High volume and here a slight flexibility of equipment Repetitive process type
Slide 2
Large volumes Work is divided into a series of standardized tasks, and they use a division of labor Product layout types
Slide 3
4 product line in their production system
At each product line they are capable to produce 120 pieces of shirt The actual production is 85-90 pieces of shirt Produce 2800 shirt at a day by using 4 product line
Slide 4
Add the picture of product layout
Slide 5
Total working hour is 8 hours
Approximately 2800 shirts every day Cycle time of 0.17 minute per shirt