Title of the Paper Author Publication Problem Objectives of the Results/Findings
Year Statement Study
- To study the -Reduced cycle time
operation at by removing process elemental level (hydraulic set up) to through time balance process. Work Measurement Ishwar Line target study technique. Approach for Bhiradi 2014 backlogs due -Work Productivity to line -To eliminate the measurement Improvement in a B.K.Singh2* imbalance non-value added method productivity Heavy Machine Shop elements. got improved 35% without investing -To optimize the extra resources. This cycle time to approach explains increase the the best way of production. increasing productivity by -To evaluate the eliminating the worker’s ineffective efforts performance by the operators and the machine shop as well.--