ENR Microwave Towers - Phase One

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 16

1- The Purpose of Proposal

The purpose of this proposal is to replace the old towers communication by a


new one to achieve more communication efficiency in all sites and build new
boundary walls to achieve more safety for the sites as our vision.

2- The scope of work


This project has 18 sites.

1- El Marg-Cairo
 The tower

Supporting condition : Supported before. (Requires the Consultant report).


Height : 60 meters.
Concrete Base : Have some cracks & needs to be strengthened
No of antennas : 2.
Air Craft Warning Light : Not working (requires a new one).
Earth connection : Not connected (requires a new one).
Lightning protection : Not connected (requires a new one).
system
 The Site

Area : 20.5 m * 10.5m.


Boundary wall : Needs a new boundary wall 3 m height & 1 meter
barbed wired.
Electric Source : From the old shelter
The cabinet : 1. Concrete base for the outdoor cabinet.
requirement 2. Build a steel umbrella.
3. Install cable tray from the cabinet to the tower.
2- Location No. One(Main Bulding)-Cairo

 The cabinet requirement : 1. No requirement as the cabinet will be installed inside


the signaling building.
2. Install cable tray from the cabinet to the mast.

3- Location No. two(Near of six October bridge)- Cairo

 The cabinet requirement : 1. No requirement as the cabinet will be installed inside


the signaling building.
2. Install cable tray from the cabinet to the mast.

 The tower:

A mast will be built with height of 6 meters.

4- Location No. Three (New Central) -Cairo

 The cabinet requirement : 1-No requirement as the cabinet will be installed


inside the signaling building.
2-Install cable tray from the cabinet to the mast.
3-Create hole in the celling.

The tower: A mast will be with height 12 meters


5- Abu El Nomrous- Upper egypt

 The tower
Supporting condition : Supported before. (Requires the Consultant report).
Height : 100 meters.
Concrete Base : Have some cracks & needs to be strengthened
No of antennas : 2.
Air Craft Warning Light : Not working (requires a new one).
Lightning protection Working
system :

 The Site
Area : 16.5 m * 14.5m.
Boundary wall : Needs a new boundary wall 3 m height & 1 meter
barbed wired.
Electric Source : Electric panel near the entrance gate.
The cabinet requirement : 1. Concrete base for the outdoor cabinet 3*3 Meter.
2. Build a steel umbrella.
3. Install cable tray from the cabinet to the tower.

 The site plan

6- Mazghouna -Upper Egypt:


 The tower

Supporting condition : Not supported before (requires a new one)..


Height : 40 meters.
Concrete Base : Have some cracks & needs to be strengthened
No of antennas : 2.
Air Craft Warning Light : Not working (requires a new one).
Earth connection : Working.
Lightning protection system : Working.

 The Site

Area : 15.5 m * 15m.


Boundary wall : Needs a new boundary wall 3 m height & 1 meter
barbed wired plus stairs to go down in the site.
The cabinet requirement : 1. Concrete base for the outdoor cabinet 3*3
meter.
2. Build a steel umbrella.
3. Install cable tray from the cabinet to the tower.

Electric Source : Directly from electric pole


 The Site Plan

7- Ifwa-Upper Egpyt:
 The tower
Supporting condition : Not supported before.
Height : 100 meters.
Concrete Base : Have some cracks & needs to be strengthened
No of antennas : 2.
Air Craft Warning Light : Working.
Earth connection : Not working (required a new one).
Lightning protection system : Working.

 The Site
Area : 20 m * 13m.
Boundary wall : Can be kept as it is.
Electric Source : Electric panel near the entrance gate.
The cabinet requirement : 1. Concrete base for the outdoor cabinet.
2. Build a steel umbrella.
3. Install cable tray from the cabinet to the tower.

 The Site Plan

8- Qaha :
 The tower

Supporting condition : Supported before. (Requires the Consultant


report).
Height : 100 meters.
Concrete Base : Have some cracks & need to be strengthened
No of antennas : 2.
Air Craft Warning Light : Not working (requires a new one).
Earth connection : Not connected (requires a new one).
Lightning protection system : Working.

