Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 3

Answer Key

Standard Operating Procedures


for Managing Waste Segregation (1)

Objective

This procedure is to ensure that waste streams in offices are managed in a way
that facilitates recycling (2).

Responsibilities and authorities

The EMS Co-ordinator (3) is responsible for ensuring the following:

 all staff and contractors, including cleaners (4), are aware of this
procedure.

 appropriate recycling infrastructure is placed around the office and in the


loading dock (5).

 contractors (6) collect the waste at the stipulated times.

 coordination (7) of monitoring of waste management.

Procedures

1. In the office, each waste stream is collected in a separate bin with clear
signs and colour coding (8), or in a worm farm, as appropriate.

2. Adequate bins shall be positioned around the office (9).

3. A worm farm is located in the kitchenette (10) on each floor, and the cafe
operates its own worm farm.

4. Limited (11) general waste bins shall be placed in the office, not at each
employee’s desk.

5. Each employee shall have a tray, box or bin for clean paper waste at their
desks (12).
6. Cleaners shall empty all bins in the office daily, and place segregated
waste (13) into specially marked bins in the loading dock for collection
purposes (14).

7. Contractors shall remove waste and deal with it according to contract


requirements. Significant contamination (15) of waste for recycling shall
be reported to the EMS Co-ordinator. Similarly, an occurrence of
significant recyclable (16) waste in the general waste bin shall also be
reported.

Training and Competency Requirements

This procedure shall be included in inductions (17) for new staff, and new
contractors who are expected to work in the agency’s office for more than two
(18) days.

Associated Documents
 Standard Operating Procedures for Separating Confidential Paper (19)
 Standard Operating Procedures for Operating A Worm Farm (20)

Waste signs (Insert associated waste signage)

(20 marks)
Marking Scheme

1. Each question is awarded one mark.


2. All answers must be written in the correct tense formation and not
more than five words.
3. No spelling mistake allowed.
4. Titles of SOP must be written using descriptive verb that defines
the purpose of the SOP.

You might also like