GENERAL SHEET NOTES - NO.

DATE ISSUE

FLOOR PLANS 1
2
05/13/2020
06/05/2020
Concept Design Final
SD 50%
3 2020/08/07 Concept MP Redesign 1
A LETTERED KEY NOTES DO NOT IMPLY SEQUENCE.
4 2020/08/11 Concept MP Redesign 2
CONTRACTOR TO PERFORM WORK AS REQUIRED PER WORK
SEQUENCE. 7 2020/08/27 Concept MP Redesign 3
B ALL METAL STUD IS 25 GAUGE STEEL STUDS @600mm O.C., 8 2020/09/10 Concept MP Redesign 4
U.N.O. 10 2020/09/21 Concept MP Redesign 5
C ALL PARTITIONS ABOVE GLASS PARTITIONS <LOCATIONS> TO 16 2020/10/13 Schematic Design Rev 7
BE TYPE G01 U.N.O. 18 2020/10/15 Schematic Design Rev 9
D ALL UNFINISHED COLUMNS TO RENDERED WITH FINISH 20 2020/10/23 Schematic Design Rev 11
CONCRETE, U.N.O.
E PATCH AND REPAIR EXISTING WALLS AND PARTITIONS
SCHEDULED TO REMAIN, INCLUDING CORE WALLS AND
COLUMN ENCLOSURES. PREPARE WALLS AS REQUIRED FOR
SCHEDULED FINISHES.
F ALL DIMENSIONS ARE TO FACE OF GYP BOARD U.N.O.
G MAINTAIN DIMENSIONS INDICATED TO BE "CLEAR", "HOLD" OR
"MIN”. REVIEW VARIATIONS ON THESE DIMENSIONS WITH THE
ARCHITECT BEFORE BEGINNING CONSTRUCTION.
H REVIEW DIMENSIONS NOTED WITH "VIF" WITH ARCHITECT
BEFORE BEGINNING CONSTRUCTION.
J LAY OUT ALL PARTITIONS AND DOOR LOCATIONS ON FLOOR,
FOR REVIEW AND ACCEPTANCE BY ARCHITECT PRIOR TO
PROCEEDING WITH CONSTRUCTION.
K PROVIDE BANDING AND BLOCKING AT WALL HUNG EQUIPMENT
AND FURNISHINGS. COORDINATE LOCATIONS WITH
ARCHITECT.
L COORDINATE LOCATIONS OF ACCESS PANELS IN WALL AND
CEILINGS WITH ARCHITECT PRIOR TO INSTALLATION. WHERE
EXISTING ACCESS PANELS CONFLICT WITH NEW WORK,
CONTACT ARCHITECT TO COORDINATE NEW LOCATION FOR
ACCESS PANELS.
M REFER TO AV DRAWINGS FOR MOUNTING HEIGHTS AND
A'6 CONDUIT REQUIREMENTS AT LOCATIONS OF MONITORS AND
AV EQUIPMENT.
N REPAIR AND/OR REPLACE DAMAGED EXISTING CONVECTOR SEAL
ENCLOSURES. REPLACE MISSING GRILLE AS REQUIRED.
03
02
O MANUFACTURER'S NAME, TRADEMARK, AND LOGOS SHALL
A-221
NOT BE VISIBLE

N
1 02 01
A-321 A-322 A-322

TROLLY HOLDING
AREA KEY PLAN
Assistant Head of
School
3.8.1.2
17.7 m²
T.O.F. -0.150 m
T.O.S. -0.350 m Servery
6.2.3.3 Head of School
38.2 m² 3.8.1.1 1045 Huai Hai Middle Road
23.8 m² Huai Hai Plaza

00
Pro. Develop. + 38th Floor, Suite 3803

105
Pantry Shanghai 200031 China
PREPARATION AREA 4.1.1 T. + 86 21 6252 1040
A-6 127.4 m²
3700
90 Conf Owner:
00 3-RUN STAIR 3.8.1.4
MS/US Cafeteria 24 m²
(473) seats
Van Giang Commerce and Tourism Township, Xuan
6.2.2.2 MARKUP LEGEND
27000
7800

618.8 m² Quan Commune, Van Giang district, Ecopark, Vietnam


Unisex Toilet
Culinary Arts Construction Manager:
3.5.5 StairUP
Reception & Admin
3.8.1.3
PARTITION
91.5 m² 38.2 m²
10
27.3 m² Wall Partition Rw+c ≥ 39dB
A-5 Unisex Toilet

Civil / Site:
Corridor Wall Partition Rw+c ≥ 47dB
4200

10
126.6 m²
UP

A-4
Wall Partition Rw+c ≥ 56dB
UP Landscape:

CMU WALLS
Vestibule
01 Vestibule 10.1.1 Wall Partition Rw+c ≥ 49dB
9000

MDB 17.6 m² Structural:


10.1.1
A-222 44.5 m²
10
Common Space 17.3 m²
1 10
A-311
134.2 m²
2500
Wall Partition Rw+c ≥ 60dB
MS/US Lobby MS/US LIBRARY
Stor. 5.2.1
6.1.1
105.6 m² 10 313.2 m² MEP:

1200
5.3 m²
A-3
LINING

A-222
02
IDF
10
Lining
4200

3 m²

A-2 GLASS PARTITION PROJECT TITLE:


02 Stair Girl's Toilet Glazing Partition Rw+c ≥ 37dB
A-212
ECOPARK DAESUNG
10 3.3.4
40.6 m² 19.5 m²
CCTV + FIRE
CONTROL Glazing Partition Rw+c ≥ 47dB
INTERNATIONAL
7800

10 LOCKER + LAUNDRY
29.6 m² A-1.1
FOR KITCHEN
Boy's Toilet
G6 DOOR
3.1.1
74.8 m²
G6
3.1.1
75 m²
G6
3.1.1
75 m²
G6
3.1.1
75 m²
G6
3.1.1
75 m²
G6
3.1.1
74.8 m²
3.3.4
20.3 m²
SCHOOL
A-1 Door Rw+c ≥ 30dB

Door Rw+c ≥ 34dB HANOI, VIETNAM


4200

A-0.1 Door Rw+c ≥ 40dB

Double door Rw+c ≥ 45dB PROJECT No: 82630


8400 8400 8400 8400 8400 8400 8400 8400 4200
DRAWING TITLE:

LEVEL 1 ZONE B
82630_ARCH_2020_detached.rvt

A-K A-L A-M A-N A-O A-P A-Q A-R A-S A-T

SCALE: 1 : 200
01

A-112
A-221
11/6/2020 7:48:44 PM

L1 - ZONE B SCHEMATIC DESIGN


1 1 : 200
2020.11.06