Professional Documents
Culture Documents
Geotechnical Engineering H: Ke (Q k-2 KZ (Eg)
Geotechnical Engineering H: Ke (Q k-2 KZ (Eg)
Geotechnical Engineering H: Ke (Q k-2 KZ (Eg)
kz(eq)0.620352 cm/day
10 ft/min.
D
Water
Sand
Hz
H
Sit
Water
Porous stone
Figure 03.23
annular ring
same silt, but the
ot this second mold is filled