Content:-
1. Objective
2. Efficiently SSV Report Preparation (subcon)
3. SSV - Drive Test Flow
1. A. Moving Test Method & KPI
2. B1 Static Test – Attach Setup Time
3. B2 Static Test – EPS Bearer Setup Time
4. B3 Static Test – Ping Test
5. B4 Static Test – Static FTP UL & DL Test
6. B5 Static Test – Speed Test
4. Appendix 1 – Drive Test Basic Knowledge
5. Attachment 1 – DT using GENEX Probe V3R5
6. Attachment 2 - Single Site Verification Flow_V1.1
7. Attachment 3 - SSV Guideline (Simplified M.Word)
HUAWEI TECHNOLOGIES CO., LTD. Page
Huawei proprietary. No spread without permission. 2
Objective
Upon completion of these, you should able to:-
i. Understand the progress of SSV Report Preparation Progress
• Understand how is the progress of SSV test upon receive the
related site assigned

ii. How to conduct the SSV Drive Test on site


• Understand how to conduct the SSV test using GENEX Probe
and related equipment.

iii. Requirements from a SSV Test.

• Understand the output required from a SSV test.

HUAWEI TECHNOLOGIES CO., LTD. Page


Huawei proprietary. No spread without permission. 3
SSV Report Preparation Flow
(For Sub-Con)

HUAWEI TECHNOLOGIES CO., LTD. Page


Huawei proprietary. No spread without permission. 4
Efficiently SSV Report Preparation (subcon)
Received site assigned by Huawei

Site Audit Result Site Planning Output


- Lat Long - Prediction Cov Plot
- Azimuth - Comparison Cov Plot Clear to conduct SSV
- Tilting Not
Feedback
OK Huawei, re-
Drive Test Result test after re-
confirm
Prepare SSV Report Template with completed data
DT Engineer Upload file to
Complete SSV Report Public Server once COMPLETE,
send link to reporter.
Fill up KPI excel
Cross Check FULL Report
sheet, feedback
Huawei within 24
Submit to Huawei FULL SSV Report within 3 working days from hrs.
SSV Drive Test Completed date. KPI sheet:-
Not OK Reject to sub-con,
Close
OK Huawei Cross Check revised within 1
working day

HUAWEI TECHNOLOGIES CO., LTD. Page


Huawei proprietary. No spread without permission. 5
SSV Drive Test at Site

HUAWEI TECHNOLOGIES CO., LTD. Page


Huawei proprietary. No spread without permission. 6
SSV - Drive Test Flow
Site assign by Huawei

SSV Report

Site audit SSV Drive Test : Cross check Site


site alarm before start Planning
Note down Alarm type,
Yes feedback to Huawei
(performance alarm)
A. Moving Test B. Static Test

B1. Attach Setup B2. EPS Bearer B4. Static FTP UL B5. Speed Test
B3. Ping Test
Time Setup Time & DL Test

Feedback to
Huawei if there’s
Fill in KPI excel Sheet (within 24hrs after DT complete) any unachievable
KPI.

SSV Report

HUAWEI TECHNOLOGIES CO., LTD. Page


Huawei proprietary. No spread without permission. 7
A. Moving Test Method & KPI
A. Moving Test
KPI to look into-
KPI01 - Intra-HO : => 98%
KPI02 - EUTRAN Call Drop <=2%
1. Login to FTP Server using Filezilla and select KPI03 - SINR : =>2dB, =>96%
multiple file for DL.

