Backfill

Bio-Engineering Along Slope

Backfill Soil

10.0

8.0

Gabion Toe Catch Drain


Geotextile

4m Existing Gravelled Road


Existing Soil

3.0

1:10

2.5 m
10.0

150mm Thick Stone Soling


150mm Stone Soling

Fig. Typical Section of Gabion Wall at the bottom Fig. Sectional View of Gabion Wall along B - B

Rain-water flowing
in drain Vertical Catch
Sub Surface
Backfill Soil Drain
Drain

RCC Drain - Gabion


1m Cascade
Backfill

26° 0.5m
Backfill

Gabion Toe Catch Drain


Geotextile

Existing Gravelled Road


Existing Soil 5m

2.5 m

Fig. Sectional View of Gabion Wall along C - C Fig. Sectional View of Gabion Wall along D - D

CLIENT: PROJECT: CONSULTANT: TITLE: SCALE (m): DATE:


PLANET TEST (P.) LTD. Dec, 2020
KAGESHWORI MANAHARA MUNICIPALITY SLOPE STABILITY ANALYSIS OF GOTHATAR LANDSLIDE
AT CONSULTING ENGINEERS
OFFICE OF THE MUNICIPAL EXECUTIVE KAGESHOWORI MANAHARA MUNICIPALITY-8, Kathmandu Metropolitan City, Ward No-31, All Gabion Wall Section Not in Scale SHEET NO:
DANCHHI, NEPAL GOTHATAR, KATHMANDU Shantinagar, Kathmandu,Nepal