Professional Documents
Culture Documents
ENR Microwave Towers - Phase One
ENR Microwave Towers - Phase One
ENR Microwave Towers - Phase One
1- El Marg-Cairo
The tower
The tower:
The tower
Supporting condition : Supported before. (Requires the Consultant report).
Height : 100 meters.
Concrete Base : Have some cracks & needs to be strengthened
No of antennas : 2.
Air Craft Warning Light : Not working (requires a new one).
Lightning protection Working
system :
The Site
Area : 16.5 m * 14.5m.
Boundary wall : Needs a new boundary wall 3 m height & 1 meter
barbed wired.
Electric Source : Electric panel near the entrance gate.
The cabinet requirement : 1. Concrete base for the outdoor cabinet 3*3 Meter.
2. Build a steel umbrella.
3. Install cable tray from the cabinet to the tower.
The Site
7- Ifwa-Upper Egpyt:
The tower
Supporting condition : Not supported before.
Height : 100 meters.
Concrete Base : Have some cracks & needs to be strengthened
No of antennas : 2.
Air Craft Warning Light : Working.
Earth connection : Not working (required a new one).
Lightning protection system : Working.
The Site
Area : 20 m * 13m.
Boundary wall : Can be kept as it is.
Electric Source : Electric panel near the entrance gate.
The cabinet requirement : 1. Concrete base for the outdoor cabinet.
2. Build a steel umbrella.
3. Install cable tray from the cabinet to the tower.
8- Qaha :
The tower
The Site
9- Kafr Elgazzar:
The tower
Supporting condition : Supported before. (Requires the Consultant
report).
Height : 65 meters.
Concrete Base : Have some cracks & needs to be strengthened
No of antennas : 3.
Air Craft Warning Light : Not working (requires a new one).
Earth connection : Not connected (requires a new one).
Lightning protection system : Working.
The Site
Area : 17 m * 13m.
Boundary wall : Needs a new boundary wall 3 m height & 1 meter
barbed wired.
Electric Source : From the old shelter
The cabinet requirement : 1. Concrete base for the outdoor cabinet 3*3m.
2. Build a steel umbrella.
3. Install cable tray from the cabinet to the tower.
10- Zagazig:
The tower
The Site
Area : 20 m * 13m.
Boundary wall : It can be kept as it is.
Electric Source : From the railway station building with
approximately 60 meters away from the site.
The cabinet requirement : 1. No requirement as the cabinet will be installed
inside the signaling building.
2. Install cable tray from the cabinet to the tower.
The tower
Supporting condition : Not supported before (requires a new one).
High : 65 meters will be increase 15 meters.
Concrete Base : Good condition
No of antennas : 2.
Air Craft Warning Light : Not working (requires a new one).
Earth connection : Not connected (requires a new one).
Lightening protection system : Not connected (requires a new one).
The Site
Area : 25 m * 20 m.
Boundary wall : Needs a new boundary wall 3 m heights & 1 meter
barbed wired.
Electric Source : Inside the old shelter
The cabinet requirement : 1. Concrete base for the outdoor cabinet 3*3m.
2. Build a steel umbrella.
3. Install cable tray from the cabinet to the tower.
The tower
Supporting condition : Not supported before (requires a new one).
Height : 55 meters it will be increase 15 meters.
Concrete Base : Buried under the sand
No of antennas : 1.
Air Craft Warning Light : Not working (requires a new one).
Earth connection : Not connected (requires a new one).
Lightening protection system : Not connected (requires a new one).
The Site
Area : 19 m * 16 m.
Boundary wall : Needs a new boundary wall 3 m height & 1 meter
barbed wired.
Electric Source : Inside the old shelter
The cabinet requirement : 1. Concrete base for the outdoor cabinet 3*3m.
2. Build a steel umbrella.
3. Install cable tray from the cabinet to the tower.
13- Shalufa:
The tower
The Site
Area : 18 m * 12 m.
Boundary wall : Needs a new boundary wall 3 m high & 1 meter
barbed wired.
Electric Source : Directly from electric pole
The cabinet requirement : 1. Concrete base for the outdoor cabinet 3*3m.
2. Build a steel umbrella.
3. Install cable tray from the cabinet to the tower.
14- Fanara:
The tower
Supporting condition : Not supported before (requires a new one)..
Height : 65 meters.
Concrete Base : The concrete base has been submerged in
groundwater for a long time.
No of antennas : 2.
Air Craft Warning Light : Not working (requires a new one).
Earth connection : Not connected (requires a new one).
Lightening protection system : Not connected (requires a new one).
The Site
Area : 25 m * 20 m.
Boundary wall : Needs a new boundary wall 3 m high & 1 meter
barbed wired.
Electric Source : Directly from electric pole
The cabinet requirement : 1. Concrete base for the outdoor cabinet.
2. Build a steel umbrella.
3. Install cable tray from the cabinet to the tower.
15- Nifisha:
The tower
Area : 25 m * 15 m.
Boundary wall : Needs a new boundary wall 3 m height & 1 meter
barbed wired.
Electric Source : Directly from electric pole
The cabinet requirement : 1. Concrete base for the outdoor cabinet 3*3m.
2. Build a steel umbrella.
3. Install cable tray from the cabinet to the tower.
The tower
The Site
Area : 23 m * 12 m.
Boundary wall : Needs a new boundary wall 3 m high & 1 meter
barbed wired.
Electric Source : In the batteries room.
The cabinet requirement : 1. Concrete base for the outdoor cabinet 3*3m.
2. Build a steel umbrella.
3. Install cable tray from the cabinet to the tower.
The tower
Area : 18 m * 10 m.
Boundary wall : Needs a new boundary wall 3 m height & 1 meter
barbed wired.
Electric Source : From the railway station building with
approximately 55 meters away from the site.
The cabinet requirement : 1. Concrete base for the outdoor cabinet 3*3m.
2. Build a steel umbrella.
3. Install cable tray from the cabinet to the tower.
The tower
A new mast will be built with a height of 6 meters over the rail station.
3- The current situation of microwave towers site.
We have 6 towers only need to replace in sites (Nifisha- Shalufa- Fanra- Port Said-
Mazghona- Gabal Obaied).
We have 3 towers huawei recommends increasing the lengths of the towers to 15
meters to achieve the best connection between of them as shown below.
(Port Said-Gablal Obaied-Nifisha).
we have also 3 towers in bad condition we must replace it as shown below.
(Shalufa -Fanra-Mazghona)
Dismantling and transferring the old equipment’s and towers from the sites to El
Farz Depot.
Month 10
Month 11
Month 1
Month 2
Month 3
Month 4
Month 5
Month 6
Month 7
Month 8
Month 9
Description
W1
W3
W1
W4
W2
W4
W2
W3
W1
W2
Consultant activities+Sites
x
Survey
Working in 10 sites
without replacement x x x x x x
for old towers
Working in 6 sites with
x x x x x x x x x
replacement old towers
Making 6 towers in 3
x x x
month