2. Begin DT in clockwise & anti-clockwise


Other Aware
directions at least in two different file. Cross check on cross feeder / swap
sector problem during moving test.
3. Save the DT log, cross check all KPI achieved. Capture and report to Huawei if any.
Ensure naming of log are correct

4. Fill up the KPI excel sheet, submit to Huawei


within 24 hours

FTP Server:
IP : 10.255.1.2
UN / PW : huawei / huawei

(Log file naming format:- <ddmmyyyy>_<Sitename>_FMv_D<1/2>_<1/2/3/4/5…>


Example:- 31082013_ Angke Kusuma M-S-RT _FMv_D1_1)

HUAWEI TECHNOLOGIES CO., LTD. Page


Huawei proprietary. No spread without permission. 8
B1 Static Test – Attach Setup Time
B. Static Test

B1. Attach Setup


Time
KPI to look into-
1. Choose a good spot (RSRP > 85dBm, SINR > 20dB)
KPI04 – Ave. Attach Connection
Time : <500ms
2. Perform Attach Connection TimeTest, run test plan.
KPI05 – Attach SR : => 98%
(refer attachment) KPI06 – RRC SSR : => 98%

3. Save the DT log, cross check all KPI achieved. Ensure Other Aware
naming of log are correct Ensure 20 attach samples made.

4. Fill up the KPI excel sheet, submit to Huawei within Test Plan:
24 hours

(Log file naming format:- <ddmmyyyy>_<Sitename>_Att_S<1/2/3>


Example:- 31082013_ Angke Kusuma M-S-RT _Att_S1)
HUAWEI TECHNOLOGIES CO., LTD. Page
Huawei proprietary. No spread without permission. 9
B2 Static Test – EPS Bearer Setup Time
B. Static Test

B2. EPS Bearer


Setup Time

1. Choose a good spot (RSRP > 85dBm, SINR > 20dB) KPI to look into-
KPI06 – EPS Setup Time : <=105ms
2. Perform EPS Bearer Setup Test, run test plan.
(refer attachment)
Other Aware
Ensure 10 samples made.
3. Save the DT log, cross check all KPI achieved. Ensure
naming of log are correct
Test Plan:
4. Fill up the KPI excel sheet, submit to Huawei within
24 hours

(Log file naming format:- <ddmmyyyy>_<Sitename>_I2A_S<1/2/3>)


Example:- 31082013_ Angke Kusuma M-S-RT _I2A_S1)
HUAWEI TECHNOLOGIES CO., LTD. Page
Huawei proprietary. No spread without permission. 10
B3 Static Test – Ping Test
B. Static Test

B3. Ping Test

KPI to look into-


1. Choose a good spot (RSRP > 85dBm, SINR > 20dB)
KPI07 – Ping Latency: <=30ms
2. Perform Ping Test using CMD from Window.
Other Aware
- Ensure 100 samples made.
3. Screen shot the result, ensure KPI achieved.
- Ensure screen shot as below:

4. Fill up the KPI excel sheet, submit to Huawei within


24 hours

Ping command:-
a. ping 10.1.12.49 –n100
b. ping 10.1.12.105 –n 100

(Screen shot naming format:- <ddmmyyyy>_<Sitename>_Ping_S<1/2/3>)


Example:- 31082013_ Angke Kusuma M-S-RT _Ping_S1)
HUAWEI TECHNOLOGIES CO., LTD. Page
Huawei proprietary. No spread without permission. 11
B4 Static Test – Static FTP UL & DL Test
B. Static Test

KPI to look into-


B4. Static FTP UL
& DL Test
KPI08 FTP DL (Near) – 90% => 55Mbps
KPI09 FTP UL (Near) – 90% => 7Mbps

1. Choose 3 different location; Near, Middle, Far Other Aware


- Ensure Multiple tread DL / UL.
2. Perform FTP DL & FTP UL Test over Filezilla. - Ensure DL / UL more than 120sec / 2min
- Near (SINR >= 25 dB) / Middle (15 dB =<
3. Save the DT log, cross check all KPI achieved. Ensure
SINR < 25 dB) / Far (SINR < 15 dB)
naming of log are correct

