APPENDIX A: “Schedule of Builders' Works and of Facilities to

be provided by OTHERS” (ESCALATORS)


The Main Contractor will undertake or procure that parties other than JSEC undertake the
following works and provide the following facilities free of any charge to JSEC in accordance
(wherever appropriate) with the Delivery and Installation Programme and JSEC’s builders' work
and layout drawings, and the terms and conditions of the Sub-Contract Agreement: -

1. Permanent power supply (in accordance with


A. Works and facilities to be provided by our electrical requirements and approved
others prior to commencement of the JSEC contract shop drawings), including earth
Installation Activity wire, to each machine room (unless otherwise
stated, permanent power energization is
1. Dry, clean, watertight escalator pits and wells, required before the date for completion of lift
of requisite dimensions, square and vertically installation works set out in the Delivery and
plumb to within a tolerance of +20mm - 20mm Installation Programme.
in compliance with applicable British
Standards, codes of practice, local regulations 2. The permanent power supply is to include
and any legislative requirements are to be main circuit breaker (for both three-phase
made available for the exclusive use of JSEC. and single-phase supply) with lockable key
Pit and well walls shall form a smooth for safety purposes.
continuous surface.
3. Lateral and Soffit Cladding is required prior to
2. Escalators wells are to be free of non- testing and commissioning of elevator.
escalator related services and of other
obstructions. C. Facilities to be provided throughout the
Installation Activity.
3. Escalator wells, pits and related or adjoining
structural concrete works are to be capable of 1. Adequate and suitable areas for erection by
sustaining without damage or deflection all Schindler of its offices (for our exclusive use)
loads and forces generated in both temporary and other amenities.
(i.e. during installation testing and
commissioning) and permanent conditions. 2. Suitable access routes for movement of
labour, materials, tools and equipment within
4. Structural Escalator support with sufficient the Site in compliance with local regulations.
strength to withstand all loads and forces
resulting from escalator operation. 3. Hoisting facilities of adequate capacity for
movement of escalator unit, materials, tools,
5. Suitable lifting beams and hooks (including equipment and labour.
necessary design), installed, tested and
marked along the delivery route. 4. Single phase 230V temporary electric power
for hand-tools provided at earthed outlets at
6. Safety fences and barricades at escalator well head and pit locations of each escalator,
together with all other necessary safety together with adequate temporary lighting for
measures. safe working in each such area.

7. From date of delivery to Philippines until 5. Safety fences and barricades at each well and
installation adequate and suitable, dry, pit, together with all other necessary safety
illuminated and secure storage space for all measures and warning signage, policing of
materials, tools and equipment, adjacent to unauthorised access over the escalator
point of installation or other mutually agreed location prior to JSEC final handover.
location on Site.
6. Adequate protection to materials and
8. An agreed delivery route for our escalator to be equipment delivered or installed at the Site.
transported to the final position clear of The Owner shall be responsible for the cost of
obstacles. any cleaning down, renewal or replacement of
equipment damaged or contaminated by or as
B. Works and facilities to be provided during a result of the operations of other trades.
the Installation Activity, at such times as
may be required by Schindler. 7. Use of mess room’s latrines and the usual
facilities of a building site.

Schedule of Builder’s Works (Escalators) Page 1 of 2


8. A centrally located area in which JSEC is able
to deposit rubbish for removal, by others, from
Site.

9. Work area to be kept free from scaffold until


JSEC have obtained final acceptance for the
escalator installation.
10. Clean and dry waterproof environment
throughout our installation programme.

11. Water and power consumption cost during


installation and commissioning works.

Schedule of Builder’s Works (Escalators) Page 2 of 2