(2.2) Appendix A2 - Schedule of Builders Works (Esc)
(2.2) Appendix A2 - Schedule of Builders Works (Esc)
(2.2) Appendix A2 - Schedule of Builders Works (Esc)
7. From date of delivery to Philippines until 5. Safety fences and barricades at each well and
installation adequate and suitable, dry, pit, together with all other necessary safety
illuminated and secure storage space for all measures and warning signage, policing of
materials, tools and equipment, adjacent to unauthorised access over the escalator
point of installation or other mutually agreed location prior to JSEC final handover.
location on Site.
6. Adequate protection to materials and
8. An agreed delivery route for our escalator to be equipment delivered or installed at the Site.
transported to the final position clear of The Owner shall be responsible for the cost of
obstacles. any cleaning down, renewal or replacement of
equipment damaged or contaminated by or as
B. Works and facilities to be provided during a result of the operations of other trades.
the Installation Activity, at such times as
may be required by Schindler. 7. Use of mess room’s latrines and the usual
facilities of a building site.