4. Fill up the KPI excel sheet, submit to Huawei within


24 hours

FTP Server:
IP : 10.255.1.2
UN / PW : huawei / huawei
(Log file naming format :- <ddmmyyyy>_<Sitename>_FTP_<DL/UL>_<Nr/Md/Fr>_S<1/2/3>
Example:- 31082013_ Angke Kusuma M-S-RT_FTP_DL_Nr _S1)
HUAWEI TECHNOLOGIES CO., LTD. Page
Huawei proprietary. No spread without permission. 12
B5 Static Test – Speed Test
B. Static Test

KPI to look into-


B5. Speed Test N/A (ensure the throughput at near is
“readable”
1. Choose 3 different location; Near, Middle, Far
Other Aware
2. Perform Speedtest at www.speedtest.net
-Ensure correct server are chosen
- Near (SINR >= 25 dB) / Middle (15 dB =<
3. Choose the correct server related to operator for SINR < 25 dB) / Far (SINR < 15 dB)
test. Eg PT.Internux server @ Tangereng -Ensure screenshot correct as below:-
4. Screen shot the result, ensure KPI achieved.

5. Fill up the KPI excel sheet, submit to Huawei within


24 hours

(Screen shot naming format:- <ddmmyyyy>_<Sitename>_<Inux/Indo/SFren/Telkom>_<Nr/Md/Fr>_S<1/2/3>)


Example:- 31082013_ Angke Kusuma M-S-RT_Inux_Nr _S1)
HUAWEI TECHNOLOGIES CO., LTD. Page
Huawei proprietary. No spread without permission. 13
Appendix 1 – Drive Test Basic
Knowledge

HUAWEI TECHNOLOGIES CO., LTD. Page


Huawei proprietary. No spread without permission. 14
Radio Parameter @ GENEX Probe

PCI (Physical Cell Identifier)


Value range : 0 – 839, cross-check any cross
feeder problem when conducting moving
test.
RSRP (Reference Signal Receive Power)
 -70 dBm to -90 dBm → Good
 -91 dBm to -110 dBm → Normal
 -110 dBm to -130 dBm → Bad

SINR (Signal to Interference+Noise Ratio)


 16 dB to 30 dB → Good
 1 dB to 15 dB → Normal
 -10 dB to 0 dB → Bad

HUAWEI TECHNOLOGIES CO., LTD. Page


Huawei proprietary. No spread without permission. 15
Radio Parameter @ GENEX Probe…cont
Modulation Coding Scheme

64 QAM → Good
16 QAM → Normal
QPSK → Bad

Neighboring cell Downlink EARFCN

HUAWEI TECHNOLOGIES CO., LTD. Page


Huawei proprietary. No spread without permission. 16
On-Site Hardware

MIMO Antenna

BBU : Baseband Unit

RRU : Radio Remote Unit

HUAWEI TECHNOLOGIES CO., LTD. Page


Huawei proprietary. No spread without permission. 17
Attachment 1 – DT using GENEX
Probe V3R5

Guideline on Probe V3R5

HUAWEI TECHNOLOGIES CO., LTD. Page


Huawei proprietary. No spread without permission. 18
Attachment 2 –
Single Site Verification Flow_V1.1

SSV Flow V1.1 (Full Flow)

HUAWEI TECHNOLOGIES CO., LTD. Page


Huawei proprietary. No spread without permission. 19
Attachment 3 –
SSV Guideline
(Simplified M.Words)
SSV Guideline (Microsoft Words)

HUAWEI TECHNOLOGIES CO., LTD. Page


Huawei proprietary. No spread without permission. 20
Thank you
www.huawei.com

Copyright©2011 Huawei Technologies Co., Ltd. All Rights Reserved.


The information in this document may contain predictive statements including, without limitation,
statements regarding the future financial and operating results, future product portfolio, new
technology, etc. There are a number of factors that could cause actual results and developments to
differ materially from those expressed or implied in the predictive statements. Therefore, such
information is provided for reference purpose only and constitutes neither an offer nor an
acceptance. Huawei may change the information at any time without notice.

You might also like