GENERAL SHEET NOTES - NO.

DATE ISSUE

FLOOR PLANS 1
2
05/13/2020
06/05/2020
Concept Design Final
SD 50%
0 3 2020/08/07 Concept MP Redesign 1
A- 2 A LETTERED KEY NOTES DO NOT IMPLY SEQUENCE.
23 4 2020/08/11 Concept MP Redesign 2
2 CONTRACTOR TO PERFORM WORK AS REQUIRED PER WORK
SEQUENCE. 7 2020/08/27 Concept MP Redesign 3
B ALL METAL STUD IS 25 GAUGE STEEL STUDS @600mm O.C., 8 2020/09/10 Concept MP Redesign 4
U.N.O. 10 2020/09/21 Concept MP Redesign 5
C ALL PARTITIONS ABOVE GLASS PARTITIONS <LOCATIONS> TO 15 Date 16 Concept MP Redesign 6
BE TYPE G01 U.N.O. 16 2020/10/13 Schematic Design Rev 7
D ALL UNFINISHED COLUMNS TO RENDERED WITH FINISH 20 2020/10/23 Schematic Design Rev 11
CONCRETE, U.N.O.
E PATCH AND REPAIR EXISTING WALLS AND PARTITIONS
SCHEDULED TO REMAIN, INCLUDING CORE WALLS AND
COLUMN ENCLOSURES. PREPARE WALLS AS REQUIRED FOR
SCHEDULED FINISHES.
F ALL DIMENSIONS ARE TO FACE OF GYP BOARD U.N.O.
G MAINTAIN DIMENSIONS INDICATED TO BE "CLEAR", "HOLD" OR
"MIN”. REVIEW VARIATIONS ON THESE DIMENSIONS WITH THE
ARCHITECT BEFORE BEGINNING CONSTRUCTION.
H REVIEW DIMENSIONS NOTED WITH "VIF" WITH ARCHITECT
BEFORE BEGINNING CONSTRUCTION.
J LAY OUT ALL PARTITIONS AND DOOR LOCATIONS ON FLOOR,
FOR REVIEW AND ACCEPTANCE BY ARCHITECT PRIOR TO
PROCEEDING WITH CONSTRUCTION.
K PROVIDE BANDING AND BLOCKING AT WALL HUNG EQUIPMENT
AND FURNISHINGS. COORDINATE LOCATIONS WITH
ARCHITECT.
L COORDINATE LOCATIONS OF ACCESS PANELS IN WALL AND
CEILINGS WITH ARCHITECT PRIOR TO INSTALLATION. WHERE
EXISTING ACCESS PANELS CONFLICT WITH NEW WORK,
CONTACT ARCHITECT TO COORDINATE NEW LOCATION FOR
ACCESS PANELS.
M REFER TO AV DRAWINGS FOR MOUNTING HEIGHTS AND
CONDUIT REQUIREMENTS AT LOCATIONS OF MONITORS AND
AV EQUIPMENT.
N REPAIR AND/OR REPLACE DAMAGED EXISTING CONVECTOR SEAL
ENCLOSURES. REPLACE MISSING GRILLE AS REQUIRED.
03
02
O MANUFACTURER'S NAME, TRADEMARK, AND LOGOS SHALL
A-221
NOT BE VISIBLE

N
1 02 01
A-321 A-322 A-322

KEY PLAN

1045 Huai Hai Middle Road


Huai Hai Plaza
38th Floor, Suite 3803
Shanghai 200031 China
T. + 86 21 6252 1040
A-6 GRADE 10
TOILET (W) 3.1.5
3700 10 75 m² Owner:
2-RUN STAIR 14.6 m²

Art Room (3D) GRADE 10 GRADE 10 GRADE 10 GRADE 10 Van Giang Commerce and Tourism Township, Xuan
3.6.2 Art Room (3D) 3.1.5 3.1.5 3.1.5 3.1.5 MARKUP LEGEND
7800

74.8 m² 3.6.2 75 m² 75 m² 75 m² 75 m² Quan Commune, Van Giang district, Ecopark, Vietnam


75 m²
UP TOILET (M) Construction Manager:
StairUP 10 PARTITION
10 GRADE 10
8.7 m² 3.1.5
29.8 m²
76.1 m² Wall Partition Rw+c ≥ 39dB
A-5

Civil / Site:
Wall Partition Rw+c ≥ 47dB
4200

Corridor
A-4
10 Wall Partition Rw+c ≥ 56dB
243.6 m²
Landscape:

UP
Art Storage LS TS
3.6.5 Office 3.8.4.1 CMU WALLS
Common Space 3.8.4.2 31.4 m²
36.7 m²
01 10 STORAGE Wall Partition Rw+c ≥ 49dB
9000

Visual Arts 18.5 m² DB Structural:


43.6 m² 4 Vestibule
A-222 Commons | Gallery 12.3 m² 2500
10 10.1.1
3.6.6 3 m² 16.4 m²
59.8 m²
2 UP Wall Partition Rw+c ≥ 60dB

1200
Unassigned Kiln Room Art Storage
A-321 3.6.3 3.6.5 LS TS
3.6.4 3.8.4.1 MEP:
95.9 m² 9.9 m² 34.6 m²
A-3
30.7 m²
LINING

A-222
02
IDF
10
Lining
4200

3 m²

A-2 GLASS PARTITION PROJECT TITLE:


Stair Girl's Toilet
02 10 3.3.4 Glazing Partition Rw+c ≥ 37dB
A-212
UP
36.3 m² 19.5 m²
ECOPARK DAESUNG
Glazing Partition Rw+c ≥ 47dB
INTERNATIONAL
7800

A-1.1

GRADE 9 DOOR
SCHOOL
Art Room (2D) GRADE 9 3.1.4 GRADE 9 GRADE 9
3.6.1 Art Room (2D) 3.1.4
GRADE 9 3.1.4
3.1.4 73.4 m² 3.1.4
73.1 m² 3.6.1 73.4 m² 73.4 m² 73.4 m²
73.4 m² 73.4 m²
A-1 Door Rw+c ≥ 30dB
Boy's Toilet
GRADE 9 3.3.4
3.1.4 21.4 m²
Door Rw+c ≥ 34dB HANOI, VIETNAM
4200

73.4 m²

A-0.1 Door Rw+c ≥ 40dB

Double door Rw+c ≥ 45dB PROJECT No: 82630


8200 8400 8400 8400 8400 8400 8400 8400 8400 4200
DRAWING TITLE:

A-J A-K A-L A-M A-N A-O A-P A-Q A-R A-S A-T
LEVEL 3 ZONE B
82630_ARCH_2020_detached.rvt

SCALE: 1 : 200
01

A-132
A-221
11/6/2020 7:51:57 PM

A-U

SCHEMATIC DESIGN
L3 - ZONE B