Laboratorium Mekanika Tanah

Bore No : HB-5
Program Studi Teknik Sipil ( e and Cv ) Graph Depth : 1.50 - 2.00 m
Fakultas Teknik CONSOLIDATION TEST Date : 2 November 2020
Universitas Darma
Agung Medan Test by : Edward S.

1.13

1.09

1.05
Void Ratio

1.01

0.97

0.93

0.89

0.85

0.81
0.1 1.0 10.0
C o e f C o n s o lid a s i (C v )

( Pressure ) in kg/cm2

0.020

0.016

0.012

0.008

0.004

0.000
0.1 1.0 10.0

Max Precompression : 4.00 Kg/Cm2 Sample Area : 33.18 Cm2


In Situ void Ratio ( eo ) : 1.169 Sample Height : 2.00 Cm
Coef of Consol ( Cv ) : 1.05E-02 (Cm2/sec) Volume spl : 66.37 Cm3
Compres Index ( Cc ) : 0.5799 Diameter spl : 6.50 Cm
Permeability (K ) : 6.20E-07 (Cm/sec)

Project : Location : Page :


Ruas Jalan
Barus - 16
Perencanaan Teknis Paket 4 Pakkat KM. 80 + 200 (SBG)

Kab. Tapanuli Tengah


Laboratorium Mekanika Tanah

Program Studi Teknik Sipil Fakultas Teknik GRAPHIC CONSOLIDATION TEST

Universitas Darma Agung Medan

Bore No. : HB-5 Date : 2 November 2020


Depth : 1.50 - 2.00 m Test By : Edward S.

CONSOLIDATION GRAPH

195.00

215.00
Dial Reading

235.00

255.00

275.00

`
295.00

315.00
0 1 2 3 4 5 6 7 8
Time

Teg : 4.00 t90 : 2.85 Mnt t90 : 487.35 Sec

Project : Location : Page :


Ruas Jalan
Barus - 15
Perencanaan Teknis Paket 4 Pakkat KM. 80 + 200 (SBG)

Kab. Tapanuli Tengah


Laboratorium Mekanika Tanah

Program Studi Teknik Sipil Fakultas Teknik GRAPHIC CONSOLIDATION TEST

Universitas Darma Agung Medan

Bore No. : HB-5 Date : 2 November 2020


Depth : 1.50 - 2.00 m Test By : Edward S.

CONSOLIDATION GRAPH

120.00

130.00

140.00
Dial Reading

150.00

160.00

170.00

`
180.00

190.00
0 1 2 3 4 5 6 7 8
Time

Teg : 2.00 t90 : 2.65 Mnt t90 : 421.35 Sec

Project : Location : Page :


Ruas Jalan
Barus - 14
Perencanaan Teknis Paket 4 Pakkat KM. 80 + 200 (SBG)

Kab. Tapanuli Tengah


Laboratorium Mekanika Tanah

Program Studi Teknik Sipil Fakultas Teknik GRAPHIC CONSOLIDATION TEST

Universitas Darma Agung Medan

Bore No. : HB-5 Date : 2 November 2020


Depth : 1.50 - 2.00 m Test By : Edward S.

CONSOLIDATION GRAPH

80.00

90.00
Dial Reading

100.00

`
110.00

0 1 2 3 4 5 6 7 8
Time

Teg : 1.00 t90 : 2.40 Mnt t90 : 345.60 Sec

Project : Location : Page :


Ruas Jalan
Barus - 13
Perencanaan Teknis Paket 4 Pakkat KM. 80 + 200 (SBG)

Kab. Tapanuli Tengah


Laboratorium Mekanika Tanah

Program Studi Teknik Sipil Fakultas Teknik GRAPHIC CONSOLIDATION TEST

Universitas Darma Agung Medan

Bore No. : HB-5 Date : 2 November 2020


Depth : 1.50 - 2.00 m Test By : Edward S.

CONSOLIDATION GRAPH

60.00

65.00
Dial Reading

70.00

75.00

80.00
0 1 2 3 4 5 6 7 8
Time

Teg : 0.50 t90 : 2.02 Mnt t90 : 244.82 Sec

Project : Location : Page :


Ruas Jalan
Barus - 12
Perencanaan Teknis Paket 4 Pakkat KM. 80 + 200 (SBG)

Kab. Tapanuli Tengah


Laboratorium Mekanika Tanah

Program Studi Teknik Sipil Fakultas Teknik GRAPHIC CONSOLIDATION TEST

Universitas Darma Agung Medan

Bore No. : HB-5 Date : 2 November 2020


Depth : 1.50 - 2.00 m Test By : Edward S.

