BELAL MO AL MOKDAD

SN: 15700681
HW#2 sub. Date: 4/6

GIVEN:

ALLOWBLE SETT. IS 75mm


LL:35%
30*40m
SumW=160000KN
H1=28m H2=40m Dw=6m ჾ1=17.3KN/m^2
ჾ2=18.5KN/m^2 FS=4
ჾsat=20KN/m^2 Cu1= 80Kpa Cu2=100Kpa

Assume the pile is prestressed concrete and


diameter of pile is 508mm and length is 25m
d= = 3.5(0.508) = 1.778m

=40 (n1-1)1.778+0.508
n1=23
=30 (n2-1)1.778+0.508
n2=18

Number of piles is 23*18= 414

#find the Qg all

AS group:

1.33 25/30 = 0.833

=
40*30*100*7.2+140*(80*25+100*40)=1704000KN

As individual pile:

=80/100 = 0.8

=100/100 = 1
From table 11.10 we get α1=0.54 and α2=0.48
= 23*18*(9*0.2581*100+0.54*2.032*80*28+0.48*2.032*100*40)=2728937.8KN
HENCE TAKE THE SMALLER VALUE

= 1704000/4 =426000KN

I reduced the length of pile from 45m to 25m and


still the Q all is high.

# FIND THE CONS. SETT.


(2/3)25= 16.7m start z

160000/(40+5.65)
(30+5.65)=98.31KN/m^2

6*17.3 +(5.3+(16.7/2))*(20-9.81)=242.9KN/m^2

= (0.225*(28-16.7)/(1+0.75))log(242.9+98.31/242.9) = 0.215m

Since in the first layer we get high sett. We do not need to calculate for thee second one
To solve this problem we need to improve the soil otherwise we can not satisfied the allowable sett.
(75mm) because I tried when the length of pile is 60m(as max. length) I got 192mm sett.