The following provides a summary of current facility and process challenges, design period flows
and loadings, effluent goals, shortlisted process alternatives, and recommendations to prioritize
future improvements for the Grand Forks Wastewater Treatment Facility (GFWWTF):
DRAFT
control in individual bioreactors.
f. Complexity of balancing individual Microbubble Flotation (MBF) basin hydraulic
loadings and ineffective heavy/inorganic solids removal from MBF basins.
g. Future maximum month flows will cause exceedance of MBF recommended
solids loading rate (SLR) values, requiring expansion of secondary liquid-solids
separation capacity.
h. Lack of emergency backup power generator having capacity to operate one or
more 800 HP Turblex blowers and providing opportunities for energy efficiency
through power supplier-sponsored load management program implementation.
i. Lack of long-term biosolids management strategy implementation.
j. Distribution Building occupancy and failing to meet current code requirements of
the National Fire Protection Association, Standard 820 (NFPA 820).
k. Unreliable facility access road in winter weather.
DRAFT
Ingredion b
0.01 358 163 13 100 83 2
Landfill Leachate b
0.07 1,892 789 1,633 465 449 81
Liquid Waste/Septage b
0.02 2,200 1,080 1,251 5,672 2,800 250
Reserve Capacity b
2.5 20,000 6,255 850 7,300 3,650 166
Total Annual Average 13.8 74,347 28,551 8,780 47,688 24,583 1,689
Total Maximum Month Average
18.0 125,427 46,347 13,841 88,046 38,323 1,938
Day
Total Peak Hour 37.0 149,250 56,987 15,558 98,143 45,332 2,378
Notes:
a. Infiltration and Inflow (I & I) is included in the municipal flows.
b. Ingredion, Landfill Leachate, Liquid Waste/Septage, and Reserve Capacity flows and loads are equal across
different flow conditions.
3. Effluent Goals:
a. BOD < 25 mg/L
b. TSS < 25 mg/L
c. Total nitrogen < 10 mg/L
d. Total ammonia < 2 mg/L
e. TP < 1 mg/L
DRAFT
6. Recommended Phasing of Future Improvements:
a. Phase 1 - Yard Piping, General Improvements, Septage, and Backup Power
Generation
i. Yard piping to route influent to west end of distribution channel and
distribution channel piping to provide parallel bioreactor operation
capability
ii. General improvements related to maintenance, lighting, egress, C1D1
zone compliance, mechanical HVAC, equipping MBF-7 for future solids
loadings, etc., discussed in Section 5 of report:
1. Headworks, Process 101, MBF-7 equipping, MBF effluent channel
skimming
2. Distribution Building: Channel Zone, Blower Room, Garage and
Electrical Rooms
iii. Pond Diversion Vault: Septage Hauler Pad
iv. Emergency Backup Generator
v. Redistribution of solids within PC2
b. Phase 2 – BNR Retrofit of Bioreactors
i. Conversion of bioreactors for parallel operation, each bioreactor
containing its own anaerobic, anoxic, swing, and aerobic zone and its own
internal intermediate mixed liquor recycle loop
ii. Further capacity enhancement via IFAS, hydrocyclone, or a combination of
the two based upon actual future influent loadings and pilot test results
c. Phase 3 – Biosolids Management Facilities
i. WAS dewatering facility
ii. Air drying beds
iii. Related equipment
GFWWTF Facility Planning Report P00105-2018-019 Executive Summary
d. Phase 4 – Bioreactor Installation of IFAS
i. IFAS module installations
ii. Dedicated IFAS blower installation
A design, bidding, and construction phasing schedule is presented for the recommended
alternative, Alternative 2 – Biological Nutrient Removal Retrofit of Bioreactors and IFAS (Table 1
-2, Figure 1 -1). A phase-specific cost estimate for the recommended alternative is also given
below (Table 1 -3).
DRAFT
Biosolids Dewatering and Air Drying
Phase 3 2027 2028 2028-2031
Facilities
Bioreactor Installation of IFAS, if
Phase 4 2028 2028 2029-2031
necessary
Ph
Design Bid
Ph Construction
Ph
Ph
DRAFT
GFWWTF Facility Planning Report P00105-2018-019 Executive Summary