CONSOLIDATION GRAPH

0.00

10.00
Dial Reading

20.00

30.00

40.00

`
50.00

60.00
0 1 2 3 4 5 6 7 8
Time

Teg : 0.25 t90 : 1.72 Mnt t90 : 177.50 Sec

Project : Location : Page :


Ruas Jalan
Barus - 11
Perencanaan Teknis Paket 4 Pakkat KM. 80 + 200 (SBG)

Kab. Tapanuli Tengah


Laboratorium Mekanika Tanah
CONSOLIDATION TEST
Program Studi Teknik Sipil Fakultas Teknik (ASTM D - 2435)
Universitas
Darma Agung Medan

Bore No. : HB-5 Date : 2 November 2020


Depth : 1.50 - 2.00 m Test By : Edward S.

Time Load (Kg)


0.825 1.650 3.300 6.600 13.200 25.400 6.600 0.825 Keterangan

0" 0.000 63.800 82.800 120.700 191.900 308.400 306.500


9,6 " 15.000 66.300 86.900 136.600 217.100
21,4 " 18.500 67.200 88.700 139.100 223.400
38,4 " 21.200 67.900 90.000 143.400 227.500
1,0 ' 24.700 69.100 91.800 147.900 234.600
2,25 ' 28.900 70.300 94.100 155.600 245.700
4,0 ' 35.900 71.900 97.900 164.700 257.400
9,0 ' 40.500 73.500 103.500 170.800 270.900
16,0 ' 45.200 74.600 107.300 174.800 281.400
25,0 ' 51.000 75.800 110.000 177.900 286.900
36,0 ' 53.100 76.700 111.500 179.300 290.200
49,0 ' 55.700 77.400 112.200 180.500 291.700

24 Hours 63.800 82.800 120.700 191.900 308.400 306.500 268.500

Hs = 0.9220 cm Diameter of Ring =


6.50 Cm
Moisture Content & Before After Void Ratio & Before After
Wet Density Test Test Degree Of Saturation Test Test Area (A) =
Wt. Wet Soil + Ring (gr) 286.41 281.48 Tikcnes (H) Cm 2.000 1.732 33.18 Cm2
Wt. Ring (gr) 185.27 185.27 H - Hs
Wt. Wet Soil (gr) 101.14 96.21 eo = --------------- 1.169 0.878 Volume of Soil Before Test
Wt. Dry Soil 77.28 77.28 Hs 66.37 Cm3
Wt. Of Water (gr) 23.86 18.93 Moisture Content (%) 30.87 24.50 Volume of Soil After Test
Moisture Content (%) 30.87 24.50 Degree Of Saturation 66.700 70.470 57.46 Cm3
Wet Density (gr/cc) 1.524 1.674 Specifik Gravity (Gs) 2.526 2.526
Setlement Hight Of Cv =
Pressure Dial Original Correct AH Ae = e= Average Sample t 90 0,848. Ha^2
Reading Setlement Tool AH/Hs eo - Ae Setlement Hm (Second) t 90
(Kg/Cm2) (Cm) (Cm) (Cm2/Sec)
0.00 0.000 0.000 -
0.25 63.800 63.800 - 0.0638 0.0692 1.1001 0.0319 1.9681 177.504 1.85E-2
0.50 82.800 82.800 - 0.0828 0.0898 1.0795 0.0733 1.9267 244.824 1.29E-2
1.00 120.700 120.700 - 0.1207 0.1309 1.0384 0.1018 1.8983 345.600 8.84E-3
2.00 191.900 191.900 - 0.1919 0.2081 0.9611 0.1563 1.8437 421.350 6.84E-3
4.00 308.400 308.400 - 0.3084 0.3345 0.8348 0.2502 1.7499 487.350 5.33E-3
2.00 306.500 306.500 - 0.3065 0.3324 0.8368 0.3075 1.6926
0.25 268.500 268.500 - 0.2685 0.2912 0.8780 0.2875 1.7125
Average 1.05E-2

Project : Location : Page :


Ruas Jalan
Barus - Pakkat 9
Perencanaan Teknis Paket 4 KM. 80 + 200 (SBG)
Kab.
Tapanuli Tengah
Laboratorium Mekanika Tanah
PERMEABILITY OF
Program Studi Teknik Sipil Fakultas Teknik CONSOLIDATION TEST
Universitas Darma Agung Medan (ASTM D - 2435)

Bore No. : HB-5 Date : 2 November 2020


Depth : 1.50 - 2.00
0 m Test By :
: Edward S.0

Pressure H AH AH/H Mv Cv K = Mv.Cv.Yw


(Kg/Cm2) (Cm) (Cm) (Cm) (Cm2/Kg) (Cm2/sec) (Cm/sec)
(1) (2) (3) (4) (5) = 4/1 (6) (7)

0.25 1.9362 0.0638 0.0330 0.1318 1.85E-2 2.44E-6

0.50 1.9172 0.0190 0.0099 0.0198 1.29E-2 2.55E-7

1.00 1.8793 0.0379 0.0202 0.0202 8.84E-3 1.78E-7

2.00 1.8081 0.0712 0.0394 0.0197 6.84E-3 1.35E-7

4.00 1.6916 0.1165 0.0689 0.0172 5.33E-3 9.17E-8