Piamonte, Krisha Mae C.

Work Study and Measurement

BSIE-2203

Title of the Paper Author Publication Problem Objectives of the Results/Findings


Year Statement Study

- To study the -Reduced cycle time


operation at by removing process
elemental level (hydraulic set up) to
through time balance process.
Work Measurement Ishwar Line target study technique.
Approach for Bhiradi 2014 backlogs due -Work
Productivity to line -To eliminate the measurement
Improvement in a B.K.Singh2* imbalance non-value added method productivity
Heavy Machine Shop elements. got improved 35%
without investing
-To optimize the extra resources. This
cycle time to approach explains
increase the the best way of
production. increasing
productivity by
-To evaluate the eliminating the
worker’s ineffective efforts
performance by the operators
and the machine
shop as well.--