 The Site

Area : 17.5 m * 11.5m.


Boundary wall : Needs a new boundary wall 3 m height & 1 meter
barbed wired.
Electric Source : The old shelter
The cabinet requirement : 1. Concrete base for the outdoor cabinet 3*3m.
2. Build a steel umbrella.
3. Install cable tray from the cabinet to the
tower.

 The Site Plan

9- Kafr Elgazzar:
 The tower
Supporting condition : Supported before. (Requires the Consultant
report).
Height : 65 meters.
Concrete Base : Have some cracks & needs to be strengthened
No of antennas : 3.
Air Craft Warning Light : Not working (requires a new one).
Earth connection : Not connected (requires a new one).
Lightning protection system : Working.

 The Site

Area : 17 m * 13m.
Boundary wall : Needs a new boundary wall 3 m height & 1 meter
barbed wired.
Electric Source : From the old shelter
The cabinet requirement : 1. Concrete base for the outdoor cabinet 3*3m.
2. Build a steel umbrella.
3. Install cable tray from the cabinet to the tower.

 The Site Plane

10- Zagazig:
 The tower

Supporting condition : Supported before. (Required the Consultant report).


Heigh : 55 meters.
Concrete Base : Have some cracks & need to be strengthened
No of antennas : 2.
Air Craft Warning Light : Not working (requires a new one).
Earth connection : Not connected (requires a new one).
Lightening protection system : Working.

 The Site

Area : 20 m * 13m.
Boundary wall : It can be kept as it is.
Electric Source : From the railway station building with
approximately 60 meters away from the site.
The cabinet requirement : 1. No requirement as the cabinet will be installed
inside the signaling building.
2. Install cable tray from the cabinet to the tower.

 The Site Plan

11- Abo Hammad:

 The tower
Supporting condition : Not supported before (requires a new one).
High : 65 meters will be increase 15 meters.
Concrete Base : Good condition
No of antennas : 2.
Air Craft Warning Light : Not working (requires a new one).
Earth connection : Not connected (requires a new one).
Lightening protection system : Not connected (requires a new one).

 The Site
Area : 25 m * 20 m.
Boundary wall : Needs a new boundary wall 3 m heights & 1 meter
barbed wired.
Electric Source : Inside the old shelter
The cabinet requirement : 1. Concrete base for the outdoor cabinet 3*3m.
2. Build a steel umbrella.
3. Install cable tray from the cabinet to the tower.

 The Site Plan

12- Gabal Obaied:

 The tower
Supporting condition : Not supported before (requires a new one).
Height : 55 meters it will be increase 15 meters.
Concrete Base : Buried under the sand
No of antennas : 1.
Air Craft Warning Light : Not working (requires a new one).
Earth connection : Not connected (requires a new one).
Lightening protection system : Not connected (requires a new one).

 The Site

Area : 19 m * 16 m.
Boundary wall : Needs a new boundary wall 3 m height & 1 meter
barbed wired.
Electric Source : Inside the old shelter
The cabinet requirement : 1. Concrete base for the outdoor cabinet 3*3m.
2. Build a steel umbrella.
3. Install cable tray from the cabinet to the tower.

 The Site Plan

13- Shalufa:
 The tower

Supporting condition : Not supported before.


Height : 65 meter.
Concrete Base : Have some cracks & needs to be strengthened
No of antennas : 2.
Air Craft Warning Light : Not working (requires a new one).
Earth connection : Not connected (requires a new one).
Lightening protection system : Working

 The Site

Area : 18 m * 12 m.
Boundary wall : Needs a new boundary wall 3 m high & 1 meter
barbed wired.
Electric Source : Directly from electric pole
The cabinet requirement : 1. Concrete base for the outdoor cabinet 3*3m.
2. Build a steel umbrella.
3. Install cable tray from the cabinet to the tower.

 The Site Plan

14- Fanara:

 The tower
Supporting condition : Not supported before (requires a new one)..
Height : 65 meters.
Concrete Base : The concrete base has been submerged in
groundwater for a long time.
No of antennas : 2.
Air Craft Warning Light : Not working (requires a new one).
Earth connection : Not connected (requires a new one).
Lightening protection system : Not connected (requires a new one).

 The Site
Area : 25 m * 20 m.
Boundary wall : Needs a new boundary wall 3 m high & 1 meter
barbed wired.
Electric Source : Directly from electric pole
The cabinet requirement : 1. Concrete base for the outdoor cabinet.
2. Build a steel umbrella.
3. Install cable tray from the cabinet to the tower.

 The Site Plan

15- Nifisha:

 The tower

Supporting condition : Not supported before (requires a new one)..


Height : 55 meters increase 15 meters.
Concrete Base : Good condition
No of antennas : 2.
Air Craft Warning Light : Not working (requires a new one).
Earth connection : Not connected (requires a new one).
Lightening protection system : Not connected (requires a new one).
 The Site

Area : 25 m * 15 m.
Boundary wall : Needs a new boundary wall 3 m height & 1 meter
barbed wired.
Electric Source : Directly from electric pole
The cabinet requirement : 1. Concrete base for the outdoor cabinet 3*3m.
2. Build a steel umbrella.
3. Install cable tray from the cabinet to the tower.

 The Site Plan

16- Quantra West:

 The tower

Supporting condition : Not supported before. (Requires the Consultant


report).
Height : 55 meters.
Concrete Base : Have some cracks & need to be strengthened
No of antennas : 2.
Air Craft Warning Light : Not working (requires a new one).
Earth connection Not connected (requires a new one).
Lightening protection system Not connected (requires a new one).

 The Site

Area : 23 m * 12 m.
Boundary wall : Needs a new boundary wall 3 m high & 1 meter
barbed wired.
Electric Source : In the batteries room.
The cabinet requirement : 1. Concrete base for the outdoor cabinet 3*3m.
2. Build a steel umbrella.
3. Install cable tray from the cabinet to the tower.

 The Site Plan

17- Port Said:

 The tower

Supporting condition Not supported before (requires a new one)..


Height : 45 meters it will be increase 15 meters.
Concrete Base : Have some cracks & needs to be strengthened.
No of antennas : 2.
Air Craft Warning Light : Not working (requires a new one).
Earth connection Not connected (requires a new one).
Lightening Protection system Not connected (requires a new one).
 The Site

Area : 18 m * 10 m.
Boundary wall : Needs a new boundary wall 3 m height & 1 meter
barbed wired.
Electric Source : From the railway station building with
approximately 55 meters away from the site.
The cabinet requirement : 1. Concrete base for the outdoor cabinet 3*3m.
2. Build a steel umbrella.
3. Install cable tray from the cabinet to the tower.

 The Site Plan

18-El Wasta Upper Egypt:

 The cabinet requirement : 1. No requirement as the cabinet will be installed


inside the railway station building.
2. Install cable tray from the cabinet to the mast.

 The tower
A new mast will be built with a height of 6 meters over the rail station.
3- The current situation of microwave towers site.
 We have 6 towers only need to replace in sites (Nifisha- Shalufa- Fanra- Port Said-
Mazghona- Gabal Obaied).
 We have 3 towers huawei recommends increasing the lengths of the towers to 15
meters to achieve the best connection between of them as shown below.
(Port Said-Gablal Obaied-Nifisha).
 we have also 3 towers in bad condition we must replace it as shown below.
(Shalufa -Fanra-Mazghona)
 Dismantling and transferring the old equipment’s and towers from the sites to El
Farz Depot.

 We have virtual time plan in below table.

Virtual Time Plan

Month 10

Month 11
Month 1

Month 2

Month 3

Month 4

Month 5

Month 6

Month 7

Month 8

Month 9
Description
W1

W3

W1

W4
W2

W4

W2

W3

W1

W2
 
 

 
Consultant activities+Sites
x                        
Survey
Working in 10 sites
without replacement       x x x x x x                  
for old towers
Working in 6 sites with
                  x x x x x x x x x
replacement old towers
Making 6 towers in 3
            x x x            
month