It is the responsibility of such external organisations to check that the document is the latest version and is appropriate for their purposes.
4. Open the Filter Cap and release the pressure out
of the Tank