Assume The Pile Is Prestressed Concrete and Diameter of Pile Is 508mm and Length Is 25m D
Assume The Pile Is Prestressed Concrete and Diameter of Pile Is 508mm and Length Is 25m D
SN: 15700681
HW#2 sub. Date: 4/6
GIVEN:
=40 (n1-1)1.778+0.508
n1=23
=30 (n2-1)1.778+0.508
n2=18
AS group:
=
40*30*100*7.2+140*(80*25+100*40)=1704000KN
As individual pile:
=80/100 = 0.8
=100/100 = 1
From table 11.10 we get α1=0.54 and α2=0.48
= 23*18*(9*0.2581*100+0.54*2.032*80*28+0.48*2.032*100*40)=2728937.8KN
HENCE TAKE THE SMALLER VALUE
= 1704000/4 =426000KN
160000/(40+5.65)
(30+5.65)=98.31KN/m^2
6*17.3 +(5.3+(16.7/2))*(20-9.81)=242.9KN/m^2
= (0.225*(28-16.7)/(1+0.75))log(242.9+98.31/242.9) = 0.215m
Since in the first layer we get high sett. We do not need to calculate for thee second one
To solve this problem we need to improve the soil otherwise we can not satisfied the allowable sett.
(75mm) because I tried when the length of pile is 60m(as max. length) I got 192mm sett.