This document summarizes the hydraulic calculations for the Telemow Village water supply network in Sepaku Sub-district, North Penajam Paser Regency. It includes design criteria, formulas used, demand projections, pipe sizing calculations, and head loss calculations for each pipe segment in the network over a 15-year design period. The network consists of 8 pipe segments connecting 9 nodes. Calculations show the required pipe diameters to satisfy demand and maintain positive pressure throughout the network over the design lifetime.
This document summarizes the hydraulic calculations for the Telemow Village water supply network in Sepaku Sub-district, North Penajam Paser Regency. It includes design criteria, formulas used, demand projections, pipe sizing calculations, and head loss calculations for each pipe segment in the network over a 15-year design period. The network consists of 8 pipe segments connecting 9 nodes. Calculations show the required pipe diameters to satisfy demand and maintain positive pressure throughout the network over the design lifetime.
This document summarizes the hydraulic calculations for the Telemow Village water supply network in Sepaku Sub-district, North Penajam Paser Regency. It includes design criteria, formulas used, demand projections, pipe sizing calculations, and head loss calculations for each pipe segment in the network over a 15-year design period. The network consists of 8 pipe segments connecting 9 nodes. Calculations show the required pipe diameters to satisfy demand and maintain positive pressure throughout the network over the design lifetime.
Perhitungan Hidrolis Desa Telemow, Kec. Sepaku, Kab.
Penajam Paser Utara
Kriteria Desain : Formula Hazen William : Kebut. Air = 90 lt / org / hari S (slope) = ( ^H/L)*100 Pertumbuhan Pddk = 2 % / thn D (diam) teoritis = ((3.59*Q*10^6)/(S^0.54*C))^0.38 Periode Desain = 15 thn Hloss / 100 m = ((3.59*Q*10^6)/(D^2.63*C))^1.85 Faktor Jam Puncak, jp = 2 V = 4*Q/1000(3.14*(D/1000)^2) Minor Loss = 10 %
DATA BEBAN NODE BEBAN PIPA PERHITUNGAN HEAD LOSS
No Jalur Node Elevasi Beda Tinggi Pjg Pipa Slope Jmlh. Pddk Kebuth. Air Jmlh. Pddk Kebut. Air Kebut air Jmlh. Pddk Jmlh. Pddk Flow Flow Koeff HW Diam. Pipa Diam. Pipa Hloss Total Hloss HGL Sisa Kcptan Pipa h ^h L S yg dilayani Proy 15 thn Proy 15 thn jam puncak yg disuplai Proy 15 thn Jam Puncak C D teoritis D desain per 100 m (+10% minor) Tekan V (+ m) (m) (m) (%) (jiwa) (lt/d) (jiwa) (lt/dt) (l/dt) (jiwa) (jiwa) (lt/dt) (lt/dt) (mm) (mm) (m) (m) (m) (m) (m/dtk)