Slide 1

 Higher volume of standardized goods


 High volume and here a slight flexibility of equipment
 Repetitive process type

Slide 2

 Large volumes
 Work is divided into a series of standardized tasks, and they use a division of labor
 Product layout types

Slide 3

 4 product line in their production system


 At each product line they are capable to produce 120 pieces of shirt
 The actual production is 85-90 pieces of shirt
 Produce 2800 shirt at a day by using 4 product line

Slide 4

Add the picture of product layout

Slide 5

 Total working hour is 8 hours


 Approximately 2800 shirts every day
 Cycle time of 0.17 minute per shirt