BIDS RECEIVED FROM BIDDERS

Disclaimer: The schedule of the price listed is based on all Bid Prices as submitted to
Suruhanjaya Tenaga without detailed evaluation and is not an indicator of future results. The
submissions will be subjected to detail evaluation based on the Request For Proposal
requirements.

Package P1: 10MWac to less than 30MWac

Bids Export Capacity (MWac) Bid Price (RM/kWh)


1 7.00 0.2610
2 10.00 0.2300
3 10.00 0.2165
4 10.00 0.2000
5 10.00 0.2481
6 10.00 0.2188
7 10.00 0.2333
8 10.00 0.2380
9 10.15 0.2400
10 10.95 0.2178
11 12.00 0.2250
12 12.00 0.2268
13 12.00 0.2229
14 13.00 0.2100
15 13.00 0.2310
16 13.00 0.2268
17 13.46 0.2300
18 15.00 0.2323
19 15.00 0.2392
20 15.00 0.2199
21 15.00 0.2300
22 15.00 0.2240
23 15.00 0.2050
24 15.00 0.2290
25 15.00 0.2188
26 16.00 0.2380

Page 1 of 4
Bids Export Capacity (MWac) Bid Price (RM/kWh)
27 17.00 0.2099
28 17.36 0.2189
29 17.40 0.2149
30 20.00 0.1850
31 20.76 0.2189
32 25.00 0.2179
33 26.00 0.2280
34 26.53 0.2256
35 29.00 0.2392
36 29.90 0.2280
37 29.90 0.2038
38 29.90 0.2248
39 29.975 0.2300
40 29.99 0.2300
41 29.99 0.1786
42 29.99 0.2277
43 29.99 0.2033
44 29.99 0.2094
45 29.999 0.1919

Package P2: 30MWac to 50MWac

Bids Export Capacity (MWac) Bid Price (RM/kWh)


1 30.00 0.1950
2 30.00 0.1993
3 30.00 0.2089
4 34.00 0.1860
5 40.00 0.2050
6 45.00 0.1999
7 45.00 0.1999
8 49.18 0.1598
9 50.00 0.1693
10 50.00 0.1948
11 50.00 0.2250
12 50.00 0.2260
13 50.00 0.2380
14 50.00 0.2200
15 50.00 0.2300
16 50.00 0.2200
17 50.00 0.2270
18 50.00 0.1688
19 50.00 0.1860
20 50.00 0.2088
21 50.00 0.2150

Page 2 of 4
Bids Export Capacity (MWac) Bid Price (RM/kWh)
22 50.00 0.2200
23 50.00 0.1849
24 50.00 0.2380
25 50.00 0.2388
26 50.00 0.1995
27 50.00 0.2048
28 50.00 0.2080
29 50.00 0.2050
30 50.00 0.1955
31 50.00 0.2100
32 50.00 0.2150
33 50.00 0.2077
34 50.00 0.1999
35 50.00 0.2300
36 50.00 0.2077
37 50.00 0.1680
38 50.00 0.1887
39 50.00 0.1898
40 50.00 0.2130
41 50.00 0.1845
42 50.00 0.1848
43 50.00 0.2063
44 50.00 0.2065
45 50.00 0.1949
46 50.00 0.1780
47 50.00 0.2360
48 50.00 0.1950
49 50.00 0.1744
50 50.00 0.1950
51 50.00 0.1950
52 50.00 0.1717
53 50.00 0.1399
54 50.00 0.1899
55 50.00 0.1768
56 50.00 0.2095
57 50.00 0.1885
58 50.00 0.2200
59 50.00 0.1888
60 50.00 0.1693
61 50.00 0.1970
62 50.00 0.1768
63 50.00 0.1708
64 50.00 0.1888
65 50.00 0.2098
66 50.00 0.2368

Page 3 of 4
Bids Export Capacity (MWac) Bid Price (RM/kWh)
67 50.00 0.1945
68 50.00 0.2188
69 50.00 0.2160
70 50.00 0.1475
71 50.00 0.1875
72 50.00 0.1998
73 50.00 0.2062
74 50.00 0.2110
75 50.00 0.21534
76 50.00 0.2039
77 50.00 0.2259
78 50.00 0.1783
79 50.00 0.2150
80 50.00 0.2259
81 50.00 0.1786
82 50.00 0.1988
83 50.00 0.2120
84 50.00 0.1791
85 50.00 0.2108
86 50.00 0.1823
87 50.00 0.1885
88 50.00 0.1798
89 50.00 0.1776
90 50.00 0.1935
91 50.00 0.2000
92 50.00 0.2040
93 50.00 0.1499

Page 4 of 4

